Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20077D938 + (ML20077D938)
- ML20077D941 + (ML20077D941)
- ML20077D944 + (ML20077D944)
- ML20077D946 + (ML20077D946)
- ML20077D950 + (ML20077D950)
- 05000271/LER-1991-011, :on 910430,inadvertent Group 6 Primary Containment Isolation Actuation Occurred During Plant Heatup.Caused by Incomplete Procedure Govering Bypass Switches.Switches Reopened + (ML20077D954)
- ML20077D956 + (ML20077D956)
- ML20077D961 + (ML20077D961)
- ML20077D964 + (ML20077D964)
- ML20077D978 + (ML20077D978)
- ML20077D979 + (ML20077D979)
- ML20077D985 + (ML20077D985)
- ML20077D988 + (ML20077D988)
- ML20077D990 + (ML20077D990)
- ML20077D991 + (ML20077D991)
- ML20077E004 + (ML20077E004)
- ML20077E015 + (ML20077E015)
- TXX-9120, Forwards Rept RXE-91-005, Methodology for Reactor Core Response to Steamline Break Events for Review & Approval by Feb 1992 to Allow Licensing of Cycle 3 Operation Schedule to Begin in Sept 1992 + (ML20077E024)
- ML20077E027 + (ML20077E027)
- 05000293/LER-1983-038-03, /03L-0:on 830622,one Signoff Sheet Found Not Initialed for 2 H Period During Unscheduled Supervisory Insp of Fire Patrols.Caused by Failure to Read & Comprehend List of Areas to Be Patrolled.Individual Instructed + (ML20077E029)
- ML20077E030 + (ML20077E030)
- ML20077E031 + (ML20077E031)
- ML20077E033 + (ML20077E033)
- ML20077E046 + (ML20077E046)
- TXX-4013, Responds to NRC 830706 Position That RCS Cold Leg Temp & Source Range Neutron Flux Indicators Must Be Included in Alternate Shutdown Design.Expeditious Consideration of Design Requested.Review Affects Fuel Load Date + (ML20077E048)
- ML20077E049 + (ML20077E049)
- ML20077E051 + (ML20077E051)
- ML20077E052 + (ML20077E052)
- ML20077E053 + (ML20077E053)
- ML20077E054 + (ML20077E054)
- ML20077E057 + (ML20077E057)
- ML20077E058 + (ML20077E058)
- ML20077E059 + (ML20077E059)
- ML20077E061 + (ML20077E061)
- ML20077E063 + (ML20077E063)
- ML20077E065 + (ML20077E065)
- U-601831, Discusses Leak Testing of Backup ADS Air Supply Sys to Ensure Adequate Supply of Air to ADS Valves to Support short-term Operability.Testing on 910301 Demonstrated That Min 3-day Air Supply Exists in Sys W/O Makeup + (ML20077E070)
- ML20077E072 + (ML20077E072)
- ML20077E075 + (ML20077E075)
- RC-94-0310, Forwards Rev 0 to Core Operating Limits Rept for Cycle 9 + (ML20077E090)
- ML20077E100 + (ML20077E100)
- ML20077E101 + (ML20077E101)
- 05000458/LER-1991-009, :on 910430,high Radiation Area Barrier Moved Improperly.Caused by Personnel Error.High Radiation Lock Installed & Personnel Involved Counseled + (ML20077E106)
- RC-94-0312, Forwards Rev 35 to EP-100, Radiation Emergency Plan + (ML20077E113)
- RBG-35135, Forwards Updates of Actions Discussed in Util Re Interim Status to Vendor Interface & Procurement Team Insp Rept 50-458/89-200 + (ML20077E117)
- ML20077E130 + (ML20077E130)
- ML20077E144 + (ML20077E144)
- ML20077E145 + (ML20077E145)
- ML20077E146 + (ML20077E146)
- ML20077E149 + (ML20077E149)
- ML20077E152 + (ML20077E152)