Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BECO-91-121, Forwards 1992 Environ Monitoring,Thermal Discharge Fish Surveillance & Dissolved Nitrogen Saturation Reduction Program & Plans for Approval + (ML20086P452)
- ML20086P455 + (ML20086P455)
- ML20086P463 + (ML20086P463)
- PLA-2062, Final Deficiency Rept Re Bechtel Failure to Accomplish Design Verification of safety-related Power & Control Cables.Caused by Failure to Complete Required Cable Length Verification.Deficiency Not Reportable Per 10CFR50.55(e) + (ML20086P469)
- NRC-95-4514, Provides Results of AP600 LBLOCA Calculations Using Wcobra/Trac Computer Code + (ML20086P472)
- ML20086P475 + (ML20086P475)
- ML20086P477 + (ML20086P477)
- ML20086P480 + (ML20086P480)
- LIC-95-0145, Forwards Fort Calhoun Station Performance Indicators, for June 1995 + (ML20086P481)
- ML20086P484 + (ML20086P484)
- 05000413/LER-1991-030, :on 911121,grab Sample for Inoperable Condenser Air Ejector Exhaust Monitor Not Obtained.Caused by Inappropriate Operator Action.Samples Will Now Be Obtained Twice Per Shift + (ML20086P494)
- ML20086P498 + (ML20086P498)
- 3F1291-01, Responds to Generic Ltr 88-20,Suppl 4 Re Individual Plant Exam of External Events.As Result of Geographic Location of Plant & Bulk of Util Svc Area,Plant Grid & Plant Designed for Hurricanes & Tornados + (ML20086P501)
- ML20086P507 + (ML20086P507)
- ML20086P536 + (ML20086P536)
- ML20086P545 + (ML20086P545)
- 05000389/LER-1984-001-01, :on 840119,while at 100% Power,Turbine & Reactor Tripped.Caused by Generator Ground & Potential Transformer Drawer Disconnect Contacts Misaligned.Contacts Realigned + (ML20086P565)
- B15297, Provides Correction to Proposed Rev to TS Re Containment Purge Exhaust & Supply Valves from Radiation Monitoring Instrumentation TS Table to ESF Actuation Sys TS Table + (ML20086P567)
- ML20086P572 + (ML20086P572)
- ML20086P586 + (ML20086P586)
- ML20086P591 + (ML20086P591)
- ML20086P596 + (ML20086P596)
- ML20086P602 + (ML20086P602)
- 05000219/LER-1991-002, :on 910221,local Leak Rate Testing Identified MSIV W/Leak Rate in Excess of Acceptance Criteria of 12.08 Scfh at 20 Psig.Caused by Age of Soft Disc Seat on One Valve.Leaking Valves Repaired + (ML20086P611)
- PLA-2032, Responds to NRC Re Violations Noted in IE Insp Rept 50-387/83-17.Corrective Actions:Health Physics Foreman Will Review Routine Survey Schedules Weekly for Time Completions & Violation Posted,Per 10CFR19 + (ML20086P615)
- 05000219/LER-1991-008, :on 911112,difference Between Test Measured & Indicated Feedwater Flow Discovered as Result of Special Lithium Nitrate Flow Test.Cause Not Determined.Reactor Power Reduced to Account for Difference + (ML20086P619)
- 3F1291-06, Suppl 1 to TS Change Request 185 to License DPR-72, Explaining Differences Between Proposed TS & Model Provided in Generic Ltr 90-09 Re Snubber Visual Insp Intervals & Corrective Actions + (ML20086P624)
- ML20086P630 + (ML20086P630)
- JPN-95-034, Forwards Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements + (ML20086P631)
- ML20086P632 + (ML20086P632)
- ML20086P636 + (ML20086P636)
- ML20086P637 + (ML20086P637)
- 05000413/LER-1991-023, :on 911117,discovered That Suction Isolation Damper for a Train CR Air Handling Unit Had Failed to Close. Caused by Equipment Failure/Malfunction Due to Failed Hydromotor.Work Request Initiated + (ML20086P639)
- ML20086P642 + (ML20086P642)
- ML20086P650 + (ML20086P650)
- ML20086P656 + (ML20086P656)
- ML20086P667 + (ML20086P667)
- ML20086P676 + (ML20086P676)
- ML20086P694 + (ML20086P694)
- ML20086P701 + (ML20086P701)
- ML20086P703 + (ML20086P703)
- ML20086P707 + (ML20086P707)
- ML20086P715 + (ML20086P715)
- 05000370/LER-1984-001-02, :on 831231,RHR Np Pump B Observed to Have Zero Discharge Flow.On 840109,computer Alarm for Np Pump a Dischange Pressure Received.Caused by Procedural Deficiencies Due to Inadequate Guidelines + (ML20086P716)
- PLA-3704, Sumbits Schedule to Address Requirements of Section 3.9 of ERDS Implementation Plan,Per NUREG-1394,Rev 1.Data Point Library Will Be Provided by 920205.Preliminary Transmission Testing Will Be Ready for Unit 1 on 920803 + (ML20086P728)
- ML20086P729 + (ML20086P729)
- ML20086P740 + (ML20086P740)
- ML20086P743 + (ML20086P743)
- 05000247/LER-1983-048-03, /03L-0:on 831220,during Surveillance Test PTM-46, Normal Supply Breaker to 480-volt Bus 2A Opened,Causing Rod Drop Trubine Runback.Caused by Inadvertent Operation of Normal Supply Breaker.Power Restored + (ML20086P752)
- ML20086P757 + (ML20086P757)
- ML20086P759 + (ML20086P759)