ML20086K164

From kanterella
Jump to navigation Jump to search
Corrected Page for Monthly Operating Rept for May 1995 for North Anna Power Station Unit 2
ML20086K164
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/31/1995
From: Stall J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20086K154 List:
References
NUDOCS 9507200039
Download: ML20086K164 (1)


Text

=-.

e.

OPERATING DATA REPORT DOCKET No.:

50 339 DATE: June 5,1995 CONTACT:

J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS 1.

Un i t Nane :................................ Nor th Anna 2 2.

R eport i ng Per i od:.........................May 1995 3.

Licensed Thermal Power (MWt ):.............

2893 4.

Nameplate Rating (Gross MWe):.............

9 79 5.

Design Electrical Rating (Net MWe):.......

907 6.

M1ximum Dependable capacity (Gross MWe):..

935 7.

MIximum Dependable Capacity (Net MWe):....

887 8.

If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons: ___N/A 9.

Power level to which restricted, if any (Net MWe): ____N/A

10. Reasons for restrictions, if any:

N/A This Month Y-t-D Cunulative

11. H ours i n R eport i ng Per i od.................................

744.0 3,623.0 126,767.0

12. Number of Hours Reactor was Critical.....................

18.7 2,012.7 104,946.2

13. Reactor Reserve Shutdown Hours............................

0.0 1.3 6,510.2

14. Hours Generator 0n-Line...................................

0.0 1,993.5 103,829.2

15. Unit Reserve Shutdown Hours...............................

0.0 0.0 0.0

16. Gross Thermal Energy Generat ed (MWH)......

497.6 4,875,136.2 281,491,100.2

17. Cross E lec t r i cal Energy Generat ed (MWH )..................

0.0 1,587,700.0 92,064,557.0

18. Net E lec t rical E nergy Generat ed (MWH).....................

0.0 1,500,859.0 88,040,827.0

19. Unit Service Factor...................................

0.0%

55.0%

81.9%

20. Unit Availability Factor............

0.0%

55.0%

81.9%

21. Uni t Capac i ty F ac t or (using MDC Net )......................

0.0%

46.7%

77.2%

22. Unit Capacity Factor (using DER Net).......

0.0%

45.7%

76.6%

23. F orc ed Out a g e R a t e....................................

0.0%

0.0%

5.1%

24. Shutdowns Scheduled Over Next 6 Months tTyps, Date, axi Duration of Each): __N/A
25. If Shutdown at end of Report Period, estimated time of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9507200039 950713 PDR ADOCK 05000338 R

PDR