Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101J123 + (ML20101J123)
- ML20101J144 + (ML20101J144)
- ML20101J152 + (ML20101J152)
- ML20101J156 + (ML20101J156)
- ML20101J163 + (ML20101J163)
- ML20101J173 + (ML20101J173)
- ML20101J175 + (ML20101J175)
- ML20101J178 + (ML20101J178)
- ML20101J187 + (ML20101J187)
- ML20101J193 + (ML20101J193)
- ML20101J198 + (ML20101J198)
- ML20101J209 + (ML20101J209)
- ML20101J215 + (ML20101J215)
- ML20101J219 + (ML20101J219)
- ML20101J231 + (ML20101J231)
- ML20101J241 + (ML20101J241)
- ML20101J247 + (ML20101J247)
- ML20101J250 + (ML20101J250)
- ML20101J259 + (ML20101J259)
- 05000271/LER-1996-005, :on 960227,Group 6 Isolation for HPCI Sys Inadvertently Degraded Without Taking Actions Included by Ts.Caused by Personnel Error.Plant Processes Involved W/ Design Change Preparation Reviewed + (ML20101J279)
- ML20101J291 + (ML20101J291)
- ML20101J335 + (ML20101J335)
- ML20101J339 + (ML20101J339)
- ML20101J341 + (ML20101J341)
- ML20101J347 + (ML20101J347)
- ST-HL-AE-5324, Forwards Response to Emergency Preparedness Program Weakness Identified During NRC Insp Repts 50-498/96-13 & 50-499/96-13.Corrective Actions:Condition Rept 96-2626 Written to Address Weakness Incurred During Insp + (ML20101J381)
- ML20101J387 + (ML20101J387)
- B11390, Forwards Comments on Jr Benjamin & Assoc Review of Revised Millstone Unit 3 Probabilistic Safety Study Seismic Fragility. Seismic Hazard Analysis Contained in Probabilistic Safety Study Reevaluated.Info Not Current + (ML20101J405)
- ML20101J415 + (ML20101J415)
- ML20101J416 + (ML20101J416)
- ML20101J421 + (ML20101J421)
- 05000373/LER-1984-083, :on 841124,pipe Chase Opening Found Located Above Drywell Personnel Access Hatch 740 Elevation of Reactor Bldg.Caused by Error During Const.Work Request 43798 Initiated to Fabricate Cover + (ML20101J423)
- ML20101J425 + (ML20101J425)
- ML20101J432 + (ML20101J432)
- ML20101J436 + (ML20101J436)
- ML20101J442 + (ML20101J442)
- ML20101J447 + (ML20101J447)
- 3F0396-21, Special Rept 96-01:on 960218,RM-A1 Taken Out of Svc Due to Failure of Detector to Respond to Check Source.Replacement Detector from Stores & Bench Calibrate.Expects to Return RM-A1 to Svc Prior to Restart from Refueling Outage + (ML20101J453)
- ML20101J456 + (ML20101J456)
- W3P84-3547, Forwards Executed Amend 2 to Indemnity Agreement B-92 + (ML20101J488)
- HL-5127, Ei Hatch Nuclear Plant Annual Environ Surveillance Rept for 1995 + (ML20101J499)
- ML20101J502 + (ML20101J502)
- ML20101J505 + (ML20101J505)
- ML20101J506 + (ML20101J506)
- ML20101J507 + (ML20101J507)
- NRC-96-0040, Provides Current Level of Property Damage & Decontamination Insurance for Facility,Per 10CFR50.54(w)(3) + (ML20101J520)
- PY-CEI-NRR-2040, Forwards,Per 10CFR50.54(w)(3) Requirements,Property Insurance Coverage Info for Perry Nuclear Power Plant/ Davis-Besse Nuclear Power Station + (ML20101J534)
- ML20101J549 + (ML20101J549)
- ML20101J551 + (ML20101J551)
- ML20101J552 + (ML20101J552)
- ML20101J559 + (ML20101J559)