ML20099L524

From kanterella
Jump to navigation Jump to search
Corrected Page 3/4 3-33 W/Overleaf for Document Completeness to Amends 103 & 102 to Licenses DPR-80 & DPR-82, Respectively.Error Made by Issuing Page W/O Correctly Indicating Change Made in Amends 102 & 101
ML20099L524
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/21/1995
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20099L527 List:
References
NUDOCS 9601020123
Download: ML20099L524 (1)


Text

.

L

(

TABLE 4.3-2 (Continued) i ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION i

g SURVEILLANCE REQUIREMENTS 2-i P

TRIP l

ACTUATING 9

CHANNEL DEVICE MODES FOR l

5 CHANNEL OPERA-OPERA-MASTER SLAVE WHICH j

E CHANNEL CALI-TIONAL TIONAL ACTUATION RELAY RELAY SURVEILLANCE i FUNCTIONAL UNIT CHECK BRATION TEST TEST LOGIC TEST TEST TEST IS REQUIRED j

f

! 3. Containment Isolation i

d a.

Phase "A" Isolation

1) Manual N.A.

N.A.

N.A.

R N.A.

N.A.

N.A.

1, 2, 3, 4

2) Automatic Actuation N.A.

N.A.

N.A.

N.A.

M(1)

M(1)

Q(4) 1, 2, 3, 4 a.

Logic and Actuation j

Relays

3) Safety Injection See Item 1. above for all Safety Injection Surveillance Requirements.

w1 b.

Phase "B" Isolation

1) Manual N.A.

N.A.

N.A.

R N.A.

N.A.

N.A.

1, 2, 3, 4 wO 2)- Automatic Actuation N.A.

N.A.

N.A.

N.A.

M(1)

M(1)

Q 1, 2, 3, 4 Logic and Actuation ce Relays i

E 3.

3) Containment S

R.

Q N.A.

N.A.

N.A.

. N.A.

1, 2, 3, 4 Pressure-High-High

~~

c.

Containment Ventilation Isolation FE

1) Automatic Actuation N.A.

N.A.

N.A.

N.A.

M(1)

M(1)

Q 1, 2, 3, 4

((

Logic and Actuation i

ae Relays E$

2) Deleted Se,i

((

3) Safety Injection See Iteu 1. above for all Safety Injection Surveillance Requirements-c'$$
4) Containment Ventilation oo No I

~ '

Exhaust Radiation-High N

8 2 (RM-44A and 448)

S R

Q N.A.

N.A.

N.A.

N.A.

1, 2, 3, 4 *

}k:f 03 05

'5!

s. r;;

a OE Q.(

~w I

I l

i TABLE 4.3-2 (Continued) i ENGINEERED SAFETY FEATURES ACTUATION SYSTEN INSTRUNENTATION j

e SURVEILLANCE REQUIRENENTS 8;

j g

TRIP ANALOG ACTUATING NODES FOR i

9 CHANNEL OPERA-OPERA-NASTER SLAVE WHICH i

5 CHANNEL CALI-TIONAL TIONAL ACTUATION RELAY RELAY SURVEILLANCE:

i EFUNCTIONALUNIT CHECK BRATION TEST TEST LOGIC TEST TEST TEST IS REQUIRED i

g4. Steam Line Isolation i

i Z

a.

Manual N.A.

N.A.

N.A.

R N.A.

N.A.

N.A.

1, 2, 3 j

b.

Automatic Actuation Logic M.A.

N.A.

N.A.

N.A.

Q 1, 2, 3 i

and Actuation Relays i

c.

Containment Pressure-S R

Q N.A.

N.B.

N.A.

N.A.

1, 2, 3 i

High-High

}

d.

Steam Line Pressure-Low S

R Q

N.A.

N.A.

N.A.

M.A.

1, 2, 3 j

e.

Negative Steam Line S

R Q

N.A.

M.A.

N.A.

N.A.

3(38 Pressure Rate-High w 5. Turbine Trip and Feedrater 4.

Isolation

}

i a.

Automatic Actuation M.A.

M.A.

N.A.

N.A.

  1. D Q

1, 2

)

Logic and Actuation Relays b.

Steam Generator Water S

R Q

N.A.

N.A.

N.A.

N.A.

I, 2 Level-High-High

& E 6. Aux 111ary Feedwater

0 a.

Manual E.A.

N.A.

N.A.

R N.A.

N.A.

N.A.

1, 2, 3 b.

Automatic Actuation M.A.

N.A.

N.A.

N.A.

Q 1, 2, 3

((

Logic and Actuation Relays h

c.

Steam Generator Water gg Level-Low-Low r.

1) Steam Generator S

R Q

N.A.

N.A.

M.A.

N.A.

1, 2, 3

o, Water Level-Low-low

2) RCS Loop AT N.A.

R Q

N.A.

N.A.

N.A.

N.A.

1, 2 mw e

..