Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101B581 + (ML20101B581)
- ML20101B584 + (ML20101B584)
- 05000412/LER-1992-006, :on 920501,bistables for Channel I Pressurizer Pressure Tripped,Resulting in Safety Injection Block Signal & ESF Actuation.Caused by Inadequate Work Request Review.Signal Reset + (ML20101B599)
- ML20101B605 + (ML20101B605)
- ML20101B608 + (ML20101B608)
- ML20101B619 + (ML20101B619)
- BSEP-96-0026, Forwards Rev 0 to NF-2495.0080, Brunswick Unit 2,Cycle 12 Core Operating Limits Rept,non-proprietary Rev 0 to 24A5195, Proprietary Rev 3 to NEDC-31624P & Rev 0 to NEDC-31624P. Encls Withheld (Ref 10CFR2.790) + (ML20101B622)
- ML20101B624 + (ML20101B624)
- ML20101B625 + (ML20101B625)
- ML20101B630 + (ML20101B630)
- ML20101B632 + (ML20101B632)
- 3F0592-12, Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (ML20101B634)
- ML20101B639 + (ML20101B639)
- ML20101B645 + (ML20101B645)
- ML20101B646 + (ML20101B646)
- ML20101B648 + (ML20101B648)
- ML20101B653 + (ML20101B653)
- ML20101B656 + (ML20101B656)
- ML20101B659 + (ML20101B659)
- ML20101B661 + (ML20101B661)
- ML20101B664 + (ML20101B664)
- ML20101B668 + (ML20101B668)
- ML20101B674 + (ML20101B674)
- ML20101B681 + (ML20101B681)
- ML20101B692 + (ML20101B692)
- ML20101B696 + (ML20101B696)
- 05000416/LER-1992-006, :on 920428,operators Received Alarm,Indicating Actuation of RPS Via Channel G of APRM Sys.On 920427, Excessive Undervessel Leakage Occurred.Caused by Electrical Short.Uncoupling Tool Removed from Svc + (ML20101B700)
- ML20101B701 + (ML20101B701)
- ML20101B707 + (ML20101B707)
- 05000324/LER-1992-013, :on 920430,unexpected Primary Containment Isolation Sys Group 6 Isolation Received & Standby Gas Trains Autostarted.Caused by Incomplete Clearance Instructions.Bus Load Lists Incorporated + (ML20101B709)
- 05000325/LER-1992-003-02, :on 920413,discovered That Foundation Bolts on Control Bldg Emergency Air Filtration Unit 2A Not in Full Contact W/Nuts.Root Cause Analysis in Progress.Angles & Bolts Removed & Replaced & Welds Fabricated + (ML20101B710)
- ML20101B711 + (ML20101B711)
- 3F0592-11, Suppls 880830 & 890913 Responses to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Potential for Adverse Thermal Effects Remains Limited to Hpi/Makeup Lines, Based on Complete Review of RCS Interfaces + (ML20101B723)
- 05000302/LER-1992-006, :on 920501,four safety-related Pipe Supports Did Not Meet Minimum Fs as Specified in NRC IE Bulletin 79-02.Caused by Design Oversight by Ae Firm in 1984.Sys Modified in Compliance W/Bulletin 79-02 + (ML20101B725)
- 05000413/LER-1992-006-01, :on 920429,particulate Activity Monitors Declared Inoperable Due to Technical Deficiency in Procedure.Calibr Procedure Revised & Particulate Activity Monitors Recalibr + (ML20101B734)
- ML20101B738 + (ML20101B738)
- ML20101B740 + (ML20101B740)
- 05000302/LER-1992-007, :on 920501,facility Determined That Calculated Input Voltage to Motor Operators on Two Steam Admission Valves May Experience Voltage Lower than Minimun Required. Caused by Initial Plant Design.Mod in Progress + (ML20101B745)
- 05000331/LER-1992-008, :on 920402,discovered That Two Bolts Broke When Subjected to Less than Required Torque Requirements.Caused by Hydrogen Induced Cracking.Bolts Replaced & Sent Offsite for Testing to Determine Cause + (ML20101B749)
- ML20101B750 + (ML20101B750)
- 05000364/LER-1992-003, :on 920502,inadvertent Actuation of ESF Equipment Occurred.Caused by Inadequate Procedural Guidance. New Procedure Was Developed to Provide Guidelines for Temp Signal Test + (ML20101B751)
- ML20101B752 + (ML20101B752)
- ML20101B753 + (ML20101B753)
- ML20101B755 + (ML20101B755)
- 05000331/LER-1984-041, :on 841111,reactor Water Conductivity Increased Above Tech Spec Limit.Caused by Resin or Air Intrusion. Operating Procedures Improved to Minimize Sys Disturbances + (ML20101B757)
- ML20101B759 + (ML20101B759)
- BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station + (ML20101B765)
- ML20101B766 + (ML20101B766)
- ML20101B768 + (ML20101B768)
- ML20101B770 + (ML20101B770)
- ML20101B777 + (ML20101B777)