Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20098B338 + (ML20098B338)
- ML20098B341 + (ML20098B341)
- ML20098B346 + (ML20098B346)
- ML20098B362 + (ML20098B362)
- ML20098B370 + (ML20098B370)
- ML20098B372 + (ML20098B372)
- ML20098B381 + (ML20098B381)
- 05000368/LER-1995-002-04, :on 950901,Unit 2 Experienced Automatic RT on B SG High Level as Resust of Human Error Involving Use of Improper Work Surface by Contract Painter.Caused by Human Error.Mgt Suspended All Plant Painting + (ML20098B385)
- NRC-95-0102, Forwards Rev 7a to Fermi 2 Ufsar. Rev 7a Incorporate Changes to QA Program as Result of NRC Approval of TS Amend 104,including Revised Pages to Retract Refs to Plant Mod Not Yet Implemented & Page Inadvertently Omitted from Rev 7 + (ML20098B387)
- AECM-84-0431, Requests Concurrence in Proposed Mod to Util Commitment Not to Place RHR Sys in Steam Condensing Mode to Permit Operation of RHR Div 1 to Facilitate Startup Testing.Request to Delay Div 2 RHR Testing Encl + (ML20098B391)
- 05000316/LER-1984-022, :on 840405,Cardox Fire Protection Sys on Cable Tunnel Discovered Isolated W/No Firewatch Present,Contrary to Tech Specs.Caused by Personnel Error.Administrative Changes Made to Avoid Future Errors + (ML20098B395)
- ML20098B399 + (ML20098B399)
- NRC-95-4568, Forwards Proprietary Rev 1 to WCAP-14112, ADS Test Spec. Encl Withheld Per 10CFR2.790 + (ML20098B400)
- ML20098B403 + (ML20098B403)
- ML20098B409 + (ML20098B409)
- ML20098B414 + (ML20098B414)
- ML20098B421 + (ML20098B421)
- ML20098B422 + (ML20098B422)
- ML20098B458 + (ML20098B458)
- ML20098B467 + (ML20098B467)
- ML20098B469 + (ML20098B469)
- ML20098B486 + (ML20098B486)
- ML20098B538 + (ML20098B538)
- ML20098B542 + (ML20098B542)
- 0CAN099503, Forwards Amend 13 to ANO Unit 1 USAR & Rev 3 to ANO Units 1 & 2 Fire Hazards Analysis + (ML20098B553)
- ML20098B554 + (ML20098B554)
- ML20098B571 + (ML20098B571)
- ML20098B580 + (ML20098B580)
- ML20098B581 + (ML20098B581)
- ML20098B599 + (ML20098B599)
- PY-CEI-NRR-1986, Forwards LERs 95-005,95-006 & 95-007 Re Inverter Failure Results in Reactor Scram,Esf Actuation During Inverter Restoration & Improper Feedwater Pump Transfer Results in Reactor Scram + (ML20098B601)
- ML20098B602 + (ML20098B602)
- 05000440/LER-1995-005, :on 950831,reactor Automatically Scramed.Caused by Equipment Failure.Inverter Unit Replaced & Instrument Power Supply Restored + (ML20098B606)
- 05000440/LER-1995-006, :on 950901,ESF Actuation During Inverter Restoration Occurred.Caused by Personnel Error.Engineers Involved in Technical Review of Work Order Coached & Counseled by Mgt/Supervision + (ML20098B611)
- ML20098B612 + (ML20098B612)
- 05000440/LER-1995-007, :on 950902,reactor Automatically Scramed.Caused by Operator Error.Operators Involved in Event Removed from Licensed Duties & Counseled W/Respect to Improper Actions + (ML20098B616)
- ML20098B619 + (ML20098B619)
- ML20098B649 + (ML20098B649)
- ML20098B674 + (ML20098B674)
- ML20098B677 + (ML20098B677)
- 05000374/LER-1984-053, :on 840816,hydrogen Sample on Offgas Sample Missed During Unit Startup.Caused by Communication Problem. Need for Better Communication Emphasized + (ML20098B681)
- ML20098B684 + (ML20098B684)
- ML20098B688 + (ML20098B688)
- ML20098B700 + (ML20098B700)
- 05000352/LER-1995-007, Forwards LER 95-007,discussing Condition Prohibited by TS Due to Personnel Error + (ML20098B721)
- 05000352/LER-1995-007-01, :on 950902,TS Condition in Unit 1 a & B & Unit 2 B H Recombiners Inoperable Due to Inadequate post-mod Test Caused by Personnel Error.Conducted All Hands Meeting & Maint Training Analysis + (ML20098B723)
- ML20098B729 + (ML20098B729)
- ML20098B732 + (ML20098B732)
- ML20098B741 + (ML20098B741)
- AECM-84-0469, Forwards Monthly Operating Rept for Aug 1984 & Rev 4 to Offsite Dose Calculation Manual + (ML20098B757)
- ML20098B761 + (ML20098B761)