ML20099E435

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Wj Woolley Co QA Documentation. S&W Investigation Continuing.Final Rept Will Be Submitted by 850131
ML20099E435
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/31/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(NMP2L-0223), (NMP2L-223), NUDOCS 8411210301
Download: ML20099E435 (2)


Text

g _- -

~

~

3%.

ra *:

g;gfy Nf AGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE N.Y.13202/ TELEPHONE (315) 4741511 -

4

~

October .31,1984
(NMP2L 0223).

Mr. R. W. Starostecki, Director U. S. Nuclear Regulatory Comission

~ Region I Divition of Project and Resident Programs 631 Park Avenue:

King of Prussia, PA 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Niagar Mohawk submitted 50.55(e) interim reports on June 3, 1983 August 12, 1983 and December 20, 1983 for the problem concerning W. J. Woolley Company's quality , assurance documentation. Since then the submittal date of the final draft has been deferred several times. Although we do not presently have all the information necessary t submit a final report, we would like to provide a status of the work completed to date and a description of the open items.

On October 5,1984 Stone & Webster wrote a letter to Woolley Manufacturing Division that provided the following status:

1. The Stone & Webster audit of Woolley Quality Assurance documentation in April,1983 identified 116 unsatisfactory observations.
2. Based on Woolley's efforts from December,1983 through March,1984, the number of unresolved observations was reduced to 38, 3 Woolley provided additional information from April,1984 through August, 1984 which Stone & Webster used to reduce to 16 the number of observations remaining to be closed.

4 Woolley has offered an explanation as to how the remaining discrepancies ,

may have occurred. However, Stone & Webster requires further substantiation of Woolley's explanation to assure the welds involved were

. properly inspected.

8411210301 841031 PDR ADOCK 05000410 s PDR

@.1}'

, , =

. .; . x .

4 R'.W.Starostecklt

Page 2.

Upon ' resolutioh ~ cf item .4_ above, we' will be able' to ' submit .a final report. The final report will-be submitted by January 31, 1985 Very truly yo'Jrs, C. V.-Manga Vice President Nuclear Engineering and Licensing CVM/GG/pbd xc: Director of Inspection and Enforcement U. S.- Nuclear Regulatory Commission

.Washington, DC 20555 R. A. Gramm, NRC Resident Inspector Project-File (2) f

'i J

, . -.. , , . , .n - .- - ,a , . -.-..-r,

.