ML20080E684

From kanterella
Jump to navigation Jump to search
Serves as Documentation of Spiked Sample Results from Idaho Falls Spiked Water Sample 9407-NRC-02
ML20080E684
Person / Time
Site: Cooper 
Issue date: 01/09/1995
From: Mueller J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS950007, NUDOCS 9501170204
Download: ML20080E684 (3)


Text

6Q:;f,

a

+

COOPER NUCLEAR ST ATtoN Nebraska Public Power District

" " "'A"c" *o"/ct=l,""^,5,*^ "" '

u.

NLS950007 January 9, 1995 t

1 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

This letter serves as the documentation of the CNS spiked sample results from the Idaho Falls Spiked Water Sampic #9407-NRC-02.

1.

TRITIUM - decayed to 1-1-92, analyzed by CNS.

Euclide Measured Activity H3 7.50 1 0.08 E-05 Ci/cc 2.

STRONTIUM 89 - decayed to 3-28-94, analyzed by TMA/Norcal.

Nuclide Measured Activity

?

Sr-89 1.11 1 0.32 E-05 pCi/cc 3.

STRONTIUM 90 - decayed to 10-1-92, analyzed by TMA/Norcal.

Nuclide Measured Activity 1

Sr-90 2.06 1 0.21 E-06 pCi/cc 4.

IRON 55 - decayed to 2-1-94, analyzed by *fMA/Norcal.

Nuclide Measured Activity Fe-55 4.83 1 0.48 E-05 pCi/cc 9501170204 950109 PDR ADOCK 05000298 p _.,

PDR l

i

\\

)

t e-P U.F. Nuclear Regulatory Commission January 9, 1995 Page 2_

i Questions or comments regarding the spike sample results shc,ald be directed to Bob Mcdonald, Chemistry Supervisor, at 402/825-5235.

Sincerely, f

.11. Mueller i

Site Manager Cooper Nuclear Station JllM:RJM:JRW cc:

Dr. J. Blair Nicholas Independent Measurements Program Arlington, TX 76011

?

I 5

I l

r

LIST OF NRC COMMITMENTS l ATTACHMENT 3 l Correspondence No: NLS950007 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District.

They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None i

1 l

PROCEDURE NUMBER 0.42 l

REVISION NUMBER 0 l

PAGE 10 0F 16 l

1