Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080E611 + (ML20080E611)
- ML20080E627 + (ML20080E627)
- ML20080E631 + (ML20080E631)
- W3P84-0299, Informs That Response to Item 4.5.1 of Generic Ltr 83-28 Re Reactor Trip Sys Reliability (Sys Functional Testing) Provided in Revised Procedure OP-903-006, Manual Reactor Trip Test + (ML20080E637)
- ML20080E639 + (ML20080E639)
- ML20080E640 + (ML20080E640)
- ML20080E642 + (ML20080E642)
- PY-CEI-NRR-0071, Requests Extension for Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events, to 840229.Delay Due to Drafting Procedures & Testing Requirements Still in Process + (ML20080E643)
- ML20080E649 + (ML20080E649)
- PY-CEI-NRR-0068, Forwards Requested Addl Info Re Instrumentation & Control Sys SER Outstanding Issue 12, Manual Initiation/Termination of ESF Sys, Issue 13, IE Bulletin 79-27 & Issue 14, Control Sys Failures + (ML20080E651)
- 05000263/LER-1984-002, :on 840107,control Room HVAC Sys Automatically Transferred to Toxic Chemical Emergency Mode Due to Spurious Trip of Hydrogen Chloride Monitor AT-9036.Cause Unknown. Investigation Revealed No Apparent Cause + (ML20080E655)
- PY-CEI-NRR-0070, Responds to SER Confirmatory Issues 41 & 42 Re Design for Noble Gas Effluent Monitors & Design for Sampling & Analysis of Plant Effluents.Responses Further Address TMI Action Items II.F.1.1 & II.F.1.2 + (ML20080E660)
- ML20080E665 + (ML20080E665)
- ML20080E667 + (ML20080E667)
- ML20080E668 + (ML20080E668)
- ML20080E671 + (ML20080E671)
- AECM-83-0569, Application to Amend License NPF-13,changing Tech Specs Re Min Allowable Count Rate for Source Range Monitoring Instrumentation.Affirmation Encl + (ML20080E674)
- ML20080E675 + (ML20080E675)
- ML20080E681 + (ML20080E681)
- ML20080E682 + (ML20080E682)
- ML20080E684 + (ML20080E684)
- ML20080E691 + (ML20080E691)
- ML20080E692 + (ML20080E692)
- NRC-94-4360, Forwards Proprietary AP600 Cmt Quick Look Rept for Series 300 Suppl,Nov 1994 & AP600 Cmt Quick Look Rept for Series 500 Matrix Tests,Dec 1994. Proprietary Repts Withheld (Ref 10CFR2.790) + (ML20080E695)
- ML20080E696 + (ML20080E696)
- ML20080E698 + (ML20080E698)
- ML20080E700 + (ML20080E700)
- ML20080E705 + (ML20080E705)
- ML20080E709 + (ML20080E709)
- ML20080E710 + (ML20080E710)
- ML20080E715 + (ML20080E715)
- ML20080E716 + (ML20080E716)
- ML20080E719 + (ML20080E719)
- ML20080E722 + (ML20080E722)
- ML20080E723 + (ML20080E723)
- 05000364/LER-1994-002-01, :on 941214,surveillance Not Performed on Swp Lube & Cooling Valves Due to Cognitive Personnel Error. Surveillance Schedules Reviewed to Ensure Corrected Schedules Placed + (ML20080E724)
- ML20080E725 + (ML20080E725)
- AECM-83-0519, Forwards Proposed Schedules to Complete Tech Spec Terminology Per Instrumentation & Control Sys Branch Concerns.Preliminary Review of Approx 130 Instrumentation Items Indicates Only One Necessitates Change + (ML20080E731)
- AECM-83-0540, Provides Justification for Hydrostatic Leakage Rate Testing Where Applicable & Justification for Delaying Pneumatic Testing of Affected Containment Isolation Valves Until Next Scheduled Test Date + (ML20080E743)
- ML20080E744 + (ML20080E744)
- ML20080E746 + (ML20080E746)
- ML20080E749 + (ML20080E749)
- ML20080E751 + (ML20080E751)
- ML20080E752 + (ML20080E752)
- ML20080E754 + (ML20080E754)
- ML20080E756 + (ML20080E756)
- ST-HL-AE-1001, Informs That Applicant Has Not Received NRC in-progress Audit Rept of Control Room Design Review (Crdr).Final Crdr Cannot Be Submitted Until at Least 9 Wks After Receipt of Audit.Rept Schedule Must Be Revised + (ML20080E757)
- ML20080E758 + (ML20080E758)
- ML20080E759 + (ML20080E759)
- ML20080E760 + (ML20080E760)
- ML20080E768 + (ML20080E768)