Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000370/LER-1991-012-04, :on 911108,shutdown Bank C Control Rods Dropped Into Core as Reactor Operator Attempted to Step Bank in, Resulting in Generation of High Negative Flux Rate Trip. Caused by Equipment Failure.Cards Replaced + (ML20086K083)
- SNRC-1874, Forwards Response to Request for Addl Info During 911126-27 Telcons Re Decommissioning Plan.Jib Cranes Will Be Installed in Reactor Bldg to Facilitate Matl Handling During Decommissioning,Per NUREG-0612 + (ML20086K086)
- ML20086K087 + (ML20086K087)
- SNRC-1872, Forwards Revised,Proposed Tech Specs,Addressing Composition, Qualifications & Review Function of Util Independent Review Panel,Per NRC Request + (ML20086K093)
- 05000387/LER-1983-162-03, /03L-0:on 831128,RHR B Svc Water Motor Operated Valve HV11210B Would Not Operate in Open Direction for Suppression Pool Cooling.Caused by Failure of Auxiliary Contact in Circuit Breaker Valves + (ML20086K094)
- ML20086K096 + (ML20086K096)
- ML20086K098 + (ML20086K098)
- ML20086K102 + (ML20086K102)
- 05000219/LER-1991-007, :on 911102,discovered That Offgas Sys Isolation Function Exceeded 15-minute Delay Limit in Ts. Caused by Inadequate Technical Evaluation of Replacement Time Delay.Surveillance Procedures Revised + (ML20086K103)
- ML20086K104 + (ML20086K104)
- 05000362/LER-1983-113-03, /03L-0:on 831210,control Element Assembly Calculator 2 Failed.Caused by Faulty Central Processing Unit.Board Replaced + (ML20086K105)
- ML20086K108 + (ML20086K108)
- 05000328/LER-1991-006-03, :on 911107,reactor Tripped on lo-lo Steam Generator Level in Loop 4 During MSIV Partial Stroke Test. Caused by Failure of Limit Switch to Actuate.Switch Replaced & MSIV Successfully Retested + (ML20086K109)
- ML20086K110 + (ML20086K110)
- ML20086K113 + (ML20086K113)
- ML20086K115 + (ML20086K115)
- ML20086K117 + (ML20086K117)
- ML20086K119 + (ML20086K119)
- ML20086K122 + (ML20086K122)
- 05000317/LER-1983-070-03, /03L-0:on 831202,pressurizer Level Decreased to 130 Inches.On 831210 Pressurizer Level Decreased to 128 Inches.Rcs Temp Swing of 10 Degrees Not Uncommon During Normal Startup Operations + (ML20086K127)
- 05000362/LER-1983-120-03, /03L-0:on 831222,while in Mode 1,both Main Feedwater Pumps Tripped Due to Low Suction Pressure.Caused by High Water Demand on Condensate Storage Tank 3T-121 by Auxiliary Feedwater Sys.Review Underway + (ML20086K130)
- ML20086K132 + (ML20086K132)
- ML20086K139 + (ML20086K139)
- PY-CEI-NRR-1967, Monthly Operating Rept for June 1995 for Perry NPP + (ML20086K140)
- ML20086K148 + (ML20086K148)
- ML20086K149 + (ML20086K149)
- ML20086K150 + (ML20086K150)
- ML20086K157 + (ML20086K157)
- ML20086K160 + (ML20086K160)
- ML20086K162 + (ML20086K162)
- 05000328/LER-1983-189-03, /03L-0:on 831224,while in Mode 1,feedwater Flow Channel 2-FT-3-90 Declared Inoperable Due to Frozen Sense Line.Caused by Extreme Low Outside Temp & Blown Fuse in Heat Trace Circuit.Fuse Replaced + (ML20086K163)
- ML20086K164 + (ML20086K164)
- PLA-2006, Interim Part 21 Rept Re Improper Relief Valve Settings & Design Pressures & Temps Found in Hpci,Rcic,Rhr,Core Spray & Essential Svc Water Sys.Initially Reported on 831118. Hydrotests Performed + (ML20086K165)
- ML20086K167 + (ML20086K167)
- ML20086K170 + (ML20086K170)
- ML20086K173 + (ML20086K173)
- ML20086K175 + (ML20086K175)
- 05000277/LER-1983-026-03, /03L-0:on 831205,during Startup,Moisture Monitoring Sys Failed While Undergoing Surveillance Testing. Caused by Improperly Positioned Potter & Brumfield Relay Model R10-EL-W2-V700.Relay Readjusted + (ML20086K176)
- ML20086K179 + (ML20086K179)
- ML20086K187 + (ML20086K187)
- ML20086K189 + (ML20086K189)
- AECM-84-0013, RO 83-115/0:on 831212,Fire Rated Door 1A301 from Auxiliary Bldg to Turbine Bldg Would Not Close.Caused by Heavy Use Damaging Door Closer.Door Restored on 840111 + (ML20086K193)
- 05000301/LER-1991-005-01, :on 911111,determined That Both Safety Injection Pump Breakers Racked in W/Rcs Temperature Less than 270 F.Caused by Procedural Inadequacy.Operator Aids Will Be Installed in Vicinity of Subj Breakers + (ML20086K194)
- ML20086K195 + (ML20086K195)
- 05000373/LER-1991-015-03, :on 911107,determined That Certain ESF Bus Under Voltage Relay Contacts Were Not Functionally Tested. Caused by Inadequate Testing Procedures.Undervoltage Trip Paths Tested & Test Procedures Will Be Revised + (ML20086K197)
- 05000260/LER-1983-082-03, /03L-0:on 831223,during Normal Operation, Recirculation Pump 2A Tripped Due to Actuation of Relay 2A-K21A Neutral Overvoltage.Caused by Gouged Insulation on Phase C Conductor in Cable 2PP1005 + (ML20086K198)
- ML20086K204 + (ML20086K204)
- 05000278/LER-1991-017-02, :on 910924,Automatic Depressurization Sys Discovered Inoperable Due to Components Being Unqualified. Caused by MSRV Thermal Insulation Being Improperly Installed.Subj Insulation Properly Reinstalled + (ML20086K206)
- ML20086K207 + (ML20086K207)
- BSEP-84-0092, Ro:On 831212,double Fire Door 110 Declared Inoperable Because of Encountered High Differential Air Pressure Across Door,Preventing Automatic self-closure.Plant Engineer Requested to Evaluate Problem + (ML20086K211)
- ML20086K214 + (ML20086K214)