ML20099L500

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 84-27 Re Improperly Handled Instrumentation from Waldinger.Due to Extensive Investigation & Evaluation,Final Rept Delayed Until 841127
ML20099L500
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/12/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31095-TDS, DER-84-27, NUDOCS 8412010149
Download: ML20099L500 (2)


Text

1 ,

Arizona Public Service Company agegygg "m

ETI l?0719 flf l: ! I.

November 12, 1984 ANPP-31095-TDS/TRB

' U.; W v ,

U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-27 A 50.55(e) Potentially Reportable Deficiency Relating To Improperly Handled Instrumentation From Waldinger File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on May 10, 1984 (B) ANPP-29648 dated June 4, 1984 (Interim Report)

(C) ANPP-30317, dated August 23, 1984 (Time Extension)

(D) ANPP-30665, dated September 26, 1984 (Time Extension)

(E) ANPP-30953, dated October 25, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B),

and Time Extensions were requested by References (C), (D), and (E).

Al. that time, it was estimated that a Final Report would be available by November 13, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 27, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly our eha s E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two g,

6D pg2gggroggsyg j ess , e tw

Mr. T. W. Bishop DER 84-27 Page Two cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Comniission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Ibwkinson R. P. Zimmerman L. Clyde M. Woods T. J. Bloom Records Ceriter Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339