Interim Deficiency Rept DER 83-76 Re Logic for Auxiliary Feedwater Pump Turbine Steam Supply Valves Contrary to FSAR Requirements.Due to Extensive Investigation & Evaluation, Next Rept Will Not Be Submitted Until 840330
ML20086K204
Person / Time
Site: Palo Verde  
Issue date: 01/10/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28588-BSK, DER-83-76, NUDOCS 8401260349
Download: ML20086K204 (2)


Text

L v.

O o.

f'ECEIVEu IJRC Arizona Public Service Company P.o. box 2166r. PHOENIX. ARIZONA 85036

.1356 JM! l 8 PH 12: Ic January 10, 1984 ANPP-28588-BSK/ M '*"/I'U:

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-76 A 50.55(e) Potentially Reportable Deficiency Relating To The Logic For The Auxiliary Feedwater Pump Turbine (AFPT) Steam Supply Valves Is Contrary to FSAR Requirements.

Fi'e: 84-019-026; D.4.33.2

Reference:

(A)' Telephone conversation between R. Dodds and R. Tucker on November 2, 1983 (B) ANPP-28360, dated December 5, 1983(Interim Repdrt)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interia Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by r

. January 28,- 1984.

~ Due to the extensive investigation and evaluation required, it is now expected that this information'will be finalized by March 30, 1984, at which-time a complete report will be submitted.

There'is no new information or change to the Interim Report at this time.

Very truly yours

[

CLLL.

MLk}

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVB/TRB:ru cc: See Page Two l l t

8401260349 840110 PDR ADOCK 05000528

S je-jf PDR

(g y

s i.

Mr. T. W. Bishop DER 83 -

Page Two i

cc:

Richard DeYoung, Director Office of Inspection and. Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht A. C. Rogers 9

B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green l

P. P..Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. Foster-D. R. Hawkinson L. E. ' Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady

[

Records Center i

Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, CA 30339-l i

i r

~,.-.---,y.y.

-,., _ _.,. - -,~, -_ _ - --,...

.w.

.-v.-

m--