Proposed Tech Specs Bases 3/4.9.7, Crane Travel - Spent Fuel & Upper Containment Fuel Storage PoolsML20101B674 |
Person / Time |
---|
Site: |
Grand Gulf |
---|
Issue date: |
05/29/1992 |
---|
From: |
ENTERGY OPERATIONS, INC. |
---|
To: |
|
---|
Shared Package |
---|
ML20101B671 |
List: |
---|
References |
---|
NUDOCS 9206040270 |
Download: ML20101B674 (2) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211E7151999-08-20020 August 1999 Proposed Tech Specs,Incorporating Many Generic Improvements Agreed Upon Between Industry & NRC Since GGNS Conversion to ITS ML20196K0831999-06-29029 June 1999 Proposed Tech Specs Page 3.4-3,reflecting Implementation of BWROG Enhanced Option I-A,reactor Stability long-term Solution ML20196G7131999-06-23023 June 1999 Proposed Tech Specs Revising TS Associated with Various Esfss Which Need No Longer Be Credited Following Design Basis Fuel Handling Accident ML20206K5361999-05-0606 May 1999 Proposed Tech Specs Pages,Changing SLMCPR ML20206R9351999-01-12012 January 1999 Proposed Tech Specs Re Refueling Equipment Interlocks Required Actions ML20154Q4511998-10-16016 October 1998 TS Bases Update for Period of 970410 Through 981015 ML20236T1661998-07-20020 July 1998 Proposed Tech Specs 3.2.4,3.3.1.1,3.3.1.3,3.4.1,5.6.5, B 3.2.4,B 3.3.1.1,B 3.3.1.3 & B 3.4.1,enabling Full Implementation of Enhanced Option I-A Long Term Solution to Address Neutronic/Thermal Hydraulic Instability Issue ML20198J3581998-01-0909 January 1998 Proposed Tech Specs,Providing Certain Clarifications to Amend & Adding Restriction to Allowed Interval Extensoions ML20198N3941997-10-28028 October 1997 Proposed Tech Specs Implementing Option B & Ref SE Issued by NRR for Ggns'S App J Exemption as Implementing Document for performance-based Leakage Testing Program ML20211M8481997-10-0606 October 1997 Proposed Tech Specs Replacement Bases Pages Associated W/Proposed Amend to License Re Response Time Testing ML20210V5581997-09-18018 September 1997 Proposed Tech Specs Reflecting Decrease of Two Recirculation Loop SLMCPR Limit to 1.11 & Single Recirculation Loop SLMCPR Limit to 1.12 ML20210H0871997-08-0606 August 1997 Proposed Tech Specs Changing TS 3.8.1, AC Sources Operating. Removal of Accelerated Testing Requirements for Standby DGs as Advised by GL 94-01 ML20141A1681997-05-0707 May 1997 Proposed Tech Specs Re Eliminating Selected Response Time Testing Requirements ML20140E3211997-04-18018 April 1997 Proposed Tech Specs,Revising TS Bases to Include Changes Made Since Rev 1 Was Sent to NRC 960201 ML20134N7841996-11-21021 November 1996 Proposed Tech Specs Pp 5.0-20 & 5.0-21,revised by Adding Footnote Indicating Proposed Change Applicable Only for Cycle 9 ML20134N7611996-11-20020 November 1996 Proposed Tech Specs Re MCPR Limits for Two Recirculation Loop Operation ML20134E1261996-10-22022 October 1996 Proposed Tech Specs Revising TS Figure 3.4.11-1, Minimum Reactor Vessel Metal Temperature Vs Reactor Vessel Procedure, Curves Using Methodology of NRC Reg Guide 1.99, Rev 2, Radiation Embrittlement of Reactor Vessel Matls ML20128M5681996-10-0909 October 1996 Proposed Tech Specs 3.8.1.14 Re Surveillance Requirements ML20117P4461996-09-19019 September 1996 Proposed Tech Specs Re Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20117M7021996-09-0505 September 1996 Proposed Tech Specs Re Min Critical Power Safety Limit ML20117G6781996-08-27027 August 1996 Proposed Tech Specs Re Surveillance Requirements for Safety/Relief Valves ML20116F0211996-07-31031 July 1996 Proposed Tech Specs Required to Support Cycle 9,reload 8 ML20113B7381996-06-20020 June 1996 Proposed Tech Specs,Redefining Secondary Containment Boundary to Allow Encl Bldg to Be Inoperable During Upcoming Refueling Outage ML20117L2581996-06-0404 June 1996 Proposed Tech Specs Re Replacement Page for Ltr RBG-42764, Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks1996-05-31031 May 1996 Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks ML20117F4661996-05-0909 May 1996 Proposed Tech Specs,Modifying SRV Surveillance Test for Relief Mode of Operation ML20117D6941996-05-0909 May 1996 Proposed Tech Specs Required to Support Unit 1 Cycle 9, Including Changes to SLMCPR & Ref for Analytical Methods Used to Determine Core Operating Limits.Addl Methodology Ref in Various TS Bases Revised to Reflect GE Methodologies ML20111B2701996-05-0808 May 1996 Proposed Tech Specs,Placing Containment Purge Valves W/ Resilient Seals on Performance Based Leakage Testing Frequency ML20108E3591996-05-0606 May 1996 Proposed Tech Specs Re Change in Co Name from Mississipi Power & Light to Entergy Mississippi,Inc ML20107E4681996-04-18018 April 1996 Proposed Tech Specs Re Fuel Loading W/Control Rods Withdrawn or Removed from Defueled Core Cells ML20100J8391996-02-22022 February 1996 Proposed Tech Specs Re Safety Setpoint Tolerance Requirements for Safety/Relief Valves ML20097C3541996-02-0101 February 1996 Proposed Tech Specs,Revising TS Bases to Include Changes Since 950221 Approval of TS Bases ML20094M8001995-11-20020 November 1995 Proposed Tech Specs Re Drywell Leak Rate Testing Requirements ML20087B5061995-08-0404 August 1995 Proposed Tech Specs Assoc W/Various ESF Sys Following Design Basis Fuel Handling Accident ML20082K3451995-04-13013 April 1995 Proposed Tech Specs Re Change to Be Reduced to Leave in TS Requirement to Test Outboard MSIV LCS Blowers ML20078S5141995-02-14014 February 1995 Proposed TS Consisting of Changes to SR 4.4.1.4.a.1 & 4.6.1.4.a.2 ML20078N6611995-02-10010 February 1995 Proposed Tech Specs Supporting Performance of Drywell Bypass Leakage Rate Surveillance on Performance Based Interval ML20079B4501994-11-0909 November 1994 Proposed Tech Specs Associated W/Various ESF Systems Following Design Basis Fuel Handling Accident ML20070C9751994-06-24024 June 1994 Proposed TS Pages 3/4 6-4 & 3/4 6-6 Associated W/Proposed Exemption to 10CFR50,App J ML20065L4971994-04-15015 April 1994 Proposed Tech Specs Re Administrative Controls ML20059H6061994-01-13013 January 1994 Proposed Tech Specs,Removing 2,324 Spent Fuel Pool Storage Limit ML20058D3911993-11-23023 November 1993 Proposed Tech Specs Bases Pages Re Cycle 7 Reload ML20059A4871993-10-22022 October 1993 Proposed Tech Specs Modifying Testing Frequencies for Drywell Test & Airlock Tests ML20059B0351993-10-15015 October 1993 Proposed Tech Specs Converting Current GGNS TS to TS Based Largely on NUREG-1434,Rev 0 ML20057C7281993-09-23023 September 1993 Proposed Tech Specs Removing Surveillance Requirement 4.4.1.2.2 Due to Problems Encountered W/Jet Pump Differential Pressure Instrumentation Measurements ML20056E4511993-08-12012 August 1993 Proposed Tech Specs 3/4 6-3,6-4,6-4a,6-6,6-12 Re Exemption to 10CFR50,App J, Primary Reactor Containment..., for Local Leak Rate ML20056D5621993-08-11011 August 1993 Proposed Tech Specs Section 3/4.3.7.5 Reflecting Relocation of Certain Accident Monitoring Instrumentation to Administrative Control ML20046D2081993-08-11011 August 1993 Proposed Tech Specs Section 3/4.3.7.10, Loose Part Detection Sys, Relocating Loose Part Detection Instrumentation from TS to Administrative Control ML20046D1961993-08-11011 August 1993 Proposed Tech Specs Supporting Compliance W/New Requirements of 10CFR20 & 10CFR50.36a ML20056C7141993-07-15015 July 1993 Proposed Tech Specs Removing Operability Requirements for auto-test Feature of Load Shedding & Sequencing Sys & Increase AOT for Inoperable Load Shedding & Sequencing Sys from Eight to Twelve 1999-08-20
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211E7151999-08-20020 August 1999 Proposed Tech Specs,Incorporating Many Generic Improvements Agreed Upon Between Industry & NRC Since GGNS Conversion to ITS ML20196K0831999-06-29029 June 1999 Proposed Tech Specs Page 3.4-3,reflecting Implementation of BWROG Enhanced Option I-A,reactor Stability long-term Solution ML20196G7131999-06-23023 June 1999 Proposed Tech Specs Revising TS Associated with Various Esfss Which Need No Longer Be Credited Following Design Basis Fuel Handling Accident ML20206K5361999-05-0606 May 1999 Proposed Tech Specs Pages,Changing SLMCPR ML20206R9351999-01-12012 January 1999 Proposed Tech Specs Re Refueling Equipment Interlocks Required Actions ML20154Q4511998-10-16016 October 1998 TS Bases Update for Period of 970410 Through 981015 ML20236T1661998-07-20020 July 1998 Proposed Tech Specs 3.2.4,3.3.1.1,3.3.1.3,3.4.1,5.6.5, B 3.2.4,B 3.3.1.1,B 3.3.1.3 & B 3.4.1,enabling Full Implementation of Enhanced Option I-A Long Term Solution to Address Neutronic/Thermal Hydraulic Instability Issue ML20198J3581998-01-0909 January 1998 Proposed Tech Specs,Providing Certain Clarifications to Amend & Adding Restriction to Allowed Interval Extensoions ML20210F6651997-12-22022 December 1997 Redeacted Version of Test Rept M-J5.08-Q1-45161-0-8.0-1-0, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators for Entergy Operations ML20217H6211997-12-15015 December 1997 Rev 21 to Odcm ML20199L5711997-11-26026 November 1997 Rev 8 to Program Plan GGNS-M-189.1, Grand Gulf Nuclear Station Pump & Valve IST Program - Safety Related ML20198N3231997-11-0606 November 1997 Rev 11 to GGNS-M-489.1, Program Plan for ASME Section XI ISI Plan ML20198N3941997-10-28028 October 1997 Proposed Tech Specs Implementing Option B & Ref SE Issued by NRR for Ggns'S App J Exemption as Implementing Document for performance-based Leakage Testing Program ML20211M8481997-10-0606 October 1997 Proposed Tech Specs Replacement Bases Pages Associated W/Proposed Amend to License Re Response Time Testing ML20210V5581997-09-18018 September 1997 Proposed Tech Specs Reflecting Decrease of Two Recirculation Loop SLMCPR Limit to 1.11 & Single Recirculation Loop SLMCPR Limit to 1.12 ML20210H0871997-08-0606 August 1997 Proposed Tech Specs Changing TS 3.8.1, AC Sources Operating. Removal of Accelerated Testing Requirements for Standby DGs as Advised by GL 94-01 ML20141A1681997-05-0707 May 1997 Proposed Tech Specs Re Eliminating Selected Response Time Testing Requirements ML20140E3211997-04-18018 April 1997 Proposed Tech Specs,Revising TS Bases to Include Changes Made Since Rev 1 Was Sent to NRC 960201 ML20134N7841996-11-21021 November 1996 Proposed Tech Specs Pp 5.0-20 & 5.0-21,revised by Adding Footnote Indicating Proposed Change Applicable Only for Cycle 9 ML20134N7611996-11-20020 November 1996 Proposed Tech Specs Re MCPR Limits for Two Recirculation Loop Operation ML20134E1261996-10-22022 October 1996 Proposed Tech Specs Revising TS Figure 3.4.11-1, Minimum Reactor Vessel Metal Temperature Vs Reactor Vessel Procedure, Curves Using Methodology of NRC Reg Guide 1.99, Rev 2, Radiation Embrittlement of Reactor Vessel Matls ML20128M5681996-10-0909 October 1996 Proposed Tech Specs 3.8.1.14 Re Surveillance Requirements ML20117P4461996-09-19019 September 1996 Proposed Tech Specs Re Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20117M7021996-09-0505 September 1996 Proposed Tech Specs Re Min Critical Power Safety Limit ML20117G6781996-08-27027 August 1996 Proposed Tech Specs Re Surveillance Requirements for Safety/Relief Valves ML20116F0211996-07-31031 July 1996 Proposed Tech Specs Required to Support Cycle 9,reload 8 ML20113B7381996-06-20020 June 1996 Proposed Tech Specs,Redefining Secondary Containment Boundary to Allow Encl Bldg to Be Inoperable During Upcoming Refueling Outage ML20117L2581996-06-0404 June 1996 Proposed Tech Specs Re Replacement Page for Ltr RBG-42764, Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks1996-05-31031 May 1996 Proposed Tech Specs 3.9.1 Re Refueling Equipment Interlocks ML20117D6941996-05-0909 May 1996 Proposed Tech Specs Required to Support Unit 1 Cycle 9, Including Changes to SLMCPR & Ref for Analytical Methods Used to Determine Core Operating Limits.Addl Methodology Ref in Various TS Bases Revised to Reflect GE Methodologies ML20117F4661996-05-0909 May 1996 Proposed Tech Specs,Modifying SRV Surveillance Test for Relief Mode of Operation ML20111B2701996-05-0808 May 1996 Proposed Tech Specs,Placing Containment Purge Valves W/ Resilient Seals on Performance Based Leakage Testing Frequency ML20108E3591996-05-0606 May 1996 Proposed Tech Specs Re Change in Co Name from Mississipi Power & Light to Entergy Mississippi,Inc ML20107E4681996-04-18018 April 1996 Proposed Tech Specs Re Fuel Loading W/Control Rods Withdrawn or Removed from Defueled Core Cells ML20100J8391996-02-22022 February 1996 Proposed Tech Specs Re Safety Setpoint Tolerance Requirements for Safety/Relief Valves ML20097C3541996-02-0101 February 1996 Proposed Tech Specs,Revising TS Bases to Include Changes Since 950221 Approval of TS Bases ML20094M8001995-11-20020 November 1995 Proposed Tech Specs Re Drywell Leak Rate Testing Requirements ML20087B5061995-08-0404 August 1995 Proposed Tech Specs Assoc W/Various ESF Sys Following Design Basis Fuel Handling Accident ML20082K3451995-04-13013 April 1995 Proposed Tech Specs Re Change to Be Reduced to Leave in TS Requirement to Test Outboard MSIV LCS Blowers ML20108A2691995-03-10010 March 1995 Rev 17 to ODCM ML20078S5141995-02-14014 February 1995 Proposed TS Consisting of Changes to SR 4.4.1.4.a.1 & 4.6.1.4.a.2 ML20078N6611995-02-10010 February 1995 Proposed Tech Specs Supporting Performance of Drywell Bypass Leakage Rate Surveillance on Performance Based Interval ML20079B4501994-11-0909 November 1994 Proposed Tech Specs Associated W/Various ESF Systems Following Design Basis Fuel Handling Accident ML20070C9751994-06-24024 June 1994 Proposed TS Pages 3/4 6-4 & 3/4 6-6 Associated W/Proposed Exemption to 10CFR50,App J ML20065L4971994-04-15015 April 1994 Proposed Tech Specs Re Administrative Controls ML20059H6101994-01-14014 January 1994 Cycle 7 Startup Physics Test Summary Rept for Physics Testing Completed on 931220 ML20059H6061994-01-13013 January 1994 Proposed Tech Specs,Removing 2,324 Spent Fuel Pool Storage Limit ML20029D6451993-11-30030 November 1993 Reactor Containment Bldg 1993 Integrated Leakage Rate Test. ML20058D3911993-11-23023 November 1993 Proposed Tech Specs Bases Pages Re Cycle 7 Reload ML20059A4871993-10-22022 October 1993 Proposed Tech Specs Modifying Testing Frequencies for Drywell Test & Airlock Tests 1999-08-20
[Table view] |
Text
. - - . .. -- - - - .-
. ~ Attachment to GNRO- 92/00C58
,. Page 1 of 2 1-l l*
9
. d /4.9 REFUELING OPERATIONS j . BASES 3/4,9,1 REACTOR MODE SWITCH
{
i Locking the OPERABLE-reactor mode switch in the Shutdown or Refuel position,
! as specified, ensures t.%t the restrictions on control rod withdrawal and refueling platform movement during the refueling operations are properly activated. These
- conditions reinforce t' e refueling' yocedures and reduce the probability of
- inadvertent criticality, damage to reactor internals or fuel assemblies, and r exposure of personnel to excessive radioactivity.
i 3/4.9.2 INSTRUMENTATIM i Tha OPERABILITV of at least two source range monitors ensures that redundant
- monitoring capability is available to detect changes in the reactivity condition j of the core.
i i
j 3/4.9.3 CONTROL R00 POSITION
! The requirement that all control rods be inserted during other CORE
! ALTERATIONS ensures that fuel will not be loaded into a cell without a control 3 rod.
I
( 3/4.9.4 DECAY TIME
! The minimum requirement for reactor subcriticality prior to fuel movement
- ensures that sufficient time has elapsed to allow the radioactive decay of the short lived fission products. This decay time is consistent with the assump-
! tions used in the accident analyses.
- 3/4.,9.5 COMMUNICATIONS l The requirement for communications capability ensures that refueling station i personnel can be promptly informed of-significant changes in the facility status
! or core reactivity condition during movement of fuel within the reactor pressure 7
vessel.
i-3/4.9.6 REFUELING E0VIPMENT The OPERABILITY-requirements ensure that (1) only the main hoist of the
!. refueling platform or the main hoist of the fuel handling platform will be used 4
for handling fuel assemblies within the reactor pressuru vessel,- (2) platform l hoists have sufficient load capacity for handling fuel assemblies and/or control
. rods, (3) the core internals-and pressure vessel are protected from excessive 3 lifting force in the event they are inadvertently engaged during lifting
! operations, and (4) a-fuel bundle is protected frc~ excessive lifting force j_ in the event it becomes stuck during lifting operh~lons. ;
i-I 9206040270 920529 6 DR ADOCK 0500 GRAND GULF-UNIT I B 3/4 9-1 Amendment No. 88 i
. _ . . . . _ - . - , .m . . _.,-,.._w,___m_-,m.._,_,,,. m.,,,,rm, , , - , - . ,,,_w....,r., ., #m ,_ --,.,m, , m,#
I Attachment to GNRO-92/00058 i Page 2 of 2 .
REFUELING OPERATIONS -
BASES j k 9.7 CRANE TRAVtt - SPENT FUEL AND UPPER CONTAINMENT FVEL STORAGE P0O The restriction on the movement of a nonfuel load defined as a heavy load in NUREG-0612 over fuel assemblies in the storage pools ensures that in the event 4 that this load is dropped (1) that activity release will be bounded by the activity
- release in the safety analyses, and (2) any possible distortion of the fuel in the storage racks will not result in a critical array.
3/4.9.8 and 3/4.9 1 WATER LEVEL - REACTOR VESSEL and WA!ER LEVEL - SPENT FUEL AND UPPER CONTAINNENT FUEL STORAGE PG L l The restrictions on minimum water level ensure that suffich.mt water depth
, is available to remove 99% of the assumed 10% iodine gap activity released from
- the rupture of an irradiated fuel assembly. This minimum water depth is consistent with the assumptions of the accident analysis.
3/4.9.10 CONTROL R00 REMOVAL i These specifications ensure that maintenance or repair of control rods or a
control rod drives will be performed under conditions that limit the probability of inadvertent criticality. The requirements for simultaneous removal of more than one control rod are more stringent since the SHUTDOWN MARGIN specification provides for the core to remain subcritical with only one control rod fully
- withdrawn.
344.9.11 RES10 VAL HEAT REMOVAL AND COOLANT CIRCULATION An OPERABLE residual heat removal (RHR) system shutdown cooling mode train consists of at least one OPERABLE RHR pump and cne OPERABLE RHR heat exchanger train.
i The requirement that at least one residual heat removal loop be OPERABLE and in operation or that an alternate method capable of decay heat removal be demonstrated and that an alternate method of coolant mixing be in operation ensures that (1) sufficient cooling capacity is available to remove decay heat
- and rnintain the water in the reactor pressure vessel below 140'F as required during REFUELING, and (2) sufficient coolant circulation would be available through the reactor core to assure accurate temperature indication and to distribute and prevent stratification of the poison in the event it becomes
- necessary to actuate the standby liquid control system.
- i The requirement to have two shutdown cooling mode loops OPERABLE when there is less than 22 feet 8 inches of water above the reactor vessel flange ensures that a single failure of the operating loop will not result in a complete loss of residual heat removal capability. With the reactor vessel head removed and 22 feet 8 inches of water above the reactor vessel flange, a large heat sink is available for core cooling. ihus, in the event a failure of the op vating RHR loop, adequate time is provided to initiate alternate methods capable of decay
, heat removal or emergency procedures to cool the core.