Category:REPORTS-TOPICAL (BY MANUFACTURERS-VENDORS ETC)
MONTHYEARML20086B2201995-02-28028 February 1995 Nonproprietary Version of Application of 'Regional Excursion W/Flow-Biased APRM Neutron Flux Scram' Stability Solution (Option I-D) to Ja FitzPatrick Npp ML20113H2051984-12-31031 December 1984 Addendum 4 to LOCA Analysis Rept for Ja Fitzpatrick Nuclear Power Plant (Lead Plant) ML20235G6191983-04-30030 April 1983 Analysis of Operation W/One Safety/Relief Valve Out-of-Svc for Fitzpatrick Nuclear Power Plant. Addl Documentation Encl ML20235G6111982-09-30030 September 1982 Cycle 5 Analysis for Operation W/One Safety/Relief Valve Out of Svc ML20077D9611980-12-31031 December 1980 Errata & Addenda to NEDO-24281, Single Loop Operation ML20028F0821980-08-31031 August 1980 Single Loop Operation. ML19350A1871980-07-31031 July 1980 GE BWR Load Line Limit Analyis for James a Fitzpatrick Nuclear Power Plant Cycle 4, Suppl 1 ML19350A1851980-02-28028 February 1980 GE BWR Reactor Load Line Analysis for James a Fitzpatrick Nuclear Power Plant. 1995-02-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
e ,
- ' /
/ NUCLE An ENET.GY BUSINESS GROUP
- GENER AL ELECTRIC COMP ANY SAN JOSE. CALIF O2NI A 95125 G E N ER AL $. E LECTRIC APPLICABLE TO:
NEDO-24281
"'C^** ERRATA And ADDENDA 7, ,, g, so - Refer to 80NED285 SHEE'T FITZPATRICK NUCLEAR y TITLE w0_
POWER PLANT SINGLE-LOOP OATE December 1980 OPERATION NOTE: Correct allcopies of the applicable ugust M 80 publication as specified below.
ISSUE D ATE REFERENCES ENST R UCTIOt45 pdnag$aI[gNgy (commECTeoNS AND ADDITIONS) 01 Page 1-1/1-2 Replace with new page 1-1/1-2 02 Page 5-2 Replace with new page 5-2.
03 Page 5-5 Replace with new page 5-5.
h 4
1 s i I
l PAGE 1 Of 1 8307270440 830725 DR ADOCK 05000333 PDR i
~,
- NEDO-24281
- 1. INTRODUCIION AND
SUMMARY
The current technical specifications for the FitzPatrick Nuclear Power Plant p
/ do not allow plant operation beyond a relatively short period of time if an idle recirculation loop cannot be returned to service. The FitzPatrick Nuclear Power Plant (Technical Specification 3.6.E.3) shall not be operated for a period in excess of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with one recirculation loop out of service.
The capability of operating at reduced power with a single recirculation loop is highly desirable, from a plant ave.ilability/ outage planning standpoint, in the event maintenance of a recirculation puup or other component renders one loop inoperative. To justify single-loop operation, the safety analyses docu-merted in the Final Safety Evaluation Reports and Reference 1 were reviewed for one-pump operation. Increased uncertainties in the core total flow and TIP readings resulted in an 0.01 incremental increase in the MCPR fuel cladding integrity safety limit during single-loop operation. This 0.01 increase is reflected in the MCPR operating limit. No other increase in this limit is required as core-wide transients are bounded by the rated power / flow analyses performed for each cycle, and the recirculation flow-rate dependent rod block and scram setpoint equations given in the technical specifications are adjusted for one-pump operation. The least stable power / flow condition, achieved by tripping both recirculation pumps, is not affected by one-pump operation.
During single-loop operation, the flow control should be in master manual, since control oscillations might occur in ene recire'ulation flow control system under automatic flow control conditions.
Derived MAPLEGR reduction factors are 0.84, 0.85, and 0.84 for the 7x7, 8x8, )
and 8x8R/P8x8R fuel types, respectively. l l
l The discharge valve in the idle recirculation loop is normally closed, but if its closure is prevented, the suction valve in the loop should be closed to prevent the loss of Low Pressure Coolant Injection (LPCI) flow out of a postu-lated break in the idle suction line.
1-1/1-2
~o j,
,. m ~
'/ tha moet lisiting brcck cico occure et tha 80lll DBA dicchasga brack, cnd tha
- ./
/ reflooding time is 247 seconds. The uncovered time at the most limiting break is 213 seconds fcr the two-loop analysis and 214 seconds for the single-loop analysis.
/
/
5.1.2 Single-Loop MAPLHGR Determination The small difference in uncovered time for the limiting break size would result .
in a very small change in the calculated peak cladding temperature. Therefore, as noted in Reference 3, the one- and two-loop SAFE /REFLOOD results can be con-sidered similar and the generic alternative procedure described in Section II.A.7.4 of this reference was used to calculate the MAPLHGR reduction factors for single-loop operation.
MAPLHGR reduction factors were determined for the cases given in Table 5-1.
The most limiting reduction factors for each fuel type is shown in Table 5-2.
One-loop operation MAPLHGR values are derived by multiplying the current two-loop operation MAPLHGR values by the reduction factor for that fuel type.
As discussed in Reference 3, single recirculation loop MAPLHGR values are conservative when calculated in this manner.
5.1.3 Small Ereak Peak Cladding Temperature Section II.A.7.4.4.2 of Reference 3 discusses the spall sensitivity of the calculated peak clad temperature (PCT) to the assumptions used in the one-pump operation analysis and the duration of nucleate boiling. Since the slight increase (%50*F) in PCT is overwhelmingly offset by the decreased MAPLHCR (equivalent to 300* to 500'F PCI) for one-pump operatic,, the calculated PCT l values for small breaks will be well below the 2200*F 10CFR50.46 cladding temperature limit.
5.2 ONE-PUMP SEIZURE ACCIDENT The one-pump seizure accident is a relatively mild event during two-recirculation-pump operation, as documented in References 1 and 2. Similar analyses were performed to determine the impact this accident would have on 5-2
NEDO-24281
,?
/ '
Table 5-1
</
j MAPLHGR MULTIPLIER CASES
/
Fuel Type Cases Calculated 7x7 80% DBA Discharge Break
- 85% DBA Discharge Break 100% DBA Suction Break -
8x8 80% DBA Discharge Break
- 85% DBA Discharge Break 100% DBA Suction Break 8x8R/P8x8R 80% DBA Discharge Break
- 85% DBA Discharge Break 100% DBA Suction Break
- Most limiting break for MAPLHGR reduction factors. ,
Table 5-2
~
LIMITING MAPLHCR REDUCTION FACTORS Fuel Type Reduction Factors 7x7 0.84 8x8 4 0.85 Ex8R/P8x8R 0.84 4
5-5