TABLE 3.2.B (CONTINUED)
INSTRUMENTATION TIIAT INITIATES OR CONTROLS TIIE CORE AND CO!ITAINMENT' COOLING SYSTEMS Micicum No.
Of Operable Number of..'Instru-In3trument Trip Function Trip Level Setting-ment Channels Pro-Remarks Chtuncls Per
^ Trip. System (1) vided by Design 1.
Core Spray Sparger
'l ( +/-l. 5 ) psid 2 Inst. Channels Alarm to detect core-to Reactor Pressure Vessel d/p spray sparger pipe break.
2 Condensate Storage
>/= 5 feet above 2 Inst. Channels Provides interlock to i
. Tank Low Level tank bottom j
IIPCI pump suction -
valves.
'I 2
Suppression Chamber
</= 5 inches above 2 Inst. Channels Transfers IIPCI pump High Level torus midpoint suction to suppression chamber.
1 l
l l
j@R*Mok??
P
TABLE 4.2.B MINIMUM TEST AND CALIBRATION FREQUENCY FOR CSCS Instrument Channel Instrument Functional Test Calibration Frequency Instrument Check 1)
Reactor Water (1) (3)
Once/ operating cycle Once/ day Level (7) 2)
Drywell Pressure (1) (3)
Once/ operating cycle Once/ day (7) 3)
Reactor Pressure (1) (3)
Once/ operating cycle Once/ day (7) 4)
Reactor Pressure -
(1)
Once/3 months None PCIS/LPCI Interlock 5)
Auto Sequencing NA 4
Timers Once/ operating cycle None 6)
Once/3 months None Pump Disch. Pressure Interlocks 7)
Trip System Bus (1)
NA Power Monitors None 8)
Core Spray (1)
Once/6 months Sparger d/p Once/ day 9)
Steam Line High (1)
Once/3 months Flow (HPCI & RCIC)
None
- 11) Steam Line High (1) (3)
Once/ operating cycle Once/ day Temp. (HPCI & RCIC) 12)
Safeguards Area (1)
Once/3 months High Temp.
None
TABLE 4 2..B (CONTINUED)
MINIMU11 TEST AND CALIBRATION FREQUENCY FOR CSCS Instrument Channel Instrument Functional Test Calibration Frequency Instrument Check
Once/3 months None Steam Line Low Pressure
- 14) HPCI Suction Source (1)
Once/3 months Levels None
- 17) LPCI/ Cross Connect Once/ refueling cycle N/A N/A y
Valve Position
- 18) 4KV Emergency Power Once/ month Source Degraded once/ operating cycle None Voltage Relays (IAV,CV-6,ITE)
)
TABLE 4.2.F MINIMUM TEST AND CALIBRATION FREQUENCY FOR SURVEILLANCE INSTRUMENTATION Instrument Channel Calibration Frequency Instrument Check 1)
Reactor Leval Once/6 months Once Each Shift 2)
Reactor Pressure Once/6 months Once Each Shift 3)
Drywell Pressure Once/6 months Once Each Shift 4)
Drywell Temperature Once/6 months Once Each Shift S)
Suppression Chamber Water once/ operating cycle **
Once Each Day **
Temperature Once/6 months ***
Once Each Shift ***
6)
Suppression Chamber Water Level Once/6 months Once Each Shift i
7)
Control Rod Position NA Once Each Shift 8
8)
Neutron Monitoring (APRM)
Twice Per I!cek Once Each Shift 9)
Safety / Relief Valve Position Once/ Operating cycle Once/ Month Indicator (acoustics)
- 10) Safety / Relief Valve Position NA*
Once/ month Indicator (thermocouple)
- 11) Safety Valve Position Once/ operating cycle Once/ month Indicator (Acoustics)
- 12) Safety Valve Position NA*
Once/ month Indicator (thermocouple) o Perform instrument functional check once per operating cycle 00 Effective when modification associated with this amendment request is complete.
000 Delete when modification associated with this amendment request is complete.