ML20086P707

From kanterella
Jump to navigation Jump to search
Amends 90 & 83 to Licenses NPF-2 & NPF-8,respectively, Correcting Page Number 12 to Page 10 of NPF-2 & Correcting Amend Number from 90 to 83 of NPF-8
ML20086P707
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/16/1991
From: Boyd R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20086P710 List:
References
NUDOCS 9112270159
Download: ML20086P707 (3)


Text

'li.,,

H.

This license is effective as of the date of issuance and shall expire at midnight, June 25, 2017.

FOR M WDC1ZAR R53M20RY COPHIS$1CN f

Rcger 8.

,D r

Division o Project Management Office of Noclear Reactor Asgalation Attachments:

1.

A;peMices A & B - Technical Specifications 2.

Preoperational Tests, startup Tests aM Other ItaJas Which Must Be Ccepleted Prior to Proceeding to Socceeding.

Operational Modes

. Date of Issuance:- a g g g7 Unit 1 Mendment No. BJ, 90 l

Farley 9112270159 911216 PDR ADOCK 05000348 P

PDR

k$$;$'

.,s

~

mY'

__,4,

(6)

Southern Nuclear,-pursuantito th'e:Act and;10^CFR l.

Parts-30,f40~and--70,oto possess,-bu notiseparate,--

such? byproduct and.special_ nuclear materials-as_may be-produced by the operation of1the facility.

Thisili$ense:shall-be deemed to contain and is subject.

'l C.

to~the conditions specified:in the' Commission's regulations; set-forth in 10 CFR. Chapter I and"is sub ect s

to-.alliapplicsble; provisions of.the-Act and'to the-rules,iregulations, andEordars of the Commission now or' g

hereaftery in_effect;Jand is subject to the additional:

~

conditions'specified or: incorporated belows.

Maximum Power' Level-(1) _

-South'ern' Nuclear'.s authorized to operate the l

1

' facility at reactor core power-levels not in excess; of 2652 megawatts: thermal.

~

,(2)- Technical-Soecifications The Tecnnical-Specifications contained in h, M '

Appendices-A'andTB, as-revised-through Amendment

_ No.83 :,L are hereby incorporated -in the license.

' Southern Nuclear shall operate the facility in

~

~

acco; dance with -the-Technical Specifications.

(3) -Initial Test Procram=

Alabama' Power Company'shall conduct the" initial!

= test program?(wet 4-forth:in-Section 14xof:the Final l

Safety Analysis: Report as amended)_without making-

.any modificationsLto:thisLprogram unless such modifications are.in:accordance-with the provisions ofE10 CFR-Section?50.59.

In addition, Alabama l

Power Company shall not make-any major l

1

- modifications to this program.unless the -

modificati:ns have-been identified and have received prior NRC approval.

Major modifications are; defined-as:

a a.-. Elimination offany test identified as essential

-in Section:141 of.the Final Safety. Analysis-l j

Report, as amended;:

b.

Modification of. test objectives, methods or acceptance criteria for.any. test identified as ussential in Section 14 of the Final' Safety:

l Analysis Report, as amended; c.

-Performance of any test at a power level different from the level in the described

-program; and 6,

!Farley - Unit 2 Amendment No. 83 J

n:

I

- - _ _ _ _ _ = =

.L

DISTRIBUTION.

j l

l Docket File, 50-348/50-364E I

NRC PDR Local PDR PDII-1 Reading:

Farley L. Reyes Rll S. Varga 14-E-4 G. Lainas 14-H-3 E. Adensam 14-B-20 P. Anderson 14-0-20 S. Kirslis 14-B-20 S. Hoffman (2) 14-B-20 OGC 15-B-18 D. Hagan MNBB-3302 G. Hill PI-137 (8)

Wanda Jones P-130A C. Grimes 11-D-3 ACRS (10)

P-315 GPA/PA 17-F-2 OC/LFMB AR-2015 D. Nash PDII-3, PD PDII-3, LA cc:

Farley Service list