MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
,i 1
I VIRGINIA POWER. COMPANY i NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH: June YEAR: 1995 1
Approved:
O !
Station Manager 9507200035 950713 PDR ADOCK 05000338 R PDR
- . OPERATING DATA REPORT l *
- l. .
DOCKET NO.: 50-338 DATE: July 5, 1995 CONTACT: J. A. Stall l PHONE: (703) 894 2101 OPERATING STATUS i
i 1. Unit Name:................................ North Anna 1 2, Reporting Period:............... ......... June 1995
- 3. Licensed Thermal Power (MWt):............. 2,893
- 4. Nameplate Rating (Gross MWe):............. 994
- 5. 01 sign Electrical Rating (Net MWe):....... 907
- 6. Mrximum Dependable Capacity (Gross MWe):.. 948
( '
- 7. MIximum Dependable Capacity (Net MWe):.... 900 1
1 1
If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons: _N/A S.
I l
- 9. Power level to which restricted, if any (Net MWe): _ N/A
- 10. R2asons for restrictions, if any: N/A This Month Y-t-D Cumulative
- 11. Hours in Reporting Period......................... .... . 720.0 4,343.0 149,219.0 ;
- 12. hanber of Hours Reac t or was Cr i t i cal . . . . . . . . . . . . . . . . . . . . . . 720.0 4,321.6 112,769.4
- 13. Reac tor Reserve Shutdown Hours. . . . . . . . . . . . . . ........... 0.0 20.9 6,951.4
- 14. Hours Generator On-Line........ ...................... .. 720.0 4,316.8 109,770.5
- 15. Unit Reserve Shutdown Hours........ .......... ........... 0.0 0.0 0.0 j
- 16. Gross Thermal Energy Generated (MWH)...................... 2,082,164.1 12,421,268.6 292,606,848.5 !
- 17. Gross E lec t ri cal Energy Generated (MWH) . . . . . . . . . . . . . . . . . . . 684,018.0 4,086,277.0 96,161,897.0
- 18. Net Electrical Energy Generated (MWH).................. .. 650,019.0 3,887,458.0 91,089,744.0
- 19. Unit Service Factor....................................... 100.0% 99.4% 73.6%
- 20. Unit Availability Factor.................................. 100.0% 99.4% 73.6%
- 21. Unit Capacity Factor (using MDC Net)...................... 100.3% 99.5% 68.3%
i
- 22. Unit Capacity Factor (using DER Net)...................... 99.5% 98.7% 67.3%
- 23. Forced Outage Rate........................................ 0.0% 0.6% 9.6%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):_N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup:_N/A
- 26. Units in Test Status (Prior to Consnercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
i
?
AVERAGE DAILY UNIT POWER LEVEL i
Docket No.: 50-338 Unit: NA-1
} Date: Julv 5, 1995 J
Contact:
J. A. Stall Phone: (703) 894-2101 MONTH: June 1995 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net, LEVEL (MWe-Net) 1 904 17 303 2 904 18 903 3 904 19 902 4 904 20 902 5 904 21 903 6 904 22 902 7 904 23 894 8 904 24 903 9 904 25 902 b
10 904 26 902 11 903 27 902 12 903 28 903 13 903 29 903 14 903 30 902 15 903 16 903 _
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
's
NORTH ANNA POWER STATION l 1
UNIT NO.: 1 l MONTH: June
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data June 01, 1995 0000 Began month with unit at 100% power, 952 MWe.
June 23, 1995 0939 Commenced ramping unit from 100% power, 950 MWe for performance of Turbine Valve Freedom Test (TVFT).
1030 Unit stable at 90% power, 865 MWe.
1148 Turbine Valve Freedom Test completed satisfactory.
1200 Commenced ramping unit from 90% power, 861 MWe following TVFT.
1331 Unit stable at 100% power, 950 MWe.
June 30, 1995 2400 Ended month with unit at 100% power, 938 MWe.
1 l
e Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-338 Report Month June Unit Name: NA-1 Year: 1995 Date: Julv 5. 1995
Contact:
J. A. Stall
1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-338 UNIT NAME: NA-1 ,
DATE: July 5, 1995 REPORT MONTH: June 1995 CONTACT: J. A. Stall PHONE: (703) 894-2101 .
1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence O No Entry This Month 4
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee-D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H-Other (explain) Exhibit H - Same Source
- OPERATING DATA REPCRT DOCKET NO.: 50-339 DATE: July 5, 1995 CONTACT: J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS
- 1. Unit Names................................ North Anna 2
- 2. Rrporting Period:......................... June 1995
- 3. Li censed Therma l Power (MWt ): . . . . . . . . . . . . . 2893
- 4. Nameplate Rating (Gross MWe):............. 979
- 5. Dzsign Electrical Rating (N2t MWe) ....... 907
- 6. Mixinum Dependable capacity (Gross MWe):.. 935
- 7. nsximum Dependable Capacity (Net MWe):.... 887
- 8. If changes occur in Capacity Ratings (!tems No. 3 thru 7) since last report, give reasons: _ N/A 9 Power level to which restricted, if any (Net MWe): N/A
- 10. Reasons for restrictions, if any: N/A This Month YtD Cumulative
- 11. Hv 7 in Reporting Period................................. 720.0 4,343.0 127,487.0
- 12. NLam r of Hours Reac t or has Cr i t i cal . . . . . . . . . . . . . . . . . . . . . . 720.0 2,732.7 105,666.2
- 13. Reac tor iteserve Shutdown Hours. . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0 1.3 6,510.2
- 14. Hours Generator On-Line.......... ... .................... 707.4 2,700.9 104,536.6 1
- 15. Unit Reserve Shutdown Hours............................... 0.0 0.0 0.0 )
I
- 16. Gross Thermal Energy Genera t ed (MWH ) . . . . . . . . . . . . . . . . . . . . . 1,849,601.9 6,724,738.1 283,340,702.1 ,
- 17. Gross E l ect r i cal Energy Generat ed (MWH) . . . . . . . . . . . . . . . . . . . 605,837.0 2,193,537.0 92,670,394.0 I
- 18. Net Elec t rical Energy Generat ed (MWH) . . . . . . . . . . . . . . . . . . . . . 573,605.0 2,074,464.0 88,614,432.0
]
- 19. Unit Service factor........................... ........... 98.2% 62.2% 82.0% !
- 20. Unit Availability Factor. ................................ 98.2% 62.2% 82.0%
- 21. Unit Capacity Factor (using MDC Net)...................... 89.8% 53.9% 77.3%
- 22. Uni t capac i ty F ac t or (usi ng DE R Net ) . . . . . . . . . . . . . . . . . . . . . . 87.8% 52.7% 76.6%
- 23. Forced Outage Rate........................................ 0.0% 0.0% 5.0%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achleyed IN!11AL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION r
. =. _. . - . - . . . . . . . ... .. - . . . _ - . . . . . . .
4:
1 AVERAGE DAILY UNIT POWER LEVEL l
'l Docket No.: 50-339 Unit: NA-2
, ;-- Date: Julv 5, 1995
Contact:
J. A. Stall l Phone: (703) 894-2101 j f
9 MONTH: June 1995 I
i i
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) .
1 84 17 910
- 2 184 18 909 3 299 19 908 4 586 20 908 ,
5 728 21 907 !
6 799 22 907 7 733 23 908 ;
8 733 24 909 l 9 759 25 908 l 10 908 26 904 :
11 909 27 820 !
12 909 28 910 -l 13 910 29 911 !
14 910 30 909 15 911 16 910 q t
I Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest-whole megawatt, u
1
.. 1
- NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: June
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 2 Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data June 01, 1995 0000 Began month with unit stable at 4.7% Reactor ;
power in Mode 2, waiting for chemistry hold to clear to increase power and go on line following 1995 Refueling / Steam Generator Replacement outage.
June 01, 1995 0931 Unit entered Mode 1.
1239 Unit placed on-line. Commenced ramp-up to 30%
power.
1323 Unit stable at 30% power, 231 MWe.
June 03, 1995 0940 Commenced unit ramp-up following release from Chemistry hold. Unit at 30% power, 231 MWe.
1445 Unit stable at 50% power. Suspended unit ramp-up due to high sulfate concentrations in Steam Generators.
June 1, 1995 0339 Chemistry hold cleared. Commenced unit ramp-up.
1010 Unit stable at 74.5% power, 707 MWe for Chemistry hold.
June 05, 1995 1048 Cleared Chemistry hold. Commenced unit ramp-up. Unit at 75% power, 718 MWe, 1228 Suspended unit ramp-up due to Chemistry Action Level I on sodium in "A" and "C" Steam Generators. Unit at 81.5% power, 779 MWe.
1343 Cleared Action Level for Steam Generator chemistry. Commenced unit ramp-up.
1601 Unit stable at 88% power (nuclear instrumentation) and 100% power (delta temperature).
June 06, 1995 0155 Commenced unit ramp-up following nuclear instrumentation calibration and adjustment.
Unit at 88.3% power, 843 MWe.
I
~
SUMMARY
OF OPERATING EXPERIENCE Page 2 of 2 June 06, 1995 0410 Secured unit ramp-up to allow power level verification. Unit at 96% power (nuclear instrumentation) and 95% power (calorimetric) ,
900 MWe.
1435 Commenced unit ramp-down due to decreasing Main Condenser vacuum.
1512 Unit stable at 84 % ' power, 782 MWe. Main Condenser vacuum returning to normal.
1800 Chemistry hold cleared. All secondary-parameters within specifications. Commence condenser waterbox leakage testing.
June 09, 1995 1645 Commence power increase after waterbox maintenance.
June 10, 1995 0023 Unit stable at 100% power, 948 MWe.
June 27, 1995 1228 Commenced ramping unit off-line due to failure of "B" Solid State Protection PT (action of T.
S. 3.3.1.1 and 3.3.2.1). ,
1 1413 Unit ramp-down secured at 33% power, 266 MWe, 1416 "B" Train of Solid State Protection declared l operable. l l
1438 Commenced unit ramp-up to 100% power. Unit at 34.5% power, 270 MWe. ,
1743 Stopped unit ramp-up for calorimetric calibration of nuclear instrumentation. Unit at 90% power, 857 MWe.
1750 Commenced unit ramp-up to 100% power.
1835 Unit stable at 100% power, 951 MWe.
June 30, 1995 2400 Ended month with unit stable at 100% power, 950 i Mwe.
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-339 f
Report Month June Unit Name: NA-2 Year: 1995 Date: July 5, 1995
Contact:
J. A. Stall
- 95-02 Power reduction initiated from 100% power due to failure of "B" Solid State Protection Testing on June 27, 1995 at 1228 hours0.0142 days <br />0.341 hours <br />0.00203 weeks <br />4.67254e-4 months <br />. Ramp terminated at 33% power June 27, 1995 at 1413 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.376465e-4 months <br />, i
l I
DOCKET NO.: 50-339
- UNIT NAME: NA-2 DATE: July 5, 1995 REPORT MONTH: June 1995 CONTACT: J. A. Stall PHONE: (703) 894-2101 '
1 2 3 4 5 3 No. Date Type Duration Reason P-athod of Licensee System Component Cause & Corrective !
(hrs) Shutting Event Code code Action to y Down Reactor Report # Prevent Recurrence .
6 95-02 950627 F 0 B/A 5 N/A N/A N/A N/A g y
i E
n G
1: Type 2: Reason 3: Method 4: 3 F= Forced A= Equipment Failure (explain) 1= Manual S= Scheduled B= Maintenance or Test 2= Manual Scram Exhibit F- Instructions $
C= Refueling 3= Automatic Scram for preparatict' tta Entry Sheets -_ __censee f
M D= Regulatory Restriction E= Operator Training & License Examination 4= Continuations 5= Load Reduction Event Report (LER) File y (NUREG-0161) .it F= Administrative 9=Other gy G= Operational Error 5: N H=Other (explain) Exhibit H - Same Source h-M
'9 y .
e i
l 1
l i
Corrected Page May 1995 North Anna Monthly Operating Report i
i I
l 1
i i
i l
l l
i 1
l