Advises That Four Modules Were Replaced W/New Sensing Modules Mfg After 890711 & Spare Module Replaced Maintained in Parts Inventory,In Response to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount
ML20086P676
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/19/1991
From: Zach J
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-91-151 IEB-90-001, IEB-90-1, VPNPD-91-448, NUDOCS 9112270126
Download: ML20086P676 (1)


Text

.

.-~

Wisconsin Electnc POWER COMPANY

- 234 w Michigart PO h 7046 Md.f.AAee W $3201 (414)221 2345 VPNPD-91-448 NRC 151 December 19, 1991

-Document Control '

ik U.

S.

NUCLEAR REGb ATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

I DOCKETS 50-266-AND 50-301 NRC BULLETIN NO.-90-01. LOSS OF FILL OIL IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 In our July-6, 1990 response to NRC Bulletin No. 90-01, Wisconsin Electric-(WE) committed to replace four Rosemount Model 1154 differential pressure transmitter sensing modules in 1991.

The replacement of these modules is complete.

The four modules.were replaced with new sensing modules manufactured after July 11, 1989.

WE also replaced a spare module which is maintained in our parts inventory at Point Beach Nuclear Plant.

Very truly yours, l

?

.c prv.r~ g oc)p

.Ja s J.

Fac Vi e President Nuclear Power Copics to:

NRC Resident Inspector NRC Regional Administrator, Region III i-l-

9112270126 111219

/

PDR -ADOCK 05000266

'l l

O PDR k

l

/

J j

l-A sahskhm of Hiuvasm Exqs Gv;xmrtim