OPERATING DATA REPORT DOCKET No.:
50 339 DATE: June 5,1995 CONTACT:
J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS 1.
Un i t Nane :................................ Nor th Anna 2 2.
R eport i ng Per i od:.........................May 1995 3.
Licensed Thermal Power (MWt ):.............
2893 4.
Nameplate Rating (Gross MWe):.............
9 79 5.
Design Electrical Rating (Net MWe):.......
907 6.
M1ximum Dependable capacity (Gross MWe):..
935 7.
MIximum Dependable Capacity (Net MWe):....
887 8.
If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons: ___N/A 9.
Power level to which restricted, if any (Net MWe): ____N/A
- 10. Reasons for restrictions, if any:
N/A This Month Y-t-D Cunulative
- 11. H ours i n R eport i ng Per i od.................................
744.0 3,623.0 126,767.0
- 12. Number of Hours Reactor was Critical.....................
18.7 2,012.7 104,946.2
- 13. Reactor Reserve Shutdown Hours............................
0.0 1.3 6,510.2
- 14. Hours Generator 0n-Line...................................
0.0 1,993.5 103,829.2
- 15. Unit Reserve Shutdown Hours...............................
0.0 0.0 0.0
- 16. Gross Thermal Energy Generat ed (MWH)......
497.6 4,875,136.2 281,491,100.2
- 17. Cross E lec t r i cal Energy Generat ed (MWH )..................
0.0 1,587,700.0 92,064,557.0
- 18. Net E lec t rical E nergy Generat ed (MWH).....................
0.0 1,500,859.0 88,040,827.0
- 19. Unit Service Factor...................................
0.0%
55.0%
81.9%
- 20. Unit Availability Factor............
0.0%
55.0%
81.9%
- 21. Uni t Capac i ty F ac t or (using MDC Net )......................
0.0%
46.7%
77.2%
- 22. Unit Capacity Factor (using DER Net).......
0.0%
45.7%
76.6%
- 23. F orc ed Out a g e R a t e....................................
0.0%
0.0%
5.1%
- 24. Shutdowns Scheduled Over Next 6 Months tTyps, Date, axi Duration of Each): __N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9507200039 950713 PDR ADOCK 05000338 R