Revised Response to NRC Re Violations Noted in Insp Repts 50-327/84-18 & 50-327/84-19.Corrective Actions: Licensed Personnel Required to Take Full Requalification Exam W/No Exemptions
ML20101T916
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/21/1984
From: Domer J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20101T898 List:
References
GL-84-14, NUDOCS 8502060436
Download: ML20101T916 (3)


Text

..n A

(

Y;

.(

~

'e:

?

TENNESSEE VALLEY; AUTHORITY.

CHATTANOOGA. TENNESSI E 37401

.I 400 estnut-Street. Tower II' I

g QC Dn 9 \\ *.

~

' December ' 21, 1534 U.S. NuclM Regulatory Commission

. Region-II.

Attn:

Mr. James P. O'Reilly, Regional Adunistrator 4

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia l 30323:

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR ~ PLANT UNITS 1 AND 2 - NRC-OIE REGION II INSPECTION REPORT 50-327/84-18 AND 50-328/84 REVISED RESPONSE TO VIOLATION j

The subject OIE inspection report dated September 21, 1984 from R. C. L'ewis to H. G. Parris' cited TVA with one' Severity Level.IV Violation. TVA's' initial i

?

response to the subject inspection report was provided to NRC by the October 22, 1984 letter from L. M. Mills to you. In response to the November 20, 1984

' i letter from J. A. Olshinski to H..G. Parris, enclosed is a revised response to the item of violation. The delay in the submittal of-this response 'was l'

discussed with S. Weise of your staff in a telephone conversation on j-December 20,.1984.

,J j

If you have any questions, please get inItouch with 'R. H. Shell at.

FTS 858-2688.

To the best of-my knowledge, I declare the statements contained herein are complete and true.

l Very truly yours,,

TENNESSEE VALLEY AUTHORITY J. A. Domer Nuclear Engineer Enclosure oc (Enclosure):

s Mr. Richard C. DeYoung, Director e

Office of Inspection and Enforcement 5

U.S. Nuclear, Regulatory Commission Washington, D.C.

20555 i

Records Center 3

l

. Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 L Atlanta, Georgia 30339 B502060436 850116

~

~

o PDR ADOCK 05000327 l

G PDR

~

4 e

e 1

j a

't

.I

~'

,. An Equ I Opportunity Empi yer '

J

9 ENCLOSURE

~

RESPONSE - NRC-0IE INSPECTIOPNhPORT 4' -

NOS. 327/84-18 AND 32?/84-19

~

R. C. LEWIS' LETTER TO H. G. PARRIS SEPTEMBER 21, 1984 Items 327/84-18-01 and 328/84-19-01

,y 10 CFR 55. Agendix A.4(a) states that annual written examinations which determine areas in which mtraining is needed to upgrade licensed operator and senior cperator knowledge shall-be included in the requalification program.

c Contrary to the above, a licensee instructor at Sequoyah who is a licensed Senior Reactor Operator and who only taught a portion of the requalificabion pr6 scam.was exempted from the 1983 Sequoyah annual writ, ten efamination.

t..

Tdis is a Severity Level IV violation (Supplement 1) applicable to Sequoyah Units 1 and 2 only.

1.

Admission or Denial of the Alleged Violation ThL admits the violation occurred as stated.

?

2.

Reasons for the Violation if-Admitted The Sequoyah Nuclear Plant licensed operator mqualification training -

program, at the time of the incident, wns being carried out under -

Operations Section Training Instruction' Letter (OSLT-1, which allowed for the exemption of three licensed personnel. Those exempt were to have had primary responsibility in administering the requalification training - The wording in the OSLT was in accordandwith revision 61 of the FSAR dated j

May 1979; however, due to mcent reinterpretation of 10_ CFR 55, Appendix A.4 and Generic Letter 84-14, we exempted the instructor from the entire annual requalification examination in erece.

3.

Corrective Action Taken and Results Achieved Since the issuance of Generic Letter 84-14 requiring licensed facilities to provide greater detail of their retraining programs.in a revision to :

the FSAR, all licensed personnel at Sequoyah have been required to take the full'requalification examination, and no persons will be exempt. The instructor involved has already taken and satisfactorily completed.the 1984 requalification examination. TVA plans to continue this practice

'until approval of-our submittal to Generic Letter 84-14. At that time, d-I."

the' requalification program will be conducted as approved by NRC from this

~

submittal.

s

a 4

4

?

n:m

=

~

, ;;g -

['

%.:,$,b p&:h!)

~ i "

~

[h. 3.; X[ MQypiMiB/$

.s

,Eg"'-3t f,fn $$&

),l, w ; 4,

.s: lg ?

g[I,' b

  • j*Qf

%f='

l

"?

3

,x :

_ wcjmiwsg '~ " LP

-aa.

M 34 p:n;t;g m, bj;NN[2

~,

+ [d%[n/MMjfj]Q r 9f hN

[2 M m w ~

OJQM swc r--r r.

4. ' Crrrectiva Action, Tck:n tn Avmidd Furthre Violetions As stated in item 3, our response to Generic Letter 84-14 will provide more detail to our retraining program and should eliminate any misinterpretation of NRC positions on this matter. Furthermore, this submittal will confirm our program. The submittal should be forwarded to NRC by April 15, 1985.

5.

Date When Full Compliance Will Be Achieved

.Sequoyah Nuclear Plant will complete the 1984 requalification program with all licensed personnel completing the examination by January 1, 1985.