, _ _

OPERATING DATA REPIRT DOCKET No. 50 - 277

...._= =_=

DATE SEPTEMBER 14, 1984 COMPLETED BY PHILADELPHIA ELECTBIC COBPANY 9.5.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLE 15 TELEPHONE (215) 841-5022 OPLEATING STATUS

._==

1. UNIT NAEE: PLACH BOTT0n UNIT 2 l NOTES: UNIT 2 CONTINUED ITS l

g i

2. h1 PORTING PLEIOD:

AUGUST, 1984 l

SCHEDULED SHUIDOWN FOR l

3. LICENSLD THEREAL POWLR (HWT) :

3293 l

ITS SIITH REFUELING AND l

=-

g g

4. NAMEPLATE BATING (GROSS RWE) :

1152 l

BAINTENANCE OUTAGE.

l g

5. DLSIGN ELECTRICAL EATING PET MWE):

1065 l

1 l

I

6. BAIIBUB 94PENTABLE CAPACITY (GROFS BEE) : 1098 I

I g

g

+

7. MAXIMUM DEPENDABLE CAPACITY (NET BWE) :

1051 i

i

6. IF CHANGEt OCCUB IN CAPACITY RJTINGS (ITEBS MUEBER 3 THBOUGH 7) SINCE LAST BEPORT, GIVE ELASONS:
9. IOWLE LEVEL TO WHICH BESTRICT',D, IF ANY (NET BWE) :
10. RLASONS FOR BESTEICTIONS, IF A?Y:

8409260174 840831 PDR ADOCK 05000277 R

PDR THIS BONTH YB-TO-DATE CU RUL ATIVE

11. HOUFS IN REPORTING PEBIOD 744 5,855 89,063 12.'NUEbER OF EOURS EEACTOR BAS CBITIC4L 0

2,584.7 62,283.6

13. h1AC10E RLSERVE SHUTDOWN HOURS 0.0 0.0 0.0

=

14 HOUES GINLEATOh ON-LINE 0.0 2,544.8 60,556.6

15. UNIT ELSLRVE SRUTDOWN HOURS 0.0 0.0 0.0

=-.___..

16. GEOSS TELRE AL ENERGY GENERATED (MWH) 0 1,865,391 178,420,001
17. GROSS ELECTRICAL ENLEGY GENERATEu (BWH) 0 2,547,570 58,718,660

.13. EE2 ELECTEICAL ENEEGY CENERATED 018H)

-5,923 2,442,181 56,278,611

19. UNIT EEEVICE FACTOR 0.0 43.5 66.0
20. UNIT AV AILAEILITY FACTOR 0.0 43.5 66.0
71. UNIT CAPACITY FACTOR (USING RDC NET) 0.0 39.7 60.1
22. UNIT CAPACITY FACTOR (USING DEh MET) 0.0.

30.2 59.3

23. UNIT FORCED OUTAGE BATE 0.0 4.4 12.5 24 SHUTDonNS SCHEDULED OVER NEXT 6 803T85 (TYPE, DATE, AND DUR ATION OF LACH) :

LCEEDULED SHUTDOWN FOR REFUELING AND MAINTENANCE, STARTED 4/27/84

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIBATED DATE OF STARTUP: 12/31/84
23. UNITS IN TEST STATUS (PRIOR TO CORELECI AL OPER ATION) :

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMBERCI AL OPER ATION o..~CpFr6611G YALUL.BLPORTED POR CONSISTENCY WITH FEDERAL ENERGY REGULATORY COBBISSION REPORTS.

mer OPEk& TING DATA REPORT DICKET NO. 50 - 278 DATE SEPTEBBER 14, 19884 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY

.. =

.==-

N.B.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DITISION-NUCLEAR TELEPHONE (215) 841-5022

'OPEkATING STATUS

1. UNIT NAEE: PEACH BOTTon UNIT 3 l NOTES: UNIT 3 EXPERIEN CED l

l

2. REPORTING PERIOD:

AUGUST, 1984 i

DNE FORCED OUTAGE l

g

3. LICENSED THERRAL PONER (RNT) :

3293 l

l

==.

l l

4. NAMEP' 3TE R ATING (GEOSS nNE) :

1152 l

l g

g 5.-DE31GN ELECTRICAL RATING (NET BNE) :

1065 l

l g

6. B11150R DEPENDABLE CAPACITY (GROSS ENE) : 1098 l

1 l

l

7. BAIIRUE DEPENDABLE CAPACITY (NRT ENE):

1035 l

l

6. IF CHANGES OCCUR IN CAPACITY RATINGS (ITE55 NUnbEl 3 THROUGH 7) SINCE LAST R POET, GITE REASONS:
9. PONER LEYEL To unICH RESTRICTED, IF ANY (NET ENE) :

. 10. REASONS FOR RESTRICTIONS IF 13Y:

THIS BONTH Y R-TO-D AT E CUBULATIVE

11. BOURS IN REPORTING PERIOD 744 5,855 84,959
11. NUMBER OF HOURS REACTOR NAS CRITICAL 696.8 4,964.8 61,764.6

..__.--- =--

13. REACTOR RESERVE SHUTDONN BOURS 0.0 0.0 0.0
14. HOURS. GENERATOR ON-LINE 684.3 4,894.4 60,210.6
15. UNIT RESERVE SHUTDONN HOURS 0.0 0.0 0.0

_=

16. GROSE THERMAL ENERGY GENERATED (BNH) 2,176,104 15,542,487 176,580,792
17. GROSS ELECTRICAL ENERGY GENERATED (ENH) 721,700 5,174,020 5*t,989,140

=

16. NET' ELECTRICAL ENERGY GENERATED @NH) 696,707 5,008,311 55,672,096
19. UNIT SERTICE FACTOR 92.0 83.6 73.9
20. UNIT ATAILABILITY PACTOR 92.0 83.6 70.9
21. UNIT CAPACITY FACTOR (USINO EDC NET) 90.5 82.6 63.3
22. DNIT CAPACITY FACTOR (USING DER NET) 87.9 80.3

.41.5

23. UNIT FORCED OUTAGE RATE 8.0 13.2 7.8 24 SHUTDONNS SCHEDULED OVER NEIT 6 BONTES (TYPE, DATE, AND DURATION OF RACH) :
25. IF SHUTDONN AT END OF REPORT PERIOD, ESTIBATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COBRERCI AL CPERATION) :

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY s

CORBERCIAL OPERATION

. l UNIT SHUTDONNS AND PONER REDUCTIONS DOCKET NO. 50 - 277 UNIT EARE PEACH BOTTOR UNIT 2 DATE SEPTEBBER 14, 1984 REPORT BONTH AUGUST, 1984 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY N.M.ALDEN ENGINEER-IN-CHARGE LICEN3ING SECTIOll GENER ATION DITISION-NUCLEAR TELEPHONE (215) 841-5022 1

I I

l l METHOD OF l LICENSEE ISYSTEslCOMPONENTI CAUSE AND CORRECTIVE I

lTYPElDURATIONlREASONl SHUTTING DONNI EVENT l CODE I CODE l ACTION TO NS.1 D AT E I (1) l (HOURS)l (2) l REACTOR (3) l REPORT e I (4) l (5) l PRETENT RECURRENCE I

I I

I I

I I

l 1

5 1 800801 i S I 744.0 l

C l 1

i NA I RC 1 FUELII 1 SHUTDONN FOR ITS SIITH REFUELING OUTAGE.

1 I

l l

I I

l I

I I

I l 744.0 t

l l

l l

I v

(1)

(2)

(3)

(4) u F - FORCED REASON METHOD EIMIBIT G - INSTRUCTIONS S - SCHECULED A - EQUIPRLNT FAILUBE (EIPLAIN) 1 - MANUAL Yb' PREPARATION OF DATA B - MAINTERANCE OR TEST 2 - MANUAL SCRPM.

ENTHY SHEETS FOR LICENSEE sa C - CEFUELING 3 - AUTOMATIC SCR AM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (LIPLAIN)

FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EIARINATION

'e F - ADMINISTR ATIVE (5)

G - OPEk& TION AL ERROR (EIl LAIN)

H - OTHER(EIPLAIN)

EIHIBIT I - SARE SOURCE v

e w

W w

e e.m

.-e4

UNIT 3RUTDONES AND PONER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE SEPTERBER 14, 1984 REPORT 50 NTH AUGUST, 1984 COMPLETED BY PHILADELPRIA ELECTRIC COMPANY W.R.ALDEN ENGINEER-IN-CEARGE LICENSING SECTION GENERATION DITISION-NUCLEAR TELEPHONE (215) 841-5022 l

l l

l l NETHOD OF l LICENSEE lSYSTEMf CORPONENTI CAUSE AND CORRECTIVE I

ITYPEl DURATION 11EASONl SHUTTING DOWNl EYENT l CODE l CODE l ACTION TO N3.l DATE l (1) l (HOURS) l (2) l RE ACTOR - (3) l REPORT # I (4) I (5) l PREYENT RECURRENCE I

I i

l l

l l

t 1

7l 840821 l Fl 59.70 l A l 3

Ma l CH l INSTRL l 105 REACTOR MATER LEVEL CAUSED BY BALFUNCTION l

l l

l l

l l

l IN FEEDWATER CONTROL CIRCUIT I

l I --

l l

1 1

I l

l l

l 59.7 l

l l

l l

l (1)

(2)

(3)

(4)

F - FORCED REASON HETHOD EIMIBIT G - INSTRUCTIONS S - SC HED U LED

& - BQUIPRENT FAILUBE (EIPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - M ANU AL SCRAM.

ENTRY SMEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCR AM.

EYENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EIPL AIN)

FILE (NU BEG-0161)

E - OPERATOR TRAINING + LICENSE EIARINATION P - ADRINISTRATIVE (5)

G - OPERATIONAL ERROR (EIPLAIN)

$ - OTutR(EIPLAIN)

EIHIBIT I - SABE SOURCE t

_ _......~._ _.._ _ ___

y y.

- AYERAGE DAILY UNIT POWER LEVEL

' \\

T

\\

DOCKET NO. 50 --277 UNIT PEACH BOTT05 UNIT 2 D ATE SEPTEMBER 14, 1984 COMPANY PHILADELPHIA ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH AUGUST 1984 AVERAGE DAILY POWER LEVEL DAY AVERAGE Dh1LY POWER LEYEL (MWE-NET)

DAY (BW E-NET) 0 17 0

1 0

18 0

2 0

19 0

3 0

20 0

4 0

21 0

.5 0

22 0

6 0

23 0

7 0

24 0

8 0

25 0

9 0

26 0

10 0

27 0

11 0

28 0

12 0

29 0

13 0

30 0

14 0

31 0

15 0

16

_ - -. -. ~ _,

... L -

- ~

AYERAGE DAILY UNIT PBRER LEVEL DOCKET No. 50 - 278 UNIT PEACH BOTTOM UNIT 3 1984 DATZ SEPTEMBER 14,_____________________________

COMPANY PHILADELPHIA ELECTRIC COBPAN i

W.B.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 HON TH AUGU ST 1984 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

DAY (MWE-NET) 1052 17 1062 1

1048 18 1064 2

1033 19 1061 3

1054 20 1059 4

615 21 1056 5

0 22 1056 6

0 23 1056 7

643 3

24 1045 8

939 25 1045 9

698 26 1045 10 932 27 1044 11 1039 28 1046 12 1064 j

29 1043 13 1051 30 1046 14 1059 31 1047 15 1051 16 i

Dock 3t No. 50-277

_, ~

Attcchment to Monthly Operating L

[

Report for_ August, 1984 i

i REFUELING INFORMATION p

1.

Name of facility:

Peach Bottom Unit 2 Scheduled date for next-refueling shutdown:

2.

April 27, 1984 3.

Scheduled date for restart following refueling:

December' 31, 1984 4.

Will-refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

Yes

'If answer is yes, what, in general, will these be?

Technical Specifications to accommodate reload fuel, Modifications to reactor core operating limitn.

Technical specification changes associated with anubber reduction program.

5.

Scheduled date (s) for submitting proposed licensing action and supporting information:

Reload 6 licence amendment application s'tbmitted September 7, 1984.

Snubber license amendment is scheduled to be submitted September 17, 1984.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating' procedures:

None expected.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pools (a)' Core - 764 Fuel Assemblies (b)

Fuel Pool - ll70. Fuel Assemblies, 58 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested'or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.

I 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

September, 1990 (March, 1986, with reserve full core discharge)

r-

.i Dockat No. 50-278

t.

. r.

Attachm3nt to Monthly Oparating R3 port for August, 1984 REFUELING INFORMATION 1.

Nametof facility:

Peach Bottom Unit 3 2.- Scheduled date for next refueling shutdown:

March 30, 1985.

3.

Scheduled dateDfor restart following refueling:

-September. 21, 1985.

4.. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

'Yes.

If; answer is yes, what, in general, will these be?

Technical Specifications to 'ccommodate reload fuel.

Modifications to reactor core crerating. limits.

Technical specification changes associated with snubber reduction p+

program.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

LJune 21, 1985 for reload fuel 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis-methods, significant changes in fuel design, new operating procedures:

None expected.

7.

The number of fuel assemblies (a) 1Ln the core and (b) in the spent

[

fuel-storage-pool:

[

(a)

Core - 764 Fuel Assemblies (b)- Fuel Pool - 1212 Fuel Assemblies, 6 Puel Rods i;

8.

The present licensed spent fuel pool storage capacity and the size oof any increase in licensed storage capacity that has been j

requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been' relicensed for l

2816-fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

September, 1991 (March, 1987, with reserve for full core discharge) i

r

~*

Docket Nos. 50-277/50-278 Attcchm3nt to Monthly-Operating Report for August, 1984 Peach Bottom Atomic Power Station Narrative Summary of Operating Experienu.s August, 1984 UNIT 2 Unit 2's Refueling / Pipe Replacement Outage continued throughout

-the month of August.

On August 3, after completion of the cutting and capping of the recirculation and RHR piping, the

- reactor vessel was flooded to the head flange and chemical decontamination of the piping started.

The jet pump plugs were removed and jet pump beams were replaced.

On August 17, the rec.irculation and RHR piping _was drained following completion of chemical-decontamination.

The jet pump plugs were replaced and the vessel was floooed on August 26.

Critical path outage work 1

currently being performed is the cutting and removal of the RHR &

' recirculation piping.

All four diesel generators were individually removed from service for annual-inspection and maintenance and were operable at the end of the month.

UNIT 3 The unit began the month of August at full power.

On August 21, at 2:01 p.m., Unit 3 automatically scrammed due to a feedwater controller failure which'resulted in a low reactor water level.

i i

-Reactor: startup was delayed pend ng complet on of the work required to return an emergency diesel generctor to service.

The diesel ~ generator had been out-of-service for a scheduled annual inspection.

Unit startup was initiated August 24.

During this j

startup, the mid-cycle rod exchange was accomplished to provide unifcrm fuel burnup.

The unit ran at full power for the remainder of the month.

On August 28, load was reduced approximately 100 MWe following a condensate demineralizer resin injection into the reactor vessel after a condensate demineralizer was returned to service on the same day.

l' SLZ c.

e-.

e-

-g,-

-w,

,~,,-.,-,.,,,.._,-%--*-m,~,wr

-,ryy y-3%.-._,-.,.-cw.,v,--.m--

,,7-,

.ym.w.y.%-,,

,%y,,ww,w,,,-,w-,w---ry.----n,r-,

.m--

c PHILADELPHIA ELECTRIC COMPANY 23ol M/.RXET STREET P.O. BOX 8699 PHILADELPHIA. PA.191o1 (215 841-4000 September 14, 1984 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Atterition:

Document Control Desk

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Repcrt Gentl'emen:

Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of August, 1984 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.

Very truly yours,

/W W. T. Ullrich Superintendent Nuclear Generation Division Attachment cc:

Dr..T. E. Murley, NRC Mr. A. R. Blough, NRC Site Inspector Mr. Stan P. Mangi, Dept. of Envir. Resources Mr. P. A. Ross, NRC INPO Records Center dY

- -.-