Notice of Environ Assessment & Finding of No Significant Impact Re 840904 & 1022 Requests for Exemption from 10CFR50, App J,Section D,Part 2 Permitting one-time Extension of Local Leak Rate Test Interval
ML20099C662
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 10/26/1984
From: Lainas G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20099C665 List:
References
NUDOCS 8411200015
Download: ML20099C662 (3)


Text

.

O 7590-01 UNITED STATES MUCLEAR REGULATORY COMMISSION CAROLINA p0WER & LIGHT COMPANY BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 DOCKET NO. 50-325 NOTICE OF ENVIRONMENTAL ASSESSMENT AND FINDING 0F NO SIGNIFICANT IMPACT The U. S. Nuclear Regulatory Commission (the Commission) is considering issuance of an exemption from the requirements of 10 CFR 50.55a(g)(6)(i) to the Carolina Power & Light Company (CP&L, the licensee),

for the Brunswick Steam Electric Plant, Unit 1, located in Brunswick County, North Carolina.

ENVIRONMENTAL ASSESSMENT Identification of proposed Action:

The exemption would extend the dates for completion of the local leak rate tests required by 10 CFR 50, Appendix J from December 1984 until March 1985 at which time the facility will shut down for an extended refueling outage.

During a short outage in November 1984 which is primarily for recirculation pipe inspection about one-half of the tests will be completed. Thus, the tests to be postponed are approximately one-half of thnse required.

The exemption would be responsive to the licensee's application for an extension dated September 4, 1984 as supplemented October 22, 1984 The Need for the Proposed Action:

The exemption is needed because the licensee does not expect to complete all of the tests before resuming operation of the plant.

To meet the schedular requirements set forth by 10 CFR 50, Appendix J, all of these 8411200015 841026 PDR ADOCK 05000325 P

PDR

f

_2_

would have to be completed during the November 1984 plant outage.

This would require that the facility remain shutdown throughout the peak winter power demand period.

Environmental Impacts of the Proposed Action:

Postponement of approximately one-half of the local leak rate tests until March 1985 outage should not have any adverse effects since the systems involved are subject to frequent observation by the operators during their rounds.

Leakage from pipes, valves and other components would be noticed and corrected promptly. Therefore, the Connission concludes that there would be no significant radiological environmental impacts associated with this proposed exemption.

With regard to potential non-radiological impacts, the proposed exemption involves features located entirely within the restricted area as defined in 10 CFR Part 20.

It would not affect non-radiological plant effluents and would have no other environmental impact.

Therefore, the Commission concludes that there would be no significant non-radiological environmental impacts associated with the proposed exemption.

Alternative Use of Resources:

This action would involve no use of resources not previously considered in the Final Environmental Stateinent (operating license) for tne Brunswick Steam Electric Plant, Unit 1.

Agencies and Persons Consulted:

The NRC staff reviewed the licensee's request and did not consult other agencies or persons.

q FINDING OF NO SIGNIFICANT IMPACT The Commission has determined not to' prepare an environmental impact statement for the proposed exemption.

Based upon the foregoing environmental assessment, we conclude that the proposed action will not have a significant effect on the.ouality of the human environment.

For further details with respect to this action, see the application for exemption dated September 4,1984, as supplemented October 22, 1984, which is available for public inspection at the Commission's Public Document-Room, 1717 H Street, N. W., Washington, D. C., and at the Southport -

Brunswick County Library,104.W. Moore Street, Southport, North Carolina 28461.

Dated at Bethesda, Maryland, this 26th day of October,1984.

FOR THE NUCLEAR REGULATORY COMMISSION

. (*;.

,() w'

/Gus C. Lainas, Assistant Director for Operating Reactors

/

Division of Licensing