Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092G077 + (ML20092G077)
- ML20092G078 + (ML20092G078)
- ML20092G079 + (ML20092G079)
- ML20092G081 + (ML20092G081)
- RBG-41936, Interim Special Rept:On 950816,EDG Failed to Start During Monthly Operability Surveillance Due to Failure of Div II Starting Air Block & Vent Valve.Forward Block & Vent Valve Replaced & Surveillance Test Successfully Completed + (ML20092G083)
- ULNRC-03266, Monthly Operating Rept for Aug 1995 for Callaway Plant Unit 1 + (ML20092G087)
- ML20092G088 + (ML20092G088)
- ML20092G093 + (ML20092G093)
- ML20092G099 + (ML20092G099)
- 05000254/LER-1995-005-08, :on 950812,B CR HVAC Sys Was Inoperable Due to Refrigerant Leak That Prevented Operation of Compressor. Fixed Damaged Joint & Inspected Remaining Joints + (ML20092G103)
- 05000271/LER-1992-002, :on 920115,discovered That Boron Concentration Check of Standby Liquid Control Tank Not Performed within TS Time Limits.Caused by Error in Surveillance Schedule. Surveillance Schedule Reviewed + (ML20092G106)
- ML20092G107 + (ML20092G107)
- RBG-36487, Responds to Deviations Noted in Insp Rept 50-458/91-28 on 911118-22.Corrective Actions:Rev 5 to EDP-EQ-01, Training, Quality & Documentation Requirements for Procurement Documents Drafted to Provide More Specific Directions + (ML20092G109)
- ML20092G113 + (ML20092G113)
- 05000395/LER-1995-004, :on 950813,surveillance Was Missed Due to Personnel Error.Completed Permanent Change to STP + (ML20092G114)
- ML20092G115 + (ML20092G115)
- 0CAN029202, Forwards Inservice Testing Program Relief Requests 33 & PR-6 to Enable Use of Multiple Sets of Ref Values in Form of Curve for Monitoring Pump Hydraulic Performance,Per Insp Repts 50-313/91-30 & 50-368/91-30 + (ML20092G117)
- ML20092G121 + (ML20092G121)
- ML20092G179 + (ML20092G179)
- ML20092G197 + (ML20092G197)
- ML20092G213 + (ML20092G213)
- 05000265/LER-1995-001, Informs of Commitments Being Made by Ltr Re Suppl Info Concerning LER 95-001 + (ML20092G214)
- ST-HL-AE-5165, Forwards Request for Deviation from Commitment to 10CFR50, App R,Section III.G.2.c for Lack of Suppression in Fire Area 7 & Rev 0 of Thermo-Lag Assessment Rept for Hl&P STP Electric Generating Station + (ML20092G229)
- ML20092G244 + (ML20092G244)
- ML20092G246 + (ML20092G246)
- ML20092G253 + (ML20092G253)
- HL-5028, Monthly Operating Repts for Aug 1995 for Ei Hatch Nuclear Plant + (ML20092G254)
- JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant + (ML20092G258)
- ML20092G260 + (ML20092G260)
- ELV-03439, Forwards 10CFR50.46 Annual ECCS Model Changes Rept,Info Re Effect of ECCS Evaluation Model Errors/Changes on Current Unit 2 Analysis of Peak Cladding Temp Results & Plant Change Safety Evaluations + (ML20092G262)
- 3F0995-04, Monthly Operating Rept for Aug 1995 for Crystal River Unit 3 + (ML20092G269)
- BVY-95-101, Forwards Vermont Yankee Nuclear Power Station Cycle 18 COLR, Rev 2 + (ML20092G270)
- ML20092G278 + (ML20092G278)
- 05000254/LER-1984-009-04, :on 840519,while Performing Instrument Scram Response Test,Unplanned Reactor Scram Occurred.Caused by Workers Bumping IRM Signal Cable Under Reactor Vessel. Mechanical Maint Will Exercise Caution + (ML20092G279)
- ML20092G282 + (ML20092G282)
- ML20092G290 + (ML20092G290)
- ML20092G296 + (ML20092G296)
- ML20092G298 + (ML20092G298)
- ML20092G305 + (ML20092G305)
- RA-20-0057, Oconee Station, Shearon Harris Station, H. B. Robinson Station and Crystal River Station - Onsite Property Insurance Coverage + (ML20092G306)
- ML20092G307 + (ML20092G307)
- ML20092G313 + (ML20092G313)
- 2CAN099501, Monthly Operating Rept for Aug 1995 for ANO Unit 2 + (ML20092G319)
- 1CAN099501, Monthly Operating Rept for Aug 1995 for ANO Unit 1 + (ML20092G321)
- ML20092G323 + (ML20092G323)
- BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station + (ML20092G329)
- RA-20-0058, McGuire Nuclear Station, Oconee Nuclear Station, Sheraron Harris Nuclear Station and H. B. Robinson Steam Electric Station - 10 CFR 140.21 Guarantees of Payment of Deferred Premiums + (ML20092G330)
- ML20092G331 + (ML20092G331)
- ML20092G332 + (ML20092G332)
- RBG-41965, Monthly Operating Rept for Aug 1995 for River Bend Station + (ML20092G334)
- ML20092G336 + (ML20092G336)