Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099C522 + (ML20099C522)
- ML20099C524 + (ML20099C524)
- ML20099C526 + (ML20099C526)
- ML20099C537 + (ML20099C537)
- ML20099C544 + (ML20099C544)
- 05000302/LER-1984-019, :on 841010,operability of Cable Tunnel Sump Pump Not Verified.Caused by Operator Not Performing Surveillance Requirement 4.8.1.1.1.a.2 at Least Once Every 8 H.Procedure Mods Will Be Made + (ML20099C547)
- ML20099C553 + (ML20099C553)
- 05000483/LER-1984-053, :on 841017,discovered That Required Grab Sample Not Taken in Preceeding 24 H Period.Caused by Failure to Update Status Board Used to Schedule Grab Samples.Personnel Counseled & Retrained + (ML20099C561)
- ML20099C573 + (ML20099C573)
- 05000296/LER-1984-010-04, :on 841010,during Surveillance Test on Diesel Generators,Electrician Accidently Bumped Logic Relay in Testing Relay Panel & Two Diesel Generators Received Start Signals.Personnel Counseled + (ML20099C583)
- 05000251/LER-1984-022-01, :on 841009,during Heat Up from Cold to Hot Shutdown,Reactor Trip Occurred.Caused by Blown Fuse Supplying Instrument Power to Panel 4P07,which Caused Instrumentation Bistables to Deenergize + (ML20099C591)
- ML20099C598 + (ML20099C598)
- ML20099C599 + (ML20099C599)
- ML20099C614 + (ML20099C614)
- ML20099C617 + (ML20099C617)
- ML20099C626 + (ML20099C626)
- SNRC-1098, Submits Evaluation & Proposed Mods to Containment Inerting Sys in Response to IE Info Notice 84-17 & GE Svc Info Ltr SIL-402 Re Wetwall/Drywell Inerting Nitrogen Cooling Components + (ML20099C634)
- ML20099C636 + (ML20099C636)
- ML20099C637 + (ML20099C637)
- ML20099C639 + (ML20099C639)
- A04533, Forwards Response to SER Open Item 3 Re Protection Against Postulated High Energy Line Breaks Outside Containment. Subgroup Formed to Address Impact of Superheated Steam Blowdowns from High Energy Line Breaks Outside Containment + (ML20099C649)
- ML20099C650 + (ML20099C650)
- ML20099C651 + (ML20099C651)
- JAFP-84-1040, Monthly Operating Rept for Oct 1984 + (ML20099C654)
- ML20099C659 + (ML20099C659)
- ML20099C662 + (ML20099C662)
- ML20099C664 + (ML20099C664)
- ML20099C679 + (ML20099C679)
- 05000382/LER-2019-005-01, Automatic Reactor Scram Due to Steam Generator 1 High Level Resulting from a Main Turbine Trip and Subsequent Reactor Power Cutback Due to Failed Diode Modules with the Main Exciter + (ML20099C680)
- ML20099C683 + (ML20099C683)
- ML20099C689 + (ML20099C689)
- ML20099C694 + (ML20099C694)
- ML20099C697 + (ML20099C697)
- ML20099C698 + (ML20099C698)
- ML20099C700 + (ML20099C700)
- ML20099C702 + (ML20099C702)
- ML20099C703 + (ML20099C703)
- ML20099C706 + (ML20099C706)
- 05000327/LER-1984-066, :on 841009,breaker Manually Opened W/O Supplying Alternate Power to Loads,Resulting in Loss of Control Power to Diesel Generator 2A-A Emergency Start Relay.Caused by Personnel Error.Breaker Closed + (ML20099C713)
- ML20099C715 + (ML20099C715)
- ML20099C725 + (ML20099C725)
- B11471, Submits Partial Response to SER Open Item 10 Re Structural Capability of Refueling Cavity Wall.Fsar Table 6.2-43 Encl Showing That Refueling Cavity Wall Designed to Withstand Uniform Pressure of 11.6 Psid + (ML20099C730)
- AECM-84-0460, RO 84-035/0:on 840912,during Routine Calibr Check of Portable instrument,152 Uci Calibr Source Found Leaking. Caused by Breached Mylar Coating on Sealed Calibr Source. Source Disposed of as Radwaste & Lockers Inspected + (ML20099C735)
- ML20099C742 + (ML20099C742)
- RBG-20-312, Submits Revised Response to Item 9 of SER Table 1.3,changing Info Provided in Je Booker .Revised FSAR Table 1.5-12 Re Indication of Bypass/Inoperability Due to Auxiliary/Support Sys,Encl + (ML20099C744)
- ML20099C746 + (ML20099C746)
- ML20099C747 + (ML20099C747)
- ML20099C754 + (ML20099C754)
- ML20099C758 + (ML20099C758)
- 1CAN028510, Forwards Response to 840423 Request for Addl Info Re Generic Ltr 81-21 Concerning Natural Circulation Cooldown Analysis.Natural Circulation Cooldown Procedure Will Be Revised to Reflect Cooldown Method Modeled in Analysis + (ML20099C759)
- ML20099C762 + (ML20099C762)