Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099L451 + (ML20099L451)
- ML20099L454 + (ML20099L454)
- ML20099L456 + (ML20099L456)
- ML20099L460 + (ML20099L460)
- ML20099L461 + (ML20099L461)
- ML20099L462 + (ML20099L462)
- BSEP-84-1557, Suppls Response to Insp Repts 50-324/83-26 & 50-325/83-26 Re Incomplete Revised Fire Protection Sys Drawings & Procedures Due to Unexpected Scope of Project & Vol of outage-related Work.Completion Anticipated by 850315 + (ML20099L464)
- ML20099L467 + (ML20099L467)
- AECM-84-0525, Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety Function + (ML20099L469)
- ML20099L475 + (ML20099L475)
- 05000298/LER-1995-019, :on 951124,CR Emergency Filter Sys (CREFS) Was Inoperable Due to EDG Being Unavailable.Restored CREFS to Operability + (ML20099L478)
- ML20099L479 + (ML20099L479)
- 05000278/LER-1995-007-02, :on 951202,main Turbine Trip Occurred Caused by Full Reactor Scram.Replaced Mechanical Trip Solenoid Valve Terminal Strip That Caused Initial Ground + (ML20099L481)
- B15484, Provides NRC Staff W/Update to Schedule for Performing Baseline Testing of Motor Control Ctr & Rod Control Area Air Conditioning Heat Exchangers,Per GL 89-13 + (ML20099L483)
- ML20099L484 + (ML20099L484)
- ML20099L491 + (ML20099L491)
- ML20099L494 + (ML20099L494)
- ML20099L496 + (ML20099L496)
- ML20099L497 + (ML20099L497)
- ML20099L500 + (ML20099L500)
- ML20099L502 + (ML20099L502)
- PLA-4399, Forwards Change I to Ses Security Training & Qualification Plan. Plan Withheld + (ML20099L506)
- 05000219/LER-1984-023, :on 841023,containment Isolation Valves V-27-1, 2,3 & 4 Did Not Close Upon Loss of Instrument Air.Caused by Inadequate Design Spec of Valves.Valve Air Lines Disconnected.Valves Locked Closed + (ML20099L508)
- U-602531, Forwards Rev 20 of Physical Security Plan for Clinton Power Station,Unit 1. Plan Withheld + (ML20099L509)
- ML20099L517 + (ML20099L517)
- RBG-19-489, Forwards Rev to FSAR Section 3.8.2.7.1.1 Re Initial Structure Acceptance Test of Containment Vessel.Rev Will Be Included in Future Amend + (ML20099L521)
- ML20099L524 + (ML20099L524)
- ML20099L526 + (ML20099L526)
- ML20099L529 + (ML20099L529)
- ML20099L530 + (ML20099L530)
- ML20099L537 + (ML20099L537)
- ML20099L538 + (ML20099L538)
- ML20099L540 + (ML20099L540)
- ML20099L543 + (ML20099L543)
- ML20099L544 + (ML20099L544)
- RBG-19-490, Provides Addl Info to Finalize SER Confirmatory Item 35, Table 1.3 Re Operator Info of Max Expected Errors for Water Level Measurements in Event of Drywell Heatup Normal Ambient Conditions + (ML20099L552)
- ML20099L554 + (ML20099L554)
- ML20099L558 + (ML20099L558)
- 05000247/LER-1984-019, :on 841022,fire Occurred in Insulation of High Pressure Turbine.Caused by Oil Leak Through Insp Cover.Fire Extinguished & Leak Repaired + (ML20099L561)
- ML20099L566 + (ML20099L566)
- ML20099L570 + (ML20099L570)
- ML20099L572 + (ML20099L572)
- ML20099L574 + (ML20099L574)
- ML20099L576 + (ML20099L576)
- ML20099L580 + (ML20099L580)
- ML20099L583 + (ML20099L583)
- ML20099L584 + (ML20099L584)
- ML20099L589 + (ML20099L589)
- ML20099L591 + (ML20099L591)
- ML20099L592 + (ML20099L592)
- ML20099L593 + (ML20099L593)