Monthly Operating Rept for June 1995 for Monticello Nuclear Generating Station
ML20086K173
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/30/1995
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
M1995136, NUDOCS 9507200042
Download: ML20086K173 (5)


Text

/*.

g N1995:.36 Northem States Power Company Monticetto Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362 9637 July 13,1995 Monticello Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operatina Report for June.1995 in accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the Month of June is provided.

Please contact Marv Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.

(j{

Soc eoA Roger O Anderson Director Licensing and Management issues c:

Regional Administrator-lil, NRC NRR Project Manager, NRC Sr Resident inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg phk

$Do g[

f62Y a

in

+-

e OPERATING DATA REPORT DOCKET NO.

50-263 DATE 7-1-95 COMPLETED BY H.

H.

Paustian TELEPHONE 612/295-5151 OPERATING STATUS JNotes j

Monticello

]

]

1. Unit Name 2.

Reporting period:

June

]

]

3. Licensed Thermal Power (MWt ) :

1670

]

]

4. Nameplate Rating (Gross MWe) :

569

]

]

5. Design Electrical Rating (Net MWe):

545.4

]

]

6. Maximum Dependable Capacity (Gross MWe) :

564

]

]

7. Maximum Dependable Capacity (Net MWe):

~~536

)

]

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
11. Hours In Reporting Period 720 4343 210384
12. Number Of Hours Reactor Was Critical 720.0 4343.0 171342.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 720.0 4343.0 168453.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1201311 7220235 260706687
17. Gross Electrical Energy Generated (MWH) 401549 2451162 88134640
18. Net Electrical Energy Generated (MWH) 383962 2361600 84336710
19. Unit Service Factor 100.0%

100.0%

80.1%

20. Unit Availability Factor 100.0%

100.0%

80.1%

21. Unit Capacity Factor (Using MDC Net) 99.5%

101.4%

74.8%

22. Unit Capacity Factor (Using DER Net) 97.8%

99.7%

73.5%

33. Unit Forced Outage Rate 0.0%

0.0%

3.5%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

_ Refueling - 4/6/96 38 days

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A t
26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Ys AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263 UNIT Monticello DATE 7-1-95 COMPLETED BY H.

H.

Faustian TELEPHONE 612/295-5151 l

MONTH OF June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 539.

17 530.

2 544.

18 521.

3 539.

19

527, 4

538.

20 526.

5 536.

21 525.

6 536.

22 524.

7 536.

23 526.

8 538.

24 525.

9 541.

25 526.

10 547.

26 527.

11 539.

27 529.

13 542.

28 529.

13 540.

29 531.

14 539.

30 532.

15 536.

16 531.

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

t

1 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263 DATE 7-1-95 COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 MONTH JUN 6-01-95 to Power operation.

6-30-95 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

i I

i 1

e LNIT SHUrDOVNS AND POWER REDUCTIONS DOCKET NO.

50-263 LNIT NAME ~Monticello DATE 07-03-95 COMPLETED BY 11. B. Paustian REPORT MONTH June TELEPHONE _612/295-5151. -

No.

Date Duration Reason Method LER System Comp.

Cause & Corrective Ty(pe (hours)

(2) of No.

Code Code Action to 1)

Shutdown (4)

(5)

Prevent Recurrence (3)

None P

1 2

3 4

F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)