ML20086K157
| ML20086K157 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/09/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-28582-BSK, DER-83-32, NUDOCS 8401260317 | |
| Download: ML20086K157 (2) | |
Text
1 1
C IVED iv.C Arizona Public Service Company PO. BOX 71666 + PHOENIX. ARIZONA 85036 O
U i
G.ll " T.6 January 9, 1984.
ANPP-28582-BSK/TRB ff U. S' Nuclear Regulatory Commission Region V
~ Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 83-32 A 50.55(e) Potentially Reportable Deficiency Relating To Socket Welds In Unit 1 Steam Generator Process Piping Are In Violation of Requirements File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation-between T. Young and R. Tucker on May 25, 1983 (B) ANPP-24171 dated, June 24, 1983 (Interim Report)
(C) ANPP-27522 dated, August 5, 1983 (Time Extension)
(D) ANPP-28094 dated, October 26, 1983 (Time Extension)
(E) ANPP-28392 dated, December 8,1983 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and Time Extensions were requested by References (C), (D), and (E). At that time, it was estimated that a Final Report would be available by January 13, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by February 28, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly your M
G kN,%
1 E. E. Van Brunt, Jr.
APS Vice President 8401260317 840109 Nuclear Projects Management 7
PDR ADOCK 05000528 ANPP Project Director S
PDR EEVB/TRB:db f
f I cc:
See Page Two l$ b Y
,f t
f Mr. T. W. Bishop DER 83-32 Page Two cc:
Richard DeYoung, Director Office of Inspection and Enforcement-
-U.-S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
J. A. Roedel D. B. Fasnacht-A. C. Rogers B. S. Kaplan Wi E. Ide-J. ' Voree s J. R. Bynum y-D. D. Green P. P. Klute' A. C. Gehr
- 11. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H Foster /
D.! R. Haw'kinson =
L. E. Vorderbrueggen r
G. A. Fiorelli 6
S.~ R. Frost J. Self
'D.' Canady Records Center Institute of Nuclear Power Operations 1100 circle 75' Parkway,, Suite 1500 Atlanta, GA'30339 w
I i
/
^
I i
..