MONTHYEARML20236C5301989-03-14014 March 1989 Annual Rept 1988 ML20210P5471987-02-0505 February 1987 Annual Rept of Activities & Events for 1986 ML20214E2351986-02-28028 February 1986 Annual Rept of Activities & Events for 1985 ML20137V5401986-02-0606 February 1986 Annual Operating Rept for 1985 ML20080E6311983-12-31031 December 1983 Summarizes Experiments Performed During 1983,per 10CFR50.59 ML20071E5191983-03-0808 March 1983 Annual Operating Rept,1982 ML19290E8601980-03-0505 March 1980 Annual Rept for 1979. ML19261B9901979-03-0909 March 1979 Annual Operating Rept for 1978 1989-03-14
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML19325F1871989-11-30030 November 1989 Termination Radiation Survey Summary & Final Rept. ML20246G4091989-07-11011 July 1989 Safety Evaluation Supporting Dismantling & Disposition of Component Parts,Per 890120 Application ML20244D2581989-06-0707 June 1989 Safety Evaluation Supporting Amend 7 to License R-114 ML20236C5301989-03-14014 March 1989 Annual Rept 1988 ML20147B7421988-02-25025 February 1988 Safety Evaluation Supporting Amend 6 to License R-114 ML20215B8211987-06-0909 June 1987 Ro:On 870602,noted That Shim & Regulating Rod Positions for 10 Watt Check Considerably Higher than Expected.Caused by Aluminum Top End Fitting of Control Rod Poison Section Fracturing.Stainless Steel Insert Designed ML20210P5471987-02-0505 February 1987 Annual Rept of Activities & Events for 1986 ML20214E2351986-02-28028 February 1986 Annual Rept of Activities & Events for 1985 ML20137V5401986-02-0606 February 1986 Annual Operating Rept for 1985 ML20094E2951984-07-13013 July 1984 Rev 4 to Requalification Program for Licensed Operators ML20093A1271984-06-30030 June 1984 Rev 1 to SAR for Triga Reactor ML20091M8871984-05-0909 May 1984 Rev 3 to Requalification Program for Licensed Operators ML20080E6311983-12-31031 December 1983 Summarizes Experiments Performed During 1983,per 10CFR50.59 ML20071E5191983-03-0808 March 1983 Annual Operating Rept,1982 ML19347F8291981-05-14014 May 1981 Annual Financial Rept 1980 ML19290E8601980-03-0505 March 1980 Annual Rept for 1979. ML19261B9901979-03-0909 March 1979 Annual Operating Rept for 1978 ML20084F1111972-01-27027 January 1972 Ao:On 720118,during Routine Monthly Surveillance Test, Pressurizer Pressure Bistable Failed to Deenergize on Low Pressure Set Point.Caused by Fluctuating Output of Bistable When Placed on Trip Point.Bistable Replaced 1989-07-11
[Table view] |
Text
_ . __ _ .
MICHIGAN STATE UNIVERSITY Cou1GE OF LNGLNElRLNG EAST LANSING e MICHIGAN + 48824 1226 DIVIsloN OF LNGL%TJRLNG RESEARCH February 3, 1984 i
I Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Docket No.: 50-294 Michigan State University TRICA Reactor License R-114 t Annual Report
Dear Sir:
} Pursuant to 10CFR50.59 the following report is submitted:
i t
- 1. During the period of January 1 to December 31, 1983, the following experiments were performed:
- a. 1 central thimble irradiation
- b. 72 rotary specimen rack irradiations
- c. total operation of 5166 kilowatt-hours 2,
41 Ar release totaled 395.7 pCi or an average release rate of 3.4 x 10
-11 pCi/ml. (0.85%.of MPC)
- 3. There have been nn apparent changes in the tank bottiom.
, 4. During the reporting period there were 5 unscheduled SCRAMS:
a) 3 period scrams due to operator error.
b) 5 period scrams caused by log recorder noise.
2 i
- 5. During 1983 there were 2 students in training for operator licenses.
Currently there are no trainees.
Sincerely, Bruce W. Wilkinson l Reactor Supervisor-l