Provides Info Re Cycle 7 Reload Analysis & Schedule Related to TS Change Requests
ML20105B473
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/11/1992
From: Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F192-0309, W3F192-309, NUDOCS 9209180401
Download: ML20105B473 (2)


Text

- - _ _ _ _ _.

M,ENTERGY Entergy Operations,Inc.

-=:r 4

J' R. F. Curski W3F192-0309 A4.05 QA September 11, 1992 U.S. Nuclear Regulatory Commission ATTN

Document Con'rol Desk Washington, D.C.

20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Submittal of Cycle 7 Reload Related Technical Specification Change Requests The purpose of this letter is to provide the NRC staff with advanced information regarding the Waterford 3 Cycle 7 reload analysis and schedule.

Since reload related technical specification (TS) changes are anticipated for Cycle 7, it is hoped the information herein would be beneficial to the Staff for resource planning purposes.

Although TS changes are likely, it is not possible at this time to identify the technical specifications that could be impacted; however, as the impacted technical specifications are identified, this information will be communicated to the NRC along with estimated submittal dates for the change requests.

Waterford 3 plans to submit reload related TS change requests at least six months prior to the applicability date and will submit each change request upon completion.

An exact key milestone cchedule associated with Cycle 7 cannot be determined at this time because such a schedule is dependent on plant performance; however, we have developed the following "best estir?te" schedule, which could be used for planning purposes:

i t

15G101 69h I 92oviso4o1 vaogu PDR ADDCK 050003gg

'O 0

P ppy

i i

C*

i 4

U.D. Nuclear Regulatory Commission Submittsi of Cycle 7 Reload Related kechnical Specification Change Request W3F192-0309 Page 2 September 11, 1992 MILESTONE DATE l

Cycle 5 End Date 9/18/92 Cycle 6 Start Date 11/15/92 Core Design Finalized 1/*'/93 Draft Reload Analysis Report (RARi and TS Changes'from ABB/

CE to Waterford 3 7/15/93 Completed RAR and TS Changes j

From ABB/CE to Waterford 3

'/93 l

Submit RAR and TS Changes to NRC 11/16/93

{

Cycle 6 End Date 3/18/94 Cycle 7 Start Date 5/15/94 j

It should be noted that analysis methoaology changes should not be required to support Cycle 7; therefore, the submittal of new methodology topicals are not. anticipated.-

1 Should you have any questions regarding this matter, please contact Roy Prados at (504) 739-6632.

i Very truly yours, R.F. Burski Director, Nuclear Safety 4-RFB/RWP/dc cc:

J.L. E t i' soar., NRC Region IV D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reync.1ds NRC Resident Inspectors Office.,

).