- B11388, Responds to NRC Re Violations Noted in Insp Rept 50-336/80-11.Corrective Actions:Radiation Monitors Relocated to Lower Background Radiation Area Using New Offstream Liquid Effluent Monitors & Associated Electronics + (ML20101T904)
- 05000454/LER-1984-038-03, :on 841231,control Room Ventilation Sys Switched to make-up Mode of Operation.Caused by Spurious High Radiation & Interlock Alarm on Radiation Monitor OPR34J.Noise Suppression Devices Installed + (ML20101T911)
- 05000454/LER-1984-021-02, :on 841127,main Control Room Ventilation Sys Switched to ESF Mode.Caused by Main Control Room Process Radiation Monitors Failing Automatic Check Source Tests Due to Insufficient Tolerance in Check Setpoints + (ML20101T913)
- ML20101T916 + (ML20101T916)
- 05000334/LER-1984-011, :on 841012,eight Main Steam Safety Valve Lift Settings Found Outside Tech Spec Limits.Caused by Setpoint Drift.Valves Adjusted & Tested + (ML20101T921)
- ML20101T926 + (ML20101T926)
- ML20101T933 + (ML20101T933)
- ML20101T944 + (ML20101T944)
- ML20101T963 + (ML20101T963)
- SNRC-1969, Erratum to Author (LSNRC-1929) Re Decommissioning Plan Changes for Component Cutting/Removal Techniques.Last Line of Page 2 Was Inadvertently Omitted Due to Formatting Error + (ML20101T970)
- ML20101T979 + (ML20101T979)
- ML20101T980 + (ML20101T980)
- ML20101T985 + (ML20101T985)
- ML20101T988 + (ML20101T988)
- 05000373/LER-1985-001-01, :on 850102,level Switches LIS-B21-N100A & B for HPCS Injection Valve High Reactor Level Closure Found Out of Tolerance in Nonconservative Direction.Caused by Instrument Drift.Switch Setpoints Recalibr + (ML20101T990)
- ML20101T993 + (ML20101T993)
- 05000483/LER-1985-001-01, :on 850102,inadvertent Steam Generator lo-lo Level Reactor Trip Occurred.Feedwater Isolation Valve Fast Closed.Caused by Failed Solenoid in Valve Control Circuit + (ML20101T999)
- ML20101U002 + (ML20101U002)
- ML20101U007 + (ML20101U007)
- 05000280/LER-1985-001, :on 850101,safe Signal Placed in Loop B Channel 2 of Overtemp Delta T W/O Cognizance of Operations or Instrumentation Staff.Caused by Lack of Administrative Controls.Event Will Be Reviewed + (ML20101U009)
- 05000327/LER-1985-003, :on 850104,Tech Spec Max Allowable Surveillance Instruction Performance Date Exceeded by 52 Days.Caused by Miscalculation of Date.Use of Std Form to Calculate & Document Max Allowable Dates Initiated + (ML20101U013)
- 05000388/LER-1984-021, :on 840930,reactor Scrammed Due to Turbine Trip on Moisture Separator B Drain Tank High Level During Performance of Startup Test to Determine Max Feedwater Pump Runout Capabilities.Check Valve Installed + (ML20101U020)
- 05000364/LER-1992-009, :on 920617,agastat Timers on Diesel Generator Sequencers Failed to Meet Acceptance Criteria.Caused by Inadequate Calibration Procedures.Timer Replaced & Rev 6 to Calibr Procedure FNP-0-EMP-1549.01 Issued + (ML20101U029)
- ML20101U034 + (ML20101U034)
- 05000373/LER-1985-002-01, :on 850105,condensate Pumps 1B & 1D Automatically Tripped,Resulting in Low Water Level Condition in Reactor Vessel.Caused by Increase in Stator Water Conductivity.Operator Involved Counseled + (ML20101U036)
- ML20101U041 + (ML20101U041)
- ML20101U042 + (ML20101U042)
- 05000373/LER-1985-003, :on 850106,reactor Water Cleanup Sys Isolated on High Differential Flow.Caused by Reactor Startup.Sys Restarted.Ge Investigating Design Basis for Isolation Setpoint + (ML20101U045)
- ML20101U046 + (ML20101U046)
- RBG-19962, Interim Deficiency Rept DR-275 Re Defective Welded Studs for Variable Inlet Vane Assembly on Four Fans Supplied by Buffalo Forge Co for Standby Gas Treatment Sys & Fuel Bldg Charcoal Units.Next Rept by 850207 + (ML20101U048)
- DCL-92-138, Forwards Public Version of Revised Sops,Including III.06 HP-7, Evacuee Decontamination, III.06 HP-9, Emergency Worker Decontamination, III.13, County Air Pollution District & III.40.W/920713 Release Memo + (ML20101U049)
- ML20101U050 + (ML20101U050)
- ML20101U055 + (ML20101U055)
- ML20101U056 + (ML20101U056)
- ML20101U059 + (ML20101U059)
- JPN-92-033, Forwards Ja FitzPatrick Nuclear Power Plant 1992 FSAR Update, Consisting of Revs to Chapter 17, QA Program to Reflect Title Changes & Update of Cross Refs of Implementing Documents + (ML20101U060)
- ML20101U061 + (ML20101U061)
- 05000361/LER-1985-004, :on 850101,discovered Weekly Purge Samples Not Taken for Containment Purge Initiated on 841224.Caused by Personnel Error.Chemistry Foremen & Technicians Counseled + (ML20101U064)
- 05000352/LER-1985-001-01, :on 850101,reactor Water Cleanup Sys Outboard Isolation Valve Closed to Isolation Position.Caused by Signal from High Temp Logic Circuit of NSSS Due to Temp Switch Setting on Read.Sys Returned to Svc + (ML20101U067)
- ML20101U072 + (ML20101U072)
- 05000315/LER-1985-001, :on 850105,fire Watch Failed to Conduct 2330 Hourly Insp of Inoperable Fire Barrier Penetration Seals & Dampers in Unit 1 & 2 Charging Pump Rooms.Caused by Inadequate Turnover of Tour Assignments + (ML20101U074)
- ML20101U075 + (ML20101U075)
- ML20101U077 + (ML20101U077)
- ML20101U082 + (ML20101U082)
- ML20101U083 + (ML20101U083)
- RBG-19960, Interim Deficiency Rept DR-252 Re Defective Trunnion Welds on Pipe Support Components Supplied by Bf Shaw Co.Interim or Final Rept Will Be Provided by 850207 + (ML20101U085)
- ML20101U086 + (ML20101U086)
- RBG-19992, Final Deficiency Rept DR-251 Re Midguard Restraints Functioning as Deadweight Supports for Process Piping in 11 Type 12 Penetrations.Item Not Reportable Under 10CFR50.55(e) + (ML20101U092)
- 05000247/LER-1984-026, :on 841228,spurious Safety Injection Signal Occurred Due to High Steam Flow Signals.Caused by Nonlinearity of Errors.Transmitter Sensing Tubes Blown Down, Vented & Placed in Svc + (ML20101U093)
- 05000275/LER-1985-001, :on 850102,while in Mode 1,low Flow in RCS Initiated Reactor Trip.Caused by Turbine Overspeed Protection Controller Sys Solenoid Valve Failure.Valve Replaced + (ML20101U098)
- RBG-19961, Final Deficiency Rept DR-255 Re Improper Adjustment of Topaz Inverters Supplied by Ge.Initially Reported on 841119. Inverter Drawings Revised by GE to Specify Inverter Will Not Trip at Voltages Between 100 & 140-volts Dc + (ML20101U100)