Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099E353 + (ML20099E353)
- ML20099E355 + (ML20099E355)
- 05000272/LER-1984-021-01, :on 841014,during Reactor Startup,Containment Isolation Valve 1CC131 Closed.Caused by Motor Not Deenergizing Following Opening Attempt,Resulting in Current Draw & Motor Failure.Valve Repaired + (ML20099E366)
- ML20099E367 + (ML20099E367)
- ML20099E375 + (ML20099E375)
- ML20099E376 + (ML20099E376)
- ML20099E380 + (ML20099E380)
- ML20099E387 + (ML20099E387)
- SNRC-1111, Provides Addl Clarification of Response to NRC Queries Re Chapter 13 of Amend 51 to License Application Re Definition of Area in Which Control Room Senior Reactor Operator Will Perform Duties + (ML20099E389)
- ML20099E391 + (ML20099E391)
- ML20099E395 + (ML20099E395)
- ML20099E402 + (ML20099E402)
- ML20099E403 + (ML20099E403)
- ML20099E406 + (ML20099E406)
- 05000339/LER-1984-008-03, :on 841016,complete Loss of RHR Capability Occurred & Both RHR Pumps Unable to Operate Due to Air in RHR Sys.Caused by Isolation Valve Becoming Clogged.Valve Repaired + (ML20099E408)
- B11362, Submits Addl Info & Responses to Environ Protection Comments Re Des (NUREG-1064),per 841017 Request.Operation of Facility Will Not Result in Loss of Any Existing Shoreline Recreational Opportunities to Public + (ML20099E410)
- ML20099E421 + (ML20099E421)
- ML20099E425 + (ML20099E425)
- 05000387/LER-1985-004-01, :on 850129,diesel Generator B Tripped After 8 Minutes of Operation.Caused by Actuation of Connecting Rod Bearing High Temp Detector Vent Valve.Maint Personnel Will Perform Addl Insp + (ML20099E428)
- ML20099E435 + (ML20099E435)
- ML20099E471 + (ML20099E471)
- RBG-19369, Final Deficiency Rept DR-241 Re Unbalance of Silicon Control Rectifier Bridge Currents in Voltage Regulator on Standby Diesel Generator Supplied by Tdi.Initially Reported on 840831.Condition Not Reportable Per 10CFR50.55(e) + (ML20099E473)
- ML20099E474 + (ML20099E474)
- ML20099E475 + (ML20099E475)
- ML20099E476 + (ML20099E476)
- ML20099E477 + (ML20099E477)
- ML20099E485 + (ML20099E485)
- ML20099E491 + (ML20099E491)
- ML20099E492 + (ML20099E492)
- RBG-20254, Final Deficiency Rept DR-239 Re High Drywell Pressure Automatic Isolation Signal Not Provided on RHR Sys Upper Containment Pool Valves.Valves Provided W/Signal Preventing Opening When Reactor Pressure Greater than 135 Psig + (ML20099E495)
- ML20099E496 + (ML20099E496)
- ML20099E508 + (ML20099E508)
- ML20099E511 + (ML20099E511)
- ND-20-0243, Financial Assurance Requirements for Decommissioning + (ML20099E527)
- 05000301/LER-1984-005-01, :on 841022,13.8 Kv Bus Tie Breaker Opened Prior to Shutting Station Auxiliary Transformer Output Breaker, Resulting in Loss of Offsite Power.Caused by Operator Error. Operator Trainees Reinstructed + (ML20099E532)
- ML20099E536 + (ML20099E536)
- ML20099E541 + (ML20099E541)
- ML20099E555 + (ML20099E555)
- ML20099E560 + (ML20099E560)
- ML20099E564 + (ML20099E564)
- ML20099E565 + (ML20099E565)
- ML20099E566 + (ML20099E566)
- ML20099E568 + (ML20099E568)
- ML20099E574 + (ML20099E574)
- ML20099E582 + (ML20099E582)
- 05000413/LER-1992-007-01, :on 920703,discovered That Previous 72 H Leak Rate Test Had Not Been Performed on Air Lock Per Ts.Caused by Lack of Communication.Operations Support Group Trained Re Communications of Turnover Responsibility + (ML20099E589)
- ML20099E596 + (ML20099E596)
- ML20099E608 + (ML20099E608)
- ML20099E609 + (ML20099E609)
- SECY-20-0031, Weekly Information Report - Week Ending April 3, 2020 + (ML20099E611)
- BSEP-84-2468, RO 1-84-17:on 841103-05,testing Revealed Presence of Crack Indications at Four Pipe Welds on Reactor Recirculation Loop 12-inch Riser Piping + (ML20099E612)