E ~~M ,

a p.: - T. S . 6 '. 9 .1. 6 -

3925003590 ,

m. -., PHILADELPHIA ELECTRIC COMPANY

.. LIMERICK GENERATING STATION

,~ - P. O. BOX 2300 --

> PututOWN, PA 19464-0920-(215) 327-1200. EXT, 3000 July.10, 1992

. GRAHAM M. HITCH - Docket Nos. 50-352

- me msom 50-353 uuenaaemwmsxmcw  !

R License Nos. NPF-39 NPF-85' c1

+

U.-. S. . Nuclear: Regulatory Commission Atent- Document Control Desk LWashington,- DC t

20555-

Subject:

Limerick _ Generating Station-Monthly Operating Report For Unict'1 and 2' Enclosed are;the monthly operating reports for Limerick Units:

1:and 2i for the month-'of .TO.ne,1992 forwarded pursuarr to Technical

> Specification 6.9.1.6.

i Verv -

yours,

,Af;p 7- cKWM/dtc

. Enclosures! -

cc: '.T. T." Martin, Administrator, Region I,.USNRC

  • T. J.._ Kenny, USNRC Senior-Resident Inspector
l. g 9207170076'920630'
, > PDit t ADOCK-050003S2 ;I

.LR. PDR ,

, , , r ,# r .-e....#.-. . ~. . . . . . . - - - .

...J. z- _ . . _ - . - - -

s

  • 3925003590 Docket No. #50-352 Attachment to Monthly Operating Report for June 1992

. LIMERICK GENERATING STATION UNIT 1 JUNE 1 THROUGH JUNE 30, 1992 I. NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES

-Limerick Unit 1 began the month, in OPCON 4 (Cold Shutdown).

Unit.1 ended this reporting period in' day 102 of the Refueling Outage.

II. CHALLENGES TO MAIN STEAM SAFETY RELIEF VALVFJ

There were no challenges to the Main Steam Safety Relief Valves during the month of May.

cprtgex1

s .

AVERAGE DAILY UNIT POwEE LEVEL ~

~

DOCKET NO. 50 - 352 UNIT LIMERICK UNIT 1 ,

CATE JULY B. 1992 COMPANY PHILADELPHIA ELECTRIC COMPANv KARL MECM REPORTS SUPERVISOR BUSINESS UNIT LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 MONTH JUNE 1992 DAY AVERAGE DAILY POWER LEVEL DAV AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 0 17 0 4

2 C 18 0 3 0 19 0 4 0 20 0 5 0 21 C 6 0 22 0 7 0 23 0 8 0 24 U 9 0 25 0 10 0 26 0 1- 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 16 0

3925003590-OPERATING DATA RE.JAT DOCKET Ns. 50 - 552 DATE JULY 8 1992 .

COMPLETED BV PHILAD7LPHIA ELECTRIC COMDANY KARL MECK REPORTS SUPERVISOR l

BUSINESS UNIT 1 LIMERICK GENERATING STATION TELEPHONE (2 327-1200 EXTENSION 3320

5) l OPERATING STATUS ...._______.__ _______.____. __.--__.___.

UNIT 1 NOTES: THE UNIT WAS IN A REFUEg

1. UNIT NC- E - LIMERICK JUNE. 1992 OUTAGE THE ENTIRE PERIOD.
2. REPOR. M1 PERIOD:
3. LICENOLD THERMAL. POWER (MWT): 3293 4 NAMEPLATE RATING (GROSS MwE): 1138
5. OESIGN ELECTRICAL RATING (NET MWE): 1065
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092 7 MAXIMUM DEPENDACLE CAPACITY (NET MwE): 1055 .______..__-.______ ..__._
8. IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER S THROUGH 7) SINCE L.AST REPORT. GIVE REASONS:
9. POWER LdvE'. TO WHiCH RESrAICTED. IF ANV (NET MWE):

4

10. PEASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH VR-TO-DATE CUMULATIVE 720 4.367 56.207

11. HOURS IN REPORTING PERIOD __.._ __.. . _--_-.____-- .___.-_..___

0 1.910.2 43,719,0

12. NUMBER OF HOURS REACTOR WAS CRITICAL -______. _-_ __.____-_-__ -_..- ___.._

0.0 0.0 0.0

13. REACTOR RESERVE SHUTDOWN HOURS __.-________ . . _ - _ _ _ _ _ . _ --________..

0.0 1.903.9 42.345.8 14 HOURS GENERATOR ON-LINE -___ ___.-__ -___. _-_ __ __-__...--_-

0.0 0.0 0.0

15. UNIT RESERVE SHUTDOWN HOURS -...__-_-.. ___.__-__.__ __-_____..._

0 6.163.245 128,152.*61

16. GROSS THERMAL ENERGY GENEAATED (MWH) ___---___... ......_.._.. ___ ____._._

0 2.033.300 41.534.240

17. GROSS ELECT RICAL ENERGY GENERATED (MWH) --_-__- ____ _____ .-___. _._...__._ .
13. NET ELECTRICAL ENERGY GENERATED (MwH)
  • -5.816 1.950.470 39.761.926 PAGE 1 OF 2

p - -

- - - s , mg .; .4

,,," ;g ,. M'.

^ '

i

'QT i t.

itj s ;q

.DCCKET NOJ S0 2 .353 5

' OPERATING'DAVA REPORT.L(CONVINUEO).

2500L39D['>

1 , u. :U

'l %^ .,

w: m

'.f- w"'

.DATE JULV:S. 1992. .

-Teil$ MONTH 'YR-TO-PATE' CUMULATIVE- .

+

19. UNIT SERVICE FACTOR- 0. 0 - ~ 43.6 . 75.31 +

~

20. UNIT AVAILABILITY FACTOR- 0. 0 - ' 43. 6 - '. 7 5. 3

.._. .... . s._____.. . . . - . ____

2t'... UNIT CAPACITY. FACTOR'(USING.MDC NET)-

, '42.3 67.1

. . .._-0.0-

-22. UNIT CAPACITY' FACTOR'(USING DER NET).

0.D 42.3. 67. . ....___. . . ....._... .. _ ...

.23,. UNIT FORCED. OUTAGE RATEL :0.0. 'O.3 4.3

'24 SH;iTDOWNS'$CHEDULED OVER NEXT'6 MONTHS (TYPE, DATE. AND DURATION OF EACH):

4TH REFUSLING OUTAGE: 03/21/92: 73 DAYS

(

25. IF SHUTDOWN AT END OF R5')RT PERICO. ESTIMATED DATE OF STARTUy: -

26.' UNITS IN TEST STATUS (PRItR TO COk+;7CIAL OPERATION):-' FOnECAST ACHIEVED INITIAL CRIT *CALIT'* 12/19/84 12/22/84 INITIAL c;ECTRICITV MID ADRIL e5 4/13/85-i i

COMMERCIA .'ERATION 151 OTR 86 2/01786 l

PAGE 2 OF 2

  • - NEGATIVE VALUE REPORTED FOR CONSISTENCV WITH FEDERAL ENERG" REGULATORY COMMISSION REPORTS.-

. -. - - .. . - = . _ . - - _ _ -- - _ _ . - - .._ _-.

.c . . _ - . _ - , .

1 r

.a 4" F392500359.;0:

.-UNIT; SHUTDOWNS AND. POWERlREDUCTIONS,

~ '

-DOCKET;NO. 50 - 352 , _,

.... ...............s........

'O - ijNI T NAME LIMERICK. . UNITl N - b

.-- ..... ............. ....a~

DATE-JULY 8.'.1992- .,

REPORT MONTH . JUNE. 1992 COMPLETED BV-PHILADELPHIA ELECTRIC *CCMPANY MARL MECA .

REPORTS SUPERVISOR BUSINESS UNIT-LIMERICK'G'NERATING STATION

-TELEPHONE (215) 327 ~200 EXTENSION 3320 l l. l' METHOD 6F'L

. LICENSEE-.l SYSTEM COMPONENTI CAUSE AND CORRECTIVE l' .

TVPElDURATION REASONISHUTTING DOWN EVENT' .I CODE- . CODE' l' ACTION TO j NO.) DATE (1)l (HOURS) (2) l REACTOR (3) REPORT s- j..(4):  ;(5) l PREVENT dECURRENCE

.t- 1 13- 920601 5 720.0 C 2 .N/A' 4

'ZZ- l ZZZZZZ. THE UNIT' REMAINED IN'THE FOURTH

, i .' REFUELING OUTAGE THE ENTIRE PERIOD.

l ......

! 720.0 l c

(1) -(2) (3) (4)

F - FORCED REASON METHOD E) !IBIT G- INSTRUCTIONS S- SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOH PREPARATION OF DATA B - MAINTENANCE OR TEST  ! . MANUAL SCRAM. ENTRY SHEET! FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT DEPORT-(LER)

D- REG.uATO7V RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUFEG-0161)

E - OSERATOR TRAINING + LICENSE EXAMINATION P - ADMINISTRATIVE .. (5)

G - OPERATIONAL ERROR (EXPLAIN)

  • H - OTHER(EXPLAIN) EXV? BIT I - SAME SOURCE t

5 i

- 1 - r -. .

. 3925003590 V-Docket No. #50-353 Attachment to Monthly Operauing Report for June 1992 LIMERICK GENERATING STATION UNIT 2 JUNU 1 THROUGH JUNE 30, 1992 I. NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES L .aerick Unit 2 began the month of June at 100% of rated thermal power. On i'desday, June 2, reactor power was reduced to 68% to support repair of the '2A' _ Condensate Pump which had been exhibiting hi ' vibration. Early on Wednesday, June 3, reactor power was returned to 100% of rated thermal power. On Wednesday, June 17, reactor power was briefly reduced to 95%

of rated thermal power for a control rod pattern adjustment.

Unit 2-ended this operating period at 100% of rated thermal power.

Operational events that occurred during the mc.ath of June include:

The ' 2A' and ' 2B' Residual Heat Removal (RHR) suppr3ssion pool cooling line flow orifices were renoved to ensure compliance with the Technical Specification requirement for heat exchanger flow due to diagnostically identified leakage a through the respective RHR heat exchanger bypass valves.

Respective surveillance requirements have been verified.

-At 2031 hou.rs on Sunday, June 21, during performance of an +

'0A' Standby Gas Treatment System (STGS)/ Reactor Enclosure Recirculation Syste.m (RERS) monthly flow surveillance test, an actuation of a~ Reactor Enclosure Blowout (Relief) panel occurred. The respective panel was successfully reinstalled at 2116 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.05138e-4 months <br />. Secondary containment was declared operable at 2350 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94175e-4 months <br /> following maintenance rework. A four hour notification was made to the NRC pursuant to ICCFR50.72 (b) (2) (iii) (c) .

II. CHALLENGES TO MAIN STEAM SAFETI RELIEF VALVES There - were no challengee to the Main Steam Safety Relief Valves during.the month, oprtgex2

.,  ;* 14 s: ,

1 ,

~ -

'A yI m fJ .143.,

  • P-f~ -

~

, , ;- L : q';. "

g .

4- _ .

.., - i

.;;3..--,.

} q_._Dhm

- . r e.

/

, . , AVERAGE ^ DOILY . . . . UNIT. POWER, LEVEL-  % . . e.

L. 1

, .t .r # M - -

s ..-

~

DOCv,ET.: NO.L-.50.. - 353 '

....L_.4......;a.......'. -

UNIT LIMERICM ' UNIT.2 -

j 4;: .; pf DATE OULv'8 1992' '

l COMPANY PHILADELPHIA ELECTRIC.COVPANY KARL EECK REPORTS SUPERVISOR. -

BUSINESS. UNIT' LIMERICK GENERATING STATION' 327-1200 EXTENSION 3320 ,

3:

TELEPHONE'.(215) -

, . MONTH' JUNE 1992 DAV -AVERAGE DAILY' POWER LEVEL DAY. AVERAGE DAILV POWER LEVEL

~(MWE-NET)- 1 (wwE-NETj l

4' i :1044' 17 1048'.

+

2 762 '8 1050 3 1036 19 - 1044 4 1050 20 1046

+

5 1036 2$ 1052 6 1048- 22- 1051 7' 1037 23- 1055 8 1038 24 .1045

, 9- 1050 25- 1048 10 1050 26 1045 11 1048 27 1045 12 1047- 28 1047 13 1051 '29: 1045 i4 1038- 30 - 1035 15 1046 16 '1048 L

L

'm' 4 5 g 'e " - 4 6

- _ _-, o

~

LOPERdTING DaTALREPORT-

'3 9 2-5

- jJ 0 0 3 5 "( ' - p.

... : r

..a &"

~

DOCKET NO/ 50 -L353_ ,

DATE JULY 8."1992 - --g-

............-- .......... .. ,y COMPLSTED BY phi.LADELPHIA ELECTRIC COMPANV'

..........._-.. . e.. ...-- .

MARL MECK:

' REPORTS SUPERVISOR

  • ~

BUSINESS UNIT .

LIMERICM GENERATING STATION TELEPHONE (2:5) 327-1200 EATENSION-3320 *

= OPERATING STATUS * ~ ' ' ' '

1. UNIT NAME: LIMERICK UNIT'2 '

. NOTES: THERE wAS ONE' LOAD'

'2. REPORTING PERIOD: JUME,.1992' REDUCTION GREATER THAN

. 3. LICENSEC THERMAL POWER (MWT): 3293. 20% DURING'THE MONTH,

'.1138 -

4 NAMEPLATE RA'ING (GR055'MWE): .-------...-....

5. DESIGN ELECTRICAL RATING (NET-MWE): 1055
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1092l )

i

7. MAXIMUM OEPENDABLE CAPACITY'(NET MWE): 1055 l
8. IF. CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPJRT. GIVE REASONS:

9 POWER LEVEL TO WHICH RESTRICTED,'IF ANY (NET'MmE):

10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 720 4.36T 21.719 12, NUMBER.0F HOURS REACTOR WAS CRITICAL 720.0 4.367.0 18.955.3 13, dEACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 720.0 4.367.0 18.466.2

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY'GENEPATED (MWH) 2.348.347- 14.113.865 59.385.261
17. GROS 5 ELECTRICAL ENERGY GENERATED (MWH) 776.930 4.703.900 19.635.536
18. NET.ELECTRICAw' ENERGY GENERATED (MWH) '746.0C0 4.529.929 18.903.794 PAGE :1 OF 2

- e _ _

o p' -'

-DOCKET NO. 50 - 353 3925003590' OPERATING OATA REPORT (CONTINUED) ..

4 l

I DATE JULY 8. 1992 THIS MONTH VR-TO.DATE CUMULATIVE .

100.0 100.0 85.0

19. UNIT SERVICE FACTOR ..........-. _. --....--. ....-- . ._-

100,0 100.0 85.0

20. UNIT AVAILABILITY FACTOR . - - . . - - . . . . - ._...... ....... ---.

i 99.2 98.3 82.5 21 UNIT CAPACITY FACTOR (USING MDC NET) ------...--. ......------ --...---.... l 96.2 98.3 82.5

22. UNIT CAPACITY FAC*0R (USING DER NET) ..... - .... ......... .. ....--------

0.0 0.0 4.5

23. UNIT FORCED OUTAGE RATE .. .... ---- ---.----...- --------....
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH)-
25. IF SHUTDOWN A 'e END OF REPORT PERIOD. ESTIMATFC DATE OF STARTUp:

FORECAST ACHIEVED 26.. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

08/12/89 08/12/89 INITIAL CRITICALITY .....----. ...---- -

INITIAL ELECTRICITV 09/01/89 09/01/8L 02/01/90 01/08/90 COMMERCIAL ODERATION -----.--- ....---..

PAGE 2 OF 2 I

y ~

'DOCsdT) 5;-50 -[353 3925h03590L '

_ LNIT'SHUTOOcNS AND POWER REDUCTIONS" 2'~  :

g_

, UNIT NAME LIKERICM'......... ..'UWIT ...___....... ..

, OATE' JULY 8, 1992 -- -

.......... ... ____.._. ....' -* + s 1992 , COMPLETED Bv' PHILADELPHIA' ELECTRIC CUMPANY~

. REPORT. MONTH .....' JUNE.._..__... . . . . . . . _ _ _ _ _ _ . . . . . . _ . . . . . .

KARL MECK ._

. REPORTS SUPERVISOR SUSINESS UNIT

" LILiERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION-3320.-

......... ~...... ....._........_.- .--_........ .- _

l 1- l . METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE.

i .

lTVPE DdRATIONlREASON SHUTTING DOWN EVENT ' CODE CODE ACTION"TO-NO. j - DATE. l (1) (HOURS)l (2) REACTOR (3)- REPORT A (4) (S) PREVENT RECURREh'CE

~

l 21- 920602 l 5- 000.0 '

B 4 N/A' HH 'PUMPxx ~ LOAD WAS REDUCED TO 68% TO SUDPORT CONDENSATE' PUMP MAINTENANCE.

22 920617 5 000.0 'F 4 N/A RS CONROD  : LOAD WAS REDUCEO 5% FOR CONTROL ROD PATTERN ADJU.? MENT.

l 1 I i.

i (12 (2) (3) (4)

F . FORCED RE% SON METnOD EXHIBIT G- INSTRUCTIONS S - SCHEDULED A - EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHETTS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT RTPORT (LER).

, D - REGULATORV RESTRICTION. . 4 - OTHER (EXPLAIN) FILE ;NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (S)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(fXPLAIN) EMHIBIT I - SAME SOURCE t

4 i ..