Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0792-02, Forwards 15-day Rept of Eddy Current Insp of once-through SG Tubes on 920629 + (ML20101S351)
- ML20101S352 + (ML20101S352)
- ML20101S356 + (ML20101S356)
- ML20101S360 + (ML20101S360)
- IR 05000289/1972007 + (ML20101S365)
- IR 05000289/1972012 + (ML20101S370)
- ML20101S377 + (ML20101S377)
- ML20101S386 + (ML20101S386)
- ML20101S406 + (ML20101S406)
- ML20101S413 + (ML20101S413)
- 05000352/LER-1992-011, :on 920605,inoperabilty of Channel B of Main Steam Line Radiation Monitoring Sys Occurred as Result of Inadequate Electrical Separation.Wiring Sleeved on 920629 + (ML20101S428)
- ML20101S430 + (ML20101S430)
- U-602008, Monthly Operating Rept for June 1992 for Clinton Power Station Unit 1 + (ML20101S435)
- ML20101S436 + (ML20101S436)
- ML20101S438 + (ML20101S438)
- ML20101S439 + (ML20101S439)
- ML20101S445 + (ML20101S445)
- ML20101S449 + (ML20101S449)
- ML20101S450 + (ML20101S450)
- ML20101S452 + (ML20101S452)
- ML20101S454 + (ML20101S454)
- ML20101S455 + (ML20101S455)
- ML20101S457 + (ML20101S457)
- L-83-284, Forwards Response to Generic Ltr 83-28,Item 4.5.3 Re Reactor Trip Reliability.Review of Existing Tech Spec Intervals for on-line Functional Testing of Reactor Protection Sys Provided,Per 841207 Commitment + (ML20101S460)
- ML20101S462 + (ML20101S462)
- ML20101S464 + (ML20101S464)
- 05000338/LER-1984-019, :on 841114,trip from 100% Power Occurred Due to Vital Bus Inverter Failure.Inverter Was Supplying Power to 125-volt Ac Vital Bus 1-III.Caused by Deenergization of Bus & Associated Equipment + (ML20101S470)
- ML20101S471 + (ML20101S471)
- ML20101S473 + (ML20101S473)
- 05000219/LER-1992-008, :on 920608,one Isolation Condenser Became Inoperable Requiring TS Required Shutdown.Caused by Packing Leak on V-14-33 Attributed to Scored Stem.Stem Stoned & Smoothed & Valve Repacked & Returned to Svc + (ML20101S476)
- ML20101S480 + (ML20101S480)
- SNRC-1141, Responds to NRC Re Violations Noted in Insp Rept 50-322/84-46.Corrective Actions:Draft Rept Re Engineering Review of Fire Detectors for Compliance W/Nfpa 72D/E Issued. Hourly Fire Watch Patrols Instituted + (ML20101S485)
- ML20101S487 + (ML20101S487)
- ML20101S490 + (ML20101S490)
- ML20101S491 + (ML20101S491)
- ML20101S493 + (ML20101S493)
- ML20101S499 + (ML20101S499)
- ML20101S504 + (ML20101S504)
- ML20101S507 + (ML20101S507)
- B11422, Forwards Responses to Power Sys Branch 840802 Mechanical Series SER (NUREG-1031) Open Item 2.6,Confirmatory Items 56 & 57 & License Conditions 4,5,6 & 7 + (ML20101S508)
- 2CAN018502, Application for Amend to License NPF-6,clarifying Intent of Tech Spec 4.6.2.2.e Re Sodium Hydroxide Addition Sys.Fee Paid + (ML20101S510)
- ML20101S512 + (ML20101S512)
- ML20101S518 + (ML20101S518)
- ML20101S525 + (ML20101S525)
- ML20101S527 + (ML20101S527)
- ML20101S529 + (ML20101S529)
- ML20101S533 + (ML20101S533)
- ML20101S536 + (ML20101S536)
- ML20101S543 + (ML20101S543)
- ML20101S549 + (ML20101S549)
- ML20101S550 + (ML20101S550)