Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20196G4021999-06-18018 June 1999 Comment on FRN Re Rev of NRC Enforcement Policy NUREG-1600, Rev 1 & Amend of 10CFR55.49.Concurs with Need to Provide Examples That May Be Used as Guidance in Determining Appropriate Severity Level for Violations as Listed ML20206H1881999-05-0606 May 1999 Exemption from Requirements of 10CFR50,App K Re ECCS Evaluation Models. Commission Grants Licensee Exemption ML20206M5111999-04-30030 April 1999 Comment Supporting Draft RG DG-1083 Re Content of UFSAR IAW 10CFR50.71(e). Recommends That Listed Approach Be Adopted for Changes to Documents Incorporated by Ref CY-99-007, Comment Supporting Proposed Changes to Improve Insp & Assessment Processes for Overseeing Commercial Nuclear Industry That Were Published in Fr on 990122 & in SECY-99-0071999-02-22022 February 1999 Comment Supporting Proposed Changes to Improve Insp & Assessment Processes for Overseeing Commercial Nuclear Industry That Were Published in Fr on 990122 & in SECY-99-007 TXX-9825, Comment Endorsing NEI Comments on Proposed Rulemaking to 10CFR50.65, Requirements for Monitoring Effectiveness at Npps1998-12-14014 December 1998 Comment Endorsing NEI Comments on Proposed Rulemaking to 10CFR50.65, Requirements for Monitoring Effectiveness at Npps ML20154C4101998-09-30030 September 1998 Comment Re Proposed Rule 10CFR50 Re Reporting Requirements for Nuclear Power Reactors.Comanche Peak Electric Station Endorses NEI Comment Ltr & Agrees with NEI Recommendations & Rationale ML20216E1051998-04-0707 April 1998 Comment Supporting Draft RG DG-1029 Titled Guidelines for Evaluating Electromagnetic & Radio-Frequency Interference in Safety-related Instrumentation & Control Sys ML20217H3611998-03-26026 March 1998 Comment Opposing Draft GL 97-XX, Lab Testing of Nuclear Grade Charcoal, Issued on 980225.Advises That There Will Be Addl Implementation Costs ML20198Q4851998-01-16016 January 1998 Comment Opposing PRM 50-63A by P Crane That Requests NRC Amend Regulations Re Emergency Planning to Require Consideration of Sheltering,Evacuation & Prophylactic Use of Potassium Iodide for General Public ML20211A4871997-09-12012 September 1997 Changes Submittal Date of Response to NRC RAI Re Proposed CPSES risk-informed Inservice Testing Program & Comments on NRC Draft PRA Documents ML20149L0311997-07-21021 July 1997 Comment on Draft Guides DG-1048,DG-1049 & DG-1050.Error Identified in Last Line of DG-1050,item 1.3 of Section Value/Impact Statement.Rev 30 Should Be Rev 11 ML20140A4871997-05-27027 May 1997 Comment Opposing Proposed Rule Re Safety Conscious Work Environ.Util Agrees W/Nuclear Energy Inst Comment Ltr ML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20135B7881996-11-29029 November 1996 Order Approving Corporate Restructuring of TU to Facilitate Acquistion of Enserch Corp ML20128M8011996-10-0303 October 1996 Comment Opposing Proposed NRC Generic Communication, Primary Water Stress Corrosion Cracking of Control Rod Drive Mechanism & Other Vessel Head Penetrations ML20097D7321996-02-0909 February 1996 Comment Opposing Petition for Rulemaking PRM-50-63 Re CPSES Request for Amend to Its Regulations Dealing W/Emergency Planning to Include Requirement That Emergency Planning Protective Actions for General Public Include Listed Info ML20094Q6421995-11-28028 November 1995 Comment Supporting Petition for RM PRM-50-62 Re Amend to Regulation Re QAPs Permitting NPP Licensees to Change Quality Program Described in SAR W/O NRC Prior Approval If Changes Do Not Potentially Degrade Safety or Change TSs ML20094H4801995-11-0808 November 1995 Comment Supporting Nuclear Energy Inst Comments on Proposed Rules 10CFR60,72,73 & 75 Re Safeguards for Spent Nuclear Fuel or high-level Radwaste ML20091M6441995-08-25025 August 1995 Comment Opposing Proposed Rule Re Review of Revised NRC SALP Program.Believes That NRC Should Reconsider Need for Ipap or SALP in Light of Redundancy ML20086M7921995-07-0707 July 1995 Comment Supporting Proposed GL Process for Changes to Security Plan Without Prior NRC Approval ML20084A0181995-05-19019 May 1995 Comment Suporting Proposed Rule 10CFR50 Re Containment Leakage Testing.Supports NEI Comments ML20077M7311994-12-30030 December 1994 Comments Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operations for Nuclear Power Reactors ML20077L8711994-12-22022 December 1994 Comment Supporting Proposed Rule 10CFR50,55 & 73 Re Reduction of Reporting Requirements Imposed on NRC Licensees ML20073B6731994-09-19019 September 1994 Affidavit of Cl Terry Re License Amend Request 94-015 ML20073B6951994-09-19019 September 1994 Affidavit of Cl Terry Authorizing Signing & Filing W/Nrc OL Amend Request 94-016 ML20058E0561993-11-10010 November 1993 Comment on Proposed Rule Re Staff Meetings Open to Public. Believes That NRC Has Done Well in Commitment to Provide Public W/Fullest Practical Access to Its Activities ML20056G3351993-08-27027 August 1993 Comment Opposing Proposed Rule 10CFR2 Re Review of 10CFR2.206 Process ML20045D8321993-06-11011 June 1993 Comment Supporting Proposed Rules 10CFR50 & 54, FSAR Update Submittals. ML20044F3271993-05-21021 May 1993 Comments on Draft NRC Insp Procedure 38703, Commercial Grade Procurement Insp, Fr Vol 58,Number 52.NRC Should Use EPRI Definitions for Critical Characteristics ML20056C0831993-03-19019 March 1993 Texas Utils Electric Co Response to Petitioners Motion to Stay Issuance of Full Power License.* Licensee Urges NRC to Reject Petitioners Motion & to Deny Petitioners Appeal of 921215 Order.Motion Should Be Denied.W/Certificate of Svc ML20056C1881993-03-17017 March 1993 Order.* Directs Util to Respond to Motion by COB 930319 & NRC to Respond by COB 930322.W/Certificate of Svc.Served on 930317 ML20128D9651993-02-0303 February 1993 Memorandum & Order.* Stay Request Filed by Petitioners Denied.W/Certificate of Svc.Served on 930203 ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20128D3391993-02-0202 February 1993 Emergency Motion to Stay Issuance of low-power Ol.* Petitioners Specific Requests Listed.W/Certificate of Svc ML20128D4651993-02-0202 February 1993 Texas Utils Electric Co Response to Emergency Motion to Stay Issuance of low-power Ol.* Petitioner Request Should Be Denied Based on Failure to Meet Heavy Burden Imposed on Party.W/Certificate of Svc ML20128D3461993-01-29029 January 1993 NRC Staff Notification of Issuance of OL for Facility.* Low Power License May Be Issued by 930201.W/Certificate of Svc ML20128D6321993-01-29029 January 1993 Memorandum & Order.* Denies Citizens for Fair Util Regulation for Fr Notice Hearing on Proposed Issuance of OL for Facility.W/Certificate of Svc.Served on 930129 ML20127L9321993-01-26026 January 1993 Affidavit of Re Architzel Re Thermo-Lag Installation at Testing for Unit 2.* Statement of Prof Qualifications Encl ML20128D6111993-01-26026 January 1993 Joint Affidavit of I Barnes & Ft Grubelich Re Borg-Warner Check Valves.* Discusses Issues Re Borg-Warner Check Valves Raised by Cfur & Adequacy of Actions Taken by TU Electric ML20127L9181993-01-26026 January 1993 NRC Staff Reply to Cfur Request for Publication of Proposed Action Re Licensing of Unit 2.* Cfur Request That Notice Re Licensing of Unit 2 Be Published Permitting Parties to Request Hearings Should Be Denied ML20127L9661993-01-26026 January 1993 Affidavit of Rl Pettis Re Borg-Warner Check Valves.* Statement of Prof Qualifications & Certificate of Svc Encl ML20127L9091993-01-25025 January 1993 Tx Util Electric Response to Citizens for Fair Util Regulation Request of 930113.* Request Fails to Raise Worthy Issue & Should Be Denied.W/Certificate of Svc ML20127L8891993-01-21021 January 1993 Order.* License Should File Response to Citizens for Fair Util Regulation Ltr Requesting That Commission Issue Fr Notice Providing for Opportunity for Hearing Re Issuance of OL by 930125.W/Certificate of Svc.Served on 930122 ML20127G9191993-01-19019 January 1993 Order.* Grants Petitioners Extension of Time Until 930122 to File Brief.Replies to Petitioners Brief Shall Be Filed on or Before 930208.W/Certificate of Svc.Served on 930119 ML20127G9441993-01-19019 January 1993 TU Electric Brief in Opposition to Petitioners Appeal of ASLB Memorandum & Order.* Requests That Petitioners Appeal Be Denied & Licensing Board 921215 Memorandum & Order Be Affirmed.W/Certificate of Svc ML20127G8041993-01-15015 January 1993 NRC Staff Response to Appeal of Licensing Board Decision Denying Petition for Leave to Intervene & Request for Hearing Filed by Bi & Di Orr.* Board 921215 Decision Should Be Upheld.Certificate of Svc Encl ML20127G7451993-01-14014 January 1993 NRC Staff Response to Motion of Petitioners RM Dow & SL Dow, (Disposable Workers of Comanche Peak Steam Electric Station),For Leave to File Out of Time & Request for Extension of Time to File Brief.* W/Certificate of Svc ML20127G7941993-01-12012 January 1993 Opposition of TU Electric to Motion for Leave to File Out of Time & Request for Extension of Time to File Brief by SL Dow (Disposable Workers of Comanche Peak Steam Electric Station) & RM Dow.* W/Certificate of Svc ML20127A5931993-01-0808 January 1993 Brief in Support of Petitioner Notice of Appeal.Aslb Erred by Not Admitting Petitioner Contention & Action Should Be Reversed.W/Certificate of Svc ML20127A6371993-01-0707 January 1993 Notice of Appeal.* Appeal Submitted Due to 921215 Memo Denying Petitioner Motion for Rehearing & Petition for Intervention & Request for Hearings.Proceedings Were Terminated by Aslb.W/Certificate of Svc 1999-06-18
[Table view] Category:TRANSCRIPTS
MONTHYEARML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20066B5631989-10-27027 October 1989 Transcript of 891027 Investigative Interview of Bp Garde in Arlington,Tx.Pp 1-91 ML20066B5351989-10-23023 October 1989 Transcript of 891023 Investigative Interview of Tl Austin in Houston,Tx.Pp 1-45.Related Info Encl ML20151B3591988-07-13013 July 1988 Transcript of 880713 Hearing in Dallas,Tx.Pp 25.187-25,295 ML20154R3061988-06-0101 June 1988 Transcript of 880601 Prehearing Conference in Dallas,Tx. Pp 25,157-25,186 ML20151B5821988-02-25025 February 1988 Transcript of 880225-26 Public Meetings W/Case & J Doyle ML20238C3921987-12-0909 December 1987 Transcript of 871209 Public Meeting in Dallas,Tx Re Status of Corrective Action Programs at Facility.Pp 1-60 ML20236J3981987-11-0303 November 1987 Transcript of 871103 Prehearing in Dallas,Tx.Pp 25,139- 25,156 ML20245D1231987-11-0202 November 1987 Transcript of 871102 Special Prehearing Conference in Dallas,Tx.Pp 24,963-25,138 ML20149E5411987-10-16016 October 1987 Transcript of Jf Streeter 871016 Deposition in Dallas,Tx Re Facility.Pp 1-95 ML20149E5451987-10-16016 October 1987 Transcript of T Tyler 871016 Deposition in Dallas,Tx Re Facility.Pp 1-51 ML20149E5301987-10-15015 October 1987 Transcript of JW Beck 871015 Deposition in Dallas,Tx Re Facility.Pp 1-56 ML20149E5231987-10-15015 October 1987 Transcript of Wg Counsil 871015 Deposition in Dallas,Tx Re Facility.Pp 1-86 ML20149E5061987-10-15015 October 1987 Transcript of J Hansel 871015 Deposition in Dallas,Tx Re Facility,Vol Ii.Pp 1-54 ML20149E4191987-10-14014 October 1987 Transcript of J Hansel 871014 Deposition in Dallas,Tx Re Facility,Vol I.Pp 1-125 ML20238A6921987-09-0303 September 1987 Partially Withheld Rept of Interview W/R Spangler Re Allegations Concerning QA Audit Group ML20238A7201987-09-0303 September 1987 Partially Withheld Rept of Interview W/Gs Keeley Re Clarification of Info Contained in 831019 Rept Prepared by R Spangler Re Alleged Intimidation of QA Audit Group by Util QC Site Manager.Related Info Encl ML20237G2781987-07-30030 July 1987 Vol II of Transcript of 870730 Public Meeting W/Util.Pp 2- 87.Supporting Documentation Encl ML20237G2721987-07-29029 July 1987 Vol I of Transcript of 870729 Public Meeting W/Util.Pp 2- 129.Supporting Matl Encl ML20235T7021987-07-20020 July 1987 Transcript of 870720 Telcon in Washington,Dc.Pp 24,892- 24,962 ML20237L0731987-04-0909 April 1987 Partially Deleted Transcript of Unnamed Region IV Official 870409 Interview Re Region IV Mgt Handling of Two Insp Repts of Plant ML20214J9581987-04-0707 April 1987 Transcript of 870407 Meeting in Dallas,Tx.Pp 1-85 ML20209E5821987-04-0202 April 1987 Transcript of 870402 Meeting in Bethesda,Md Re Comanche Peak Response Team Program.Pp 1-101.Supporting Documentation Encl ML20212Q7331987-01-29029 January 1987 Transcript of 870129 Hearing in Bethesda,Md.Pp 1-82 ML20155F8161987-01-0707 January 1987 Transcript of 870107 Nrc/Comanche Peak Steam Electric Station Mgt Meeting in Glen Rose,Tx.Viewgraphs Encl. Pp 1-100 ML20215E0031986-12-15015 December 1986 Transcript of 861215 Prehearing Conference in Bethesda,Md Re Facility.Pp 24,676-24,826 ML20210B3271986-09-10010 September 1986 Transcript of 860910 Hearing in Chicago,Il.Pp 12,338-12,563 ML20214L0401986-08-19019 August 1986 Transcript of 860819 Hearing in Dallas,Tx Re Comanche Peak. Pp 24,600-24,675 ML20214L0301986-08-18018 August 1986 Transcript of 860818 Hearing in Dallas,Tx.Pp 24,423-24,600. Supporting Documentation Encl ML20237L3691986-07-25025 July 1986 Partially Deleted Transcript of I Barnes 860725 Investigative Interview in Arlington,Tx Re Insps at Plant & Region IV Regulation of Facility.Pp 1-75.Supporting Documentation Encl ML20238A3271986-07-24024 July 1986 Partially Deleted Transcript of W Warren 860724 Sworn Statement in Glen Rose,Tx Re Activities Involving Phillips at Plant ML20237L7051986-07-24024 July 1986 Transcript of Le Ellershaw 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps of Plant & Region IV Regulation of Facility.Pp 1-16 ML20237L4311986-07-24024 July 1986 Transcript of C Hale 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps at Plant & Region IV Regulation of Facility.Pp 1-84 ML20238A8021986-07-23023 July 1986 Partially Deleted Transcript of T Westerman 860723 Sworn Statement in Arlington,Tx Re Insp Repts 85-14 & 85-11 & Draft 2-A in Phillips Matrix.Pp 514-707.Supporting Documentation Encl ML20237L3581986-07-23023 July 1986 Partially Deleted Transcript of J Gagliardo 860723 Sworn Statement in Arlington,Tx Re Activities of Senior Resident Inspector for Const at Plant.Pp 1-31 ML20238B8101986-07-22022 July 1986 Partially Deleted Transcript of B Taylor 870722 Investigative Interview in Arlington,Tx Re Region IV Insp Program at Plant.Pp 1-31.Supporting Documentation Encl ML20237L5541986-07-22022 July 1986 Marked-up Transcript of E Johnson 860722 Investigative Interview in Arlington,Tx Re Mgt at Plant.Pp 1-138.Partially Deleted Addendum Encl ML20237L6161986-07-17017 July 1986 Transcript of Ef Fox 860717 Investigative Interview in Bethesda,Md Re Insp at Plant.Pp 1-16 ML20237L4091986-07-17017 July 1986 Transcript of J Gilray 860717 Investigative Interview in Bethesda,Md Re Conversations W/Westerman Re Plant.Pp 1-9 ML20238A5421986-07-11011 July 1986 Transcript of T Westerman 860711 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 257-411.Partially Deleted Supporting Documentation Encl ML20238A5311986-07-10010 July 1986 Transcript of T Westerman 860710 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 1-254 ML20238A0331986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1241986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1101986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A2961986-06-26026 June 1986 Transcript of Mk Graham 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-10 ML20238A3221986-06-26026 June 1986 Transcript of Jl Birmingham Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-29 ML20238A1731986-06-26026 June 1986 Transcript of Dl Jew Investigative Interview in Grandbury, Tx Re Region IV Regulation of Plant.Pp 1-14.Related Info Encl ML20238A2511986-06-26026 June 1986 Transcript of Jr Dale 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-25 ML20238A1961986-06-26026 June 1986 Transcript of AL Maughan 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-15. Related Info Encl 1996-12-05
[Table view] Category:DEPOSITIONS
MONTHYEARML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20066B5631989-10-27027 October 1989 Transcript of 891027 Investigative Interview of Bp Garde in Arlington,Tx.Pp 1-91 ML20066B5351989-10-23023 October 1989 Transcript of 891023 Investigative Interview of Tl Austin in Houston,Tx.Pp 1-45.Related Info Encl ML20151B3591988-07-13013 July 1988 Transcript of 880713 Hearing in Dallas,Tx.Pp 25.187-25,295 ML20154R3061988-06-0101 June 1988 Transcript of 880601 Prehearing Conference in Dallas,Tx. Pp 25,157-25,186 ML20151B5821988-02-25025 February 1988 Transcript of 880225-26 Public Meetings W/Case & J Doyle ML20238C3921987-12-0909 December 1987 Transcript of 871209 Public Meeting in Dallas,Tx Re Status of Corrective Action Programs at Facility.Pp 1-60 ML20236J3981987-11-0303 November 1987 Transcript of 871103 Prehearing in Dallas,Tx.Pp 25,139- 25,156 ML20245D1231987-11-0202 November 1987 Transcript of 871102 Special Prehearing Conference in Dallas,Tx.Pp 24,963-25,138 ML20149E5411987-10-16016 October 1987 Transcript of Jf Streeter 871016 Deposition in Dallas,Tx Re Facility.Pp 1-95 ML20149E5451987-10-16016 October 1987 Transcript of T Tyler 871016 Deposition in Dallas,Tx Re Facility.Pp 1-51 ML20149E5301987-10-15015 October 1987 Transcript of JW Beck 871015 Deposition in Dallas,Tx Re Facility.Pp 1-56 ML20149E5231987-10-15015 October 1987 Transcript of Wg Counsil 871015 Deposition in Dallas,Tx Re Facility.Pp 1-86 ML20149E5061987-10-15015 October 1987 Transcript of J Hansel 871015 Deposition in Dallas,Tx Re Facility,Vol Ii.Pp 1-54 ML20149E4191987-10-14014 October 1987 Transcript of J Hansel 871014 Deposition in Dallas,Tx Re Facility,Vol I.Pp 1-125 ML20238A6921987-09-0303 September 1987 Partially Withheld Rept of Interview W/R Spangler Re Allegations Concerning QA Audit Group ML20238A7201987-09-0303 September 1987 Partially Withheld Rept of Interview W/Gs Keeley Re Clarification of Info Contained in 831019 Rept Prepared by R Spangler Re Alleged Intimidation of QA Audit Group by Util QC Site Manager.Related Info Encl ML20237G2781987-07-30030 July 1987 Vol II of Transcript of 870730 Public Meeting W/Util.Pp 2- 87.Supporting Documentation Encl ML20237G2721987-07-29029 July 1987 Vol I of Transcript of 870729 Public Meeting W/Util.Pp 2- 129.Supporting Matl Encl ML20235T7021987-07-20020 July 1987 Transcript of 870720 Telcon in Washington,Dc.Pp 24,892- 24,962 ML20237L0731987-04-0909 April 1987 Partially Deleted Transcript of Unnamed Region IV Official 870409 Interview Re Region IV Mgt Handling of Two Insp Repts of Plant ML20214J9581987-04-0707 April 1987 Transcript of 870407 Meeting in Dallas,Tx.Pp 1-85 ML20209E5821987-04-0202 April 1987 Transcript of 870402 Meeting in Bethesda,Md Re Comanche Peak Response Team Program.Pp 1-101.Supporting Documentation Encl ML20212Q7331987-01-29029 January 1987 Transcript of 870129 Hearing in Bethesda,Md.Pp 1-82 ML20155F8161987-01-0707 January 1987 Transcript of 870107 Nrc/Comanche Peak Steam Electric Station Mgt Meeting in Glen Rose,Tx.Viewgraphs Encl. Pp 1-100 ML20215E0031986-12-15015 December 1986 Transcript of 861215 Prehearing Conference in Bethesda,Md Re Facility.Pp 24,676-24,826 ML20210B3271986-09-10010 September 1986 Transcript of 860910 Hearing in Chicago,Il.Pp 12,338-12,563 ML20214L0401986-08-19019 August 1986 Transcript of 860819 Hearing in Dallas,Tx Re Comanche Peak. Pp 24,600-24,675 ML20214L0301986-08-18018 August 1986 Transcript of 860818 Hearing in Dallas,Tx.Pp 24,423-24,600. Supporting Documentation Encl ML20237L3691986-07-25025 July 1986 Partially Deleted Transcript of I Barnes 860725 Investigative Interview in Arlington,Tx Re Insps at Plant & Region IV Regulation of Facility.Pp 1-75.Supporting Documentation Encl ML20238A3271986-07-24024 July 1986 Partially Deleted Transcript of W Warren 860724 Sworn Statement in Glen Rose,Tx Re Activities Involving Phillips at Plant ML20237L7051986-07-24024 July 1986 Transcript of Le Ellershaw 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps of Plant & Region IV Regulation of Facility.Pp 1-16 ML20237L4311986-07-24024 July 1986 Transcript of C Hale 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps at Plant & Region IV Regulation of Facility.Pp 1-84 ML20238A8021986-07-23023 July 1986 Partially Deleted Transcript of T Westerman 860723 Sworn Statement in Arlington,Tx Re Insp Repts 85-14 & 85-11 & Draft 2-A in Phillips Matrix.Pp 514-707.Supporting Documentation Encl ML20237L3581986-07-23023 July 1986 Partially Deleted Transcript of J Gagliardo 860723 Sworn Statement in Arlington,Tx Re Activities of Senior Resident Inspector for Const at Plant.Pp 1-31 ML20238B8101986-07-22022 July 1986 Partially Deleted Transcript of B Taylor 870722 Investigative Interview in Arlington,Tx Re Region IV Insp Program at Plant.Pp 1-31.Supporting Documentation Encl ML20237L5541986-07-22022 July 1986 Marked-up Transcript of E Johnson 860722 Investigative Interview in Arlington,Tx Re Mgt at Plant.Pp 1-138.Partially Deleted Addendum Encl ML20237L6161986-07-17017 July 1986 Transcript of Ef Fox 860717 Investigative Interview in Bethesda,Md Re Insp at Plant.Pp 1-16 ML20237L4091986-07-17017 July 1986 Transcript of J Gilray 860717 Investigative Interview in Bethesda,Md Re Conversations W/Westerman Re Plant.Pp 1-9 ML20238A5421986-07-11011 July 1986 Transcript of T Westerman 860711 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 257-411.Partially Deleted Supporting Documentation Encl ML20238A5311986-07-10010 July 1986 Transcript of T Westerman 860710 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 1-254 ML20238A0331986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1241986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1101986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A2961986-06-26026 June 1986 Transcript of Mk Graham 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-10 ML20238A3221986-06-26026 June 1986 Transcript of Jl Birmingham Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-29 ML20238A1731986-06-26026 June 1986 Transcript of Dl Jew Investigative Interview in Grandbury, Tx Re Region IV Regulation of Plant.Pp 1-14.Related Info Encl ML20238A2511986-06-26026 June 1986 Transcript of Jr Dale 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-25 ML20238A1961986-06-26026 June 1986 Transcript of AL Maughan 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-15. Related Info Encl 1996-12-05
[Table view] Category:NARRATIVE TESTIMONY
MONTHYEARML20133G5411996-12-0505 December 1996 Transcript of 961205 Meeting in Arlington,Tx Re Comanche Peak Thermo-Lag Fire Barriers. Pp 1-111 ML20128F6221993-02-0303 February 1993 Transcript of 930203 Affirmation/Discussion & Vote Public Meeting in Rockville,Md.Pp 1-2.Related Info Encl ML20066B5631989-10-27027 October 1989 Transcript of 891027 Investigative Interview of Bp Garde in Arlington,Tx.Pp 1-91 ML20066B5351989-10-23023 October 1989 Transcript of 891023 Investigative Interview of Tl Austin in Houston,Tx.Pp 1-45.Related Info Encl ML20151B3591988-07-13013 July 1988 Transcript of 880713 Hearing in Dallas,Tx.Pp 25.187-25,295 ML20154R3061988-06-0101 June 1988 Transcript of 880601 Prehearing Conference in Dallas,Tx. Pp 25,157-25,186 ML20151B5821988-02-25025 February 1988 Transcript of 880225-26 Public Meetings W/Case & J Doyle ML20238C3921987-12-0909 December 1987 Transcript of 871209 Public Meeting in Dallas,Tx Re Status of Corrective Action Programs at Facility.Pp 1-60 ML20236J3981987-11-0303 November 1987 Transcript of 871103 Prehearing in Dallas,Tx.Pp 25,139- 25,156 ML20245D1231987-11-0202 November 1987 Transcript of 871102 Special Prehearing Conference in Dallas,Tx.Pp 24,963-25,138 ML20149E5411987-10-16016 October 1987 Transcript of Jf Streeter 871016 Deposition in Dallas,Tx Re Facility.Pp 1-95 ML20149E5451987-10-16016 October 1987 Transcript of T Tyler 871016 Deposition in Dallas,Tx Re Facility.Pp 1-51 ML20149E5301987-10-15015 October 1987 Transcript of JW Beck 871015 Deposition in Dallas,Tx Re Facility.Pp 1-56 ML20149E5231987-10-15015 October 1987 Transcript of Wg Counsil 871015 Deposition in Dallas,Tx Re Facility.Pp 1-86 ML20149E5061987-10-15015 October 1987 Transcript of J Hansel 871015 Deposition in Dallas,Tx Re Facility,Vol Ii.Pp 1-54 ML20149E4191987-10-14014 October 1987 Transcript of J Hansel 871014 Deposition in Dallas,Tx Re Facility,Vol I.Pp 1-125 ML20238A6921987-09-0303 September 1987 Partially Withheld Rept of Interview W/R Spangler Re Allegations Concerning QA Audit Group ML20238A7201987-09-0303 September 1987 Partially Withheld Rept of Interview W/Gs Keeley Re Clarification of Info Contained in 831019 Rept Prepared by R Spangler Re Alleged Intimidation of QA Audit Group by Util QC Site Manager.Related Info Encl ML20237G2781987-07-30030 July 1987 Vol II of Transcript of 870730 Public Meeting W/Util.Pp 2- 87.Supporting Documentation Encl ML20237G2721987-07-29029 July 1987 Vol I of Transcript of 870729 Public Meeting W/Util.Pp 2- 129.Supporting Matl Encl ML20235T7021987-07-20020 July 1987 Transcript of 870720 Telcon in Washington,Dc.Pp 24,892- 24,962 ML20237L0731987-04-0909 April 1987 Partially Deleted Transcript of Unnamed Region IV Official 870409 Interview Re Region IV Mgt Handling of Two Insp Repts of Plant ML20214J9581987-04-0707 April 1987 Transcript of 870407 Meeting in Dallas,Tx.Pp 1-85 ML20209E5821987-04-0202 April 1987 Transcript of 870402 Meeting in Bethesda,Md Re Comanche Peak Response Team Program.Pp 1-101.Supporting Documentation Encl ML20212Q7331987-01-29029 January 1987 Transcript of 870129 Hearing in Bethesda,Md.Pp 1-82 ML20155F8161987-01-0707 January 1987 Transcript of 870107 Nrc/Comanche Peak Steam Electric Station Mgt Meeting in Glen Rose,Tx.Viewgraphs Encl. Pp 1-100 ML20215E0031986-12-15015 December 1986 Transcript of 861215 Prehearing Conference in Bethesda,Md Re Facility.Pp 24,676-24,826 ML20210B3271986-09-10010 September 1986 Transcript of 860910 Hearing in Chicago,Il.Pp 12,338-12,563 ML20214L0401986-08-19019 August 1986 Transcript of 860819 Hearing in Dallas,Tx Re Comanche Peak. Pp 24,600-24,675 ML20214L0301986-08-18018 August 1986 Transcript of 860818 Hearing in Dallas,Tx.Pp 24,423-24,600. Supporting Documentation Encl ML20237L3691986-07-25025 July 1986 Partially Deleted Transcript of I Barnes 860725 Investigative Interview in Arlington,Tx Re Insps at Plant & Region IV Regulation of Facility.Pp 1-75.Supporting Documentation Encl ML20238A3271986-07-24024 July 1986 Partially Deleted Transcript of W Warren 860724 Sworn Statement in Glen Rose,Tx Re Activities Involving Phillips at Plant ML20237L7051986-07-24024 July 1986 Transcript of Le Ellershaw 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps of Plant & Region IV Regulation of Facility.Pp 1-16 ML20237L4311986-07-24024 July 1986 Transcript of C Hale 860724 Investigative Interview in Glen Rose,Tx Re NRC Insps at Plant & Region IV Regulation of Facility.Pp 1-84 ML20238A8021986-07-23023 July 1986 Partially Deleted Transcript of T Westerman 860723 Sworn Statement in Arlington,Tx Re Insp Repts 85-14 & 85-11 & Draft 2-A in Phillips Matrix.Pp 514-707.Supporting Documentation Encl ML20237L3581986-07-23023 July 1986 Partially Deleted Transcript of J Gagliardo 860723 Sworn Statement in Arlington,Tx Re Activities of Senior Resident Inspector for Const at Plant.Pp 1-31 ML20238B8101986-07-22022 July 1986 Partially Deleted Transcript of B Taylor 870722 Investigative Interview in Arlington,Tx Re Region IV Insp Program at Plant.Pp 1-31.Supporting Documentation Encl ML20237L5541986-07-22022 July 1986 Marked-up Transcript of E Johnson 860722 Investigative Interview in Arlington,Tx Re Mgt at Plant.Pp 1-138.Partially Deleted Addendum Encl ML20237L6161986-07-17017 July 1986 Transcript of Ef Fox 860717 Investigative Interview in Bethesda,Md Re Insp at Plant.Pp 1-16 ML20237L4091986-07-17017 July 1986 Transcript of J Gilray 860717 Investigative Interview in Bethesda,Md Re Conversations W/Westerman Re Plant.Pp 1-9 ML20238A5421986-07-11011 July 1986 Transcript of T Westerman 860711 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 257-411.Partially Deleted Supporting Documentation Encl ML20238A5311986-07-10010 July 1986 Transcript of T Westerman 860710 Investigative Interview in Arlington,Tx Re Region IV Mgt of Plant.Pp 1-254 ML20238A0331986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1241986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A1101986-07-0909 July 1986 Partially Deleted Transcript of Unnamed Region IV Official 860709 Sworn Statement in Arlington,Tx Re Region IV Mgt of Plant ML20238A2961986-06-26026 June 1986 Transcript of Mk Graham 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-10 ML20238A3221986-06-26026 June 1986 Transcript of Jl Birmingham Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-29 ML20238A1731986-06-26026 June 1986 Transcript of Dl Jew Investigative Interview in Grandbury, Tx Re Region IV Regulation of Plant.Pp 1-14.Related Info Encl ML20238A2511986-06-26026 June 1986 Transcript of Jr Dale 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-25 ML20238A1961986-06-26026 June 1986 Transcript of AL Maughan 860626 Investigative Interview in Grandbury,Tx Re Region IV Regulation of Plant.Pp 1-15. Related Info Encl 1996-12-05
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
I l
UNITED STATES OF AMERICA -
l NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC' SAFETY AND LICENSING BOARD t
In the Matter of APPLICATION OF TEXAS UTILITIES I l GENERATING COMPANY, ET AL. FOR I Docket Nos. 50-445 l I and 50-446 AN OPERATING LICENSE FOR COMANCHE PEAK STEAM ELECTRIC I STATION UNITS #1 AND #2 I (CPSES)
TESTIMONY OF CASE WITNESS f JACK D0YLE i
1 Q: Mr. Doyle, have you read the CYGNA Report?
2 A: Yes, I have.
3 What is your opinion of this document?
Q:
4 A: I have several objections to this document:
5 (1) It represents one of the simpler areas in' the plant containing 6
pipes and pipe supports, which is all that I am addressing 7 in this testimony; 8 (2) It is not an independent assessment of the systems being 9 reviewed; 10 (3) The section devoted to the pipe support criteria lacks a -
11 number of criteria which are critical to any assesscent of 12 supports; i
13 (4) The document lacks the information required for a proper 14 assessment of its; accuracy; 15 (5) The bare minimum of information contained in this document 16 is still sufficient to lead an independent reviewer to come
(
'l 8402100072 840207 '
{DRADOCM 05000445 PDR
_ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - - - - _ _ _ _ _ _ _ __J
1 to conclusions which are not reflected by this doctanent.
2 In fact, the conclusions by CYGNA are the opposite of those 3 which should have been assessed.
4 Q: Taking these itans in order, what do you mean by "one of the simpler 5 areas"?
6 A: To start with, the basic area is not cluttered as is the case 7 at, say, azimuth 270 on elevation 808. Beyond that, the individual supports 8 are basically one=way supports as opposed to the more complex frames used 9 as one , two , three , and even six-way restraints. There is practically 10 no friction conisderation for these supports. This may be noted from the 11 fact that of the 91 supports covered in the walk-down section of the report, 12 more than half are springs or snubbers. Of the remaining 43 or so, many are 13 struts. Therefore, this sample covers a far simpler segment than is the 14 norm for the plant. Beyond this, there were, to the best of my knowledge, 15 no A307 bolt problems, no instability problems, no local diaphram problems, 16 no cinched-up U-bolt problems, etc., present because of the nature of the 17 supports. Also, this area was a showcase area used to prove that the iterative 18 process was without problem.
19 Q: You say this is not an independent review. How do you arrive at 20 this conclusion?
21 A: Many factors lead to this conclusion. One example may be found in 22 . note No.1, attachment to PS-01, Appendix H, Pipe Support Check List. The 23 note effectively concurs with the vendors,the utility and Region IV NRC that 24 the stress contribution caused by the effects of seismic . events on the structure 25 comprising the support is negligible. I don't recall anyone on either. side
1 of the question claiming that the self-weight excitation segment of cont'ri-2 bution was a major contributor to the stress of the support. All I have 3 ever stated is that this loading elenent was one of the cumulative contri-4 butors which must be considered. So long as the engineer is permitted to 5 design structures to the limits of the code allowables, the deletion of any
, 6 customarily included stress contributor on the basis that, by itself, it 7 induces a stress that is minor, is irrational. This premise is true because 8 the closer the design stress is to the code allowable, the more critical 9 minor contributors become. CYGNA is relying on item 3h of the SIT Report 10 #50-445/82-26 and 50-446/82-14 as if it were the position of the Nuclear 11 Regulatory Commission, rather than only one side of an argument which has 12 yet to be adjudicated. Beyond this, the code is specific as to what "shall" 13 be included in the design of supports. And this includes seismic for the 14 support dead load. See NF 3111(e) and NF 3112.2 of ASME Section III, also 15 NB, NC, and ND 3622.2, and 10 CFR Part 50, Appendix A, Criterion 2.
16 A second feature of this non-independent posture may be found in note 17 2 of the same source as note 1. In this case, CYGNA has not only deviated 18 from fundamentals, they are deviating from their own criteria. See Appendix 19 E " Pipe Support Design Review Criteria," page 4 of 11, 4.1.1. Stiffness, and 20 page 1, Exhibit 4.1-1. CYGNA, which by its own admission, not only did not f 21 review the NRC conclusions in regard to the generic stiffness study, but the i
22 review report was not even available at the time of their review. Therefore, 23 a rational man may only conclude that CYGNA deviated from their own criteria 24 as a result of rumors that variations in the loads due to alterations in the l 25 suppcrt stiffness are negligible.
8
1 Having had access to this generic stiffness study, it is obvious that 2 200% increases in loads and in one case a 600% + change can hardly qualify 3 as negligible. Beyond this, the generic stiffness study did not include 4 all of the contributors to stiffness degradation such as effects of bolts, 5 hardware including U-bolts, local flexibilities, etc. It is obvious that 6 if the actual stiffness values from node point to hard point were used, the 7 increase in loads on the supports would fall somewhere between severe and 8 catastrophic. To inspect the supports as CYGNA did without reference to 9 stiffness because someone told them it was no problem t totally irrational 10 and indicates a total lack of independence. An independent assessment would 11 have, as a minimum, proceeded with the-inspection to the criteria established 12 and as a caveat left the optimistic input for stiffness in the pipe stress 13 analysis as an open item pending the decision of the Board, which after 14 all in this instance will make the ruling.
15 A third factor which might lead some to believe that CYGNA was either .
16 "somewhat knowledgeable" or not independent involves the problem of zero 17 inch gap on support No. SF-X-033-007; see WD03-01, Appendix F, " Observation 18 Record," 2.0 " Resolution." CYGNA identified a problem wherein a minimum 19 1/2" clearance required in the unrestrained direction was vielated. Their 20 solution to the problem was to ask for an explanation from the utility.
21 Mr. Finneran explained that this problem was noted by CPSES and was recorded 22 on as-built reverification form 1267. Engineering solved this problem by 23 " accept as is," on 4/20/83. !
24 Not only did this suffice to close out this item as far as CYGNA is 1
25 concerned, but they had to extend the following " independent" observation:
5-I "This documentation indicates that the Comanche Peak as-built verification 2 is working effectively."
3 The problem, however, still exists. Nothing was accomplished which 4 would resolve the situation which obviously escaped detection by CPSES and 5 CYGNA. The purpose of the large gap requirement in the unrestrained direction 6 is to allow the pipe to _ move without restraint due to thennal expansion 7 or seismic event. Since seismic is either way or either direction, I will 8 only address this occurrence. If the pipe is free to move (unrestrainad),
9 it will deflect first one way and then the other a number of times dependent 10 on the zero crossings for the specific event. In this case, however, it 11 is restrained in one direction. This restraint will therefore react a force 12 in lieu of displacement. In short, this is no longer a one-way restraint, l
13 but is now a two-way restraint. Additionally, since it is free in one un-14 restrained direction, the load is not simply the constraining effort in 16 one direction but now shock is present. Since this problem has been written 16 off, the magnitude of the shock load is unknowr., but still will contribute 17 to the stress in the supports which, as a result.of a lack 'of one element j 18 inducing stress, is also unknown. .
19 The issuance of "use-as-is" does not necessarily eliminate problems, l
20 but as shown above may merely be burying them.
21 A fourth area of concern involves the checkingsof calculations. See 22 Appendix H, " Pipe Support Check List," sheet 1 of'4, PS-14, support No.
23 SI-1-073-0700-S32R. The reviewer made the following coment at item 1, 24 Coments, No. 3: "The design calculation includes a pipe bearing stress 25 calculation although this is not required for general pipe design." (Emphasis 4
l
6-I added.) This reviewer would do well to look at the ASME Code,Section III, 2 Sub-Sections, NB, NC, and ND 3645 which states: " Attachments" which require l 3 the design of external attachments to pipe in a way that will avoid a flattening l
4 of the pipe, excessive localized bending stresses or harmful gradients in 5 the pipe wall.
6 A fifth example of non-independent disposition of problems involves ,
7 support No.- SF-X-003-003-F43K, a snubber which passes close to the clamp {
1 8 of another snubber, No. SF-X-007-014-F43K; see WD02-01, Appendix F, Observation 9 Record. In this case, the minimum clearance between the snubber (extension) 10 and the clamp is 1/4". This is not during plant operation nor utilization 11 of the spent fuel pool; therefore, we must assune the pipes are at plant l l 12 ambient. l 13 While I lack sufficient information to pursue this problem, I find that 14 the maximum relative seismic movemer.t between these two points is only .0009 1.5 according to Texas Utilities. I have, by calculation.on a number of snubbers 16 and struts, found the displacement of the hardware itself to be beyond thi:
17 value. For example, for a 2" diameter standard pipe 4' long and simply sup-18 ported at each end, subjected to a 1 G seismic load, horizontal and per-19 pendicular to the axis of the pipe, the seismic displacement would be Sw1 4/384EI 20 where w = .304 lbs. per inch,1 = 48 inches, E = 29,000,000, and I = .666 in. .
21 or 5 X .304 X 48 4 384EI = .0011 in. , which is 20% more than the total dif-22 ferential indicated by Texas Utilities. If the pipe were in a horizontal 23 plane, and were twice as long, and subjected to 1 G vertical, the deflection 24 would be .035 and 'the stress in the pipe would be 10% of the' allowable, and 25 this from dead load and seismic only. And this is without considering the -
fN****='-w****=*= ,MW*-a
]= =_=]*] _
__=e_g_=-_ -=~~=='=y , - ***---*-i-/m- -==*=-m -s: ee- =-we- *==$r*-= m---~^
1 pipe node poiat movement or the differential movement of two run pipes which 2 may be seismically out of phase. Also, I must point out that after years 3 of operational cycling, the node point will not maintain the as-constructed 4 loca tion.
5 Beyond this, it is amusing to note that the following note appears on 6 the page: "
Texas Utilities has determined that the maximum relative move-7 ment at these two points are as follows:" This would hardly seem to be an i 8 independent assessment, when CYGNA finds a problem but Texas Utilities writes 9 it off.
10 Q: What do you mean by "the section devoted to design criteria lacks il a number of criteria"?
2 A: We must assume tnat the criteria was outlined prior to the review
- 3 and therefore the review team was unaware of the support configuration with 16 which they would be involved. If this was the case, the criteria must contain 15 a sufficient check list to review whatever type of support exists and flag 16 the items to be checked. In this case, the reviewer should be looking for 17 the following, which were not included in his check list except in such 18 broad terms that from the review it is not possible to decipher what features 9 were reviewed.
20 a. Ins tabili ty; 21 b. Approved hardware (with load data sheets);
22 c. Prying action; 23 d. Summation of torsional effects to nonnal stress; 24 e. Local diaphram action; 25 f. Worst-case, additive signs for load input; 1
I l
.w, agw .c .a4-,w.,+n y av s *v'wv '"w-== " "*"-
1 g. Massive hardware and structure included in calculations; 2 h. Weld transition for tubes (Beta angle);
3 1. Shear distribution for bolts in bearing; 4 j. Loads induced into piping; 5 k. Constraint to thermal growth of pipe; 6 1. Minimum weld and single pass requirements; 7 m. Thennal constraint of supports (wall-to-wall, etc.);
8 n. A-307 bolts used in fricidon connections; 9 o. Stress ratio based on sum of contributors; 10 p. Web crippling; jj q. Shear lag (wide flanges loaded on single flange);
12 r. Flange rotation (wide flanges);
13 s. Web bending (wide flanges, channels, etc.);
14 t. Use of principal axis for unsemetrical bending; i 15 u. Loading off shear center; 16 v. Bending allowable reductions for unbraced length; 17 w. Bending allowable reduction when compression ratio in bending 18 members exceeds stress ratio of .15; jg x. Differential spring rates (double struts of unequal length 20 reacting single' load, for example);
! 21 y. Friction or displacement equivalent load for all supports;-
l l 22 z. Effective length of intennittent welds; 23 aa. Support resisting. seismic movement or dead load of buildings; I
24 bb. Check for loading induced by supports which must be picked l
25 up by other up or down stream supports'.
l .
9- .
1 There are other features which require checking; however, this should 2 suffice to indicate the failure of the CYGNA check lists to adequately address i 3 the review as required.
4 Q: What do you mean by "the document lacks the information required 5 for a proper assessment of its accuracy"?
6 A: For example, among the items not included:
7 a. The stress ratio; 8 b. The configuration of the support; and 9 c. The loads and deflection.
10 The report is written as if the infallibility of the reviewer was un-11 contested end only those observations made by the reviewer are open to question.
12 There is really no way for one reading the report to assess the value of 13 the exercise except to analyze the write-off procedures utilized by the 14 reviewer.
15 Q: What do you mean bv "in fact the conclusions by CYGNA are the 16 opposite of those which should have been assessed"?
! 17 A: Before getting into specifics, it is well to note two statements 18 made by CYGNA in Section 4 of their report. First, on page 4-10, 4.3.2.
19 " Pipe Supports Review," last paragraph: "In general the supports calculations 20 are well done." The second statement appears on 4-17 and 4-18 " Mechanical 21 Walkdown (Piping and Supports)":"The purpose of the walkdown was to verify 22 the as-built location of pertinent features of the piping system such as 23 valves, branch connections, elbows and supports and to verify the as-built t 24 condition of the supports." (Emphasis added.)
25 "Except in the few places where any form of measurement (either accurate i
I
. _ - --. - - - :. s -
4 l
) 1 or approximate) was not possible the- lodation of all piping elements was i 2 verified to be in conformarme with the relevant drawings." It is these two i
! 3 statements that I find I must challenge.
i
} 4 In reference to the first statement, the first paint of consequence 5 is to keep in mind that only 31 calculations were reviewed, and these as l,
l 6 '
q were stated above were among the simplest at CPSES.
! 7 Among those items noted by the reviewer in Appendix H that were written j 8 off are the following which also include drawing errors in addition to calcu-9 lational errors:
10 a. PS-02 Super Hilti shown on drawing with 6 " embedment; required 11 embedment is 8-1/8";
12 b. PS-03, enbednent length'for anchor bolt is shown on drawing as 13 3-1/2"; the require'd length is 5".
! 14 The above two were considered as drawing errors.
15 c. PS-05, weld length is actually 9" but 6" was used in the calculation.
16 Strut allowable is 14,200 lbs.but calculations used allowable of 17 15,700 lbs. The actual load on the support is 7,974 lbs. Bolt 18 locations used were incorrect.
19 d. PS-06, take out for hardware is 9"; 10" was used in calculation.
20 Anchor bolt allowable was reduced, althought no space violation 21 existed.
22 e. PS-07, moment X should be 52,824 lbs.; in the calculation moment 23 X used was 28,858 lbs.
24 f. PS-09, seismic movement was not considered in spring design.
c .
i 25 g. PS-11, forces used to qualify welds were incorrect.
i l 4
e
_ -, + .- - _, ,, ,- ,- _ - - _ __ - -- .. - e +
I h. A ' PUS U-bolt was used instead'of a PUH U-bolt, but it was the 2 PUH allowable whic'h was used in the calculation.
3 The res ' ewer rechecked against the PUS allowable. The load on 4 the bolt was 3915 lbs. and the allowable (per the reviewer) is 5 3,620 X 1.3 = 4706 lbs. (In reference to the stiffness importance, 6 if the load on this support increases by less than 25%, the allowable 7 for the U-bolt is exceeded. By Ed.)
8 1. PS-10, the pipe displacement supplied to support design was shown 9 to be .395 inches, whereas it should have been +.395 inches.
10 j. PS-25, stiffener ignored in base plate calculation (reviewer states 11 that this is 0.K. because it is conservative).
12 This caveat by the reviewer may or may not be true, but in any 13 event, the reviewer obviously did not check the problem correctly.
14 That is, the stiffener may be inadequate; it has not been qualified.
15 Base plate analyzed by FUB II base plate calculator program with 16 load centered on plate but actually the load is eccentric by one 17 inch..
18 k. PS-30, SA193-B7 rods were used to replace normal Hilti bolts 19 (bolt naterial made of SA4140 steel similar td the situation 20 with A307 bolts made of SA36 steel).
l 21 Also, four calculations stated that " loads used were from a previous 22 run which were higher than the new as-built loads." From this, one cannot 23 tell if. the calculation was checked to the loads used or written.off because 24 the new loads are l'ower.
25 In any event, checking the above citations, it does not take much of i
26 a brain to note that of the 31 drcwings involved, at least two drawings 'had '
l 27 errors. This was about 7% of the drawings. Of the 31 calculations, at least I -
1 8 had one error (one had three errors). This is about 25% of the package.
t l 2 Six of these errors, or about 20% of the package, were non-conservative errors.
i
, 3 If one out of 5 calculations contains a non-conservative error, the renainder 4 of the plant is in doubt. Beyond this, we might recall that the actual stiff-5 ness and seismic acceleration of support ' steel was neglected. From the preceding, 6 therefore, I am hard put to understand the first quotation "well done."
7 In reference to the walk-down as-built assessment check list, the information 8 to be gleaned from the limited documentation is equally interesting.
9 To start with, at Section 4.0, page 4-19, first item (in reference to 10 the walkdown effort) states that four snubberr have been inverted 1800 but 11 does not state whether an investigation had been made to determine if boots 12 were required (for the condition before or after). Also, there is no state-13 ment which indicates if the mechanism has been converted into proximity 14 with a hot line or the other way around. All that is mentioned is that 15 CP-CPM 9.17 dated 5/31/83 permits this inversion without including the 16 document. Of more interest is the numbers game introduced in this section 17 and to determine the numbers of actual supports which were reviewed per 18 the CYGNA criteria " verify the as-built condition of the supports." We 19 must first eliminate those supports which were not verified other than visually 20 (which means that someone saw the support) or ground projection (which means 21 much the same as visual observation from a substantial distance). These sup-22 ports were obviously out of range of a 12,14,, or 16 foot ladder or even
'23 an extension ladder; therefore, visual observation has no meaning.
Further, 24 I note that a transit has not been mentiored, although it would have proved 25 rather useful. The fact that some dimensions were taken on seven supports
13 -
1 also means that some dimensions were' not' taken. Therefore, of the 91 supports 2 that made up the review, only 48 were actually reviewed. Of this number, 3 4 contained drawing errors; they were WD-01 on page 9 of 11, branch dimension 4 is wrong; WD-02, page 4 of 10, drawing incorrectly shows square tube, filler 5 material shows a round tube, also this drawing has an incorrect centerline 6 dimension; WD-02, page 8 of 10, drawing shows wrong pipe centerline elevation; 7 WD-03, page 9 of 12, sway strut length is incorrect. From this we find that 8 about 1/12, or about 8%, of the drawings have errors. In summation, of the 9 31 calculations and 48 reviewed supports (79 total supports),12 have drawing 10 errors and 8 have calculation errors. In addition, two others have post-11 construction errors'(1) clearance between two different supports and (1) 12 no clearance in the unrestrained direction. Thus, for 79 supports, there 13 are 22 discrepancies, or 25% of the supports have an error. And this is 14 for a system which was to showcase the iterative process and has been sub-15 jected to more checks than Chase Manhattan Bank. If I were reviewing any 16 system and found that 25% of it contained errors, I would have to say that 17 if this system were even remotely indicative of the remainder of the plant, 18 then the plant is in trouble. There is no way that I'could write off the 19 rest of the plant as being safe based on the findings as they exist in the 20 CYGNA Report. The fact that CYGNA could justify some of the errors on the 21 basis that the stress ratio was low enough to absorb the error is without 22 merit except on a case-by-case basis. Since it is probable that on another 23 support the stress ratio may be too close to the allowable limit to absorb 24 any increase in stress, whether such stress results from an error or an 25 increase in load due to use of the actual stiffness factor which is less !
m y
4<4- +--,--wem-4 ,-w- =w-ww =, , -m w me ,e-.
%. w 9 g y
14 -
1 than the generic stiffness.
2 The following should point out the minor nature of problems which can 3 result in major failures:
4 1. The steam generator failure at Beaver Valley nuclear power station 5 resulted from a failure of the supports which were non-conservatively 6 designed for the original smaller generator.
7 2. The failure of a 3/4" air valve resulted in the chain of events 8 that we now call the accident at TMI.
9 3. The failure of a zirconium deflector resulted in the accident .
10 a t Fermi 1.
11 4. Browns Ferry suffered major damage and was fast approaching catastrophic 12 proportions as the result of a workman's candle igniting flammable 13 materials.
14 We have enough problems with the unforeseen without evading the fore-15 seeable. It is not in the interest of public safety to await the onslaught 16 of a seismic event to highlight the errors in engineering, nor is the fact 17 that seismic loading is incorporated into the analysis enough to assume 18 that it will act as a safety factor for errors during the period of non-19 seismic activity, as this would then reduce the probability of accident 20 to the cycle of seismic activity. Consider: with the existence of non-21 conservative error in at lera. 20% of the sample ' reviewed, the probability 22 of the same percentage of non-conservative error in the 40,000 supports 23 for CPSES means that 7,742 random supports are at risk.. And no one can ,
24 state offhand which of these can be dismissed as being capable of absorbing 25 an unknown error.
I s-
. _ _ - -- .= ~. - . - -_ . _ - . - _ . _ . . . . _ _ -
i 1 A final point to be made is in reference to the actual stiffness factors 2 of the supports. The generic stiffness study shows that in the particular
) 3 case studied, the loads increased by up to 200%. Compare this with the comment l
1 4 at 2. of check list PS-10, Appendix H:
5 " Bolts noted as unacceptable on the calculations. The designer waited for as-built loads for a final determination of acceptability as part
- 6 of the as-built program. The final load did decrease to acceptable l evels . "
7 8 If changes in loads will qualify these supports which fail to meet the 9 stress criteria, changes can also act to disqualify a previously qualified 10 support.
11 Q: Do you believe you found all of the items which concern you in j 12 regards to the CYGNA review?
) 13 A: No, I-do not, because my critique is based on the contents of the 14 commentary supplied by CYGNA, and this is only in areas where they had made i
15 an observation.. If we had access to the'itens which did not trigger an 16 observation, it is possible that the number of conflicts would have been 17 higher. To carry this thought'one step further, one has only to examine '
! 18 the types of supports reviewed versus the requirements of ASME Section III 19 to determine if there is a doubt that all factors were covered by the CYGNA 20 reviev.
21~ Subsection NF 4000 contains several interesting items which were 22 generically neglected at CPSES. -For example, the Applicant and Region IV 23 went to great lengths to prove that their support base' plate joints are 24 all of the bearing type.(no friction joints). In this case, there are two
~
25 areas which I noted when I worked at CPSES whic". I did not find mentioned
~
- t -p W w v vv e-rw e f v W 7 * -'
-7
l 1 in the CYGNA review, either as a criteria to be checked or mentioned in their 2 observa tions. These items are: The requirement to exclude bolt threads i
3 from the load bearing shank of bolts loaded in shear (generically violated 4 in the NPSI Richmond / tube support configurations, in which case the full 5 length of the A307 bolt is threaded). This violation is covered by NF 4722(b).
6 A second area involves the fact that locking devices for all threaded fasteners 7 must be provided, and this is covered by NF 4725. From my observations of 8 the base plates at CPSES, I find it hard to believe that CYGNA found no 9 violations of the type mentioned above during their walk-down.
10 Q: What causes you to be so certain that the CYGNA report is not 11 independent beyond the criticism you have with their observations and the 12 manner in which they closed out the problems?
13 A: Independence is not achieved when one must proceed from a posture 14 of self-defense, nor is independence achieved by having such an open mind 15 that your brains have fallen out. This obviously is the position that CYGNA 16 or any other organization or individual who depends on the nuclear industry 17 finds itself in an effort to ensure the acquisition of future contracts 18 or employment (such contracts as CYGNA now enjoys at the Seabrook nuclear 19 facility supplying support engineers on a contract basis). As the~ Board 20 is well aware, due to the number of affidavits filed charging retaliation 21 for making waves in the industry, it is obvious that one must exercise caution 22 in the critique of a member of the nuclear family. As is well known, it 23 is the bottom line which counts.
24 ' Q: Do you have anything further to say?
25 A: No, not at this particular time. . .