Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076J775 + (ML20076J775)
- ML20076J779 + (ML20076J779)
- B10812, Forwards Rev 1 to Updated FSAR for Millstone Unit 2 + (ML20076J789)
- 05000321/LER-1983-084-01, /01T-0:on 830813,main Steam Line Radiation Monitors 1D11-K603C,D & 2D11-K603A,B,C & D Found to Have Setpoint Greater than Three Times Normal Operating Background.Caused by Inadequate Procedure + (ML20076J790)
- ML20076J794 + (ML20076J794)
- ML20076J799 + (ML20076J799)
- HL-4714, Responds to NRC Re Violations Noted in Insp Repts 50-321/94-17 & 50-366/94-17.Corrective Action:Ltr Was Issued to License Training Staff on 940930 That Emphasized Plant Procedure Requirement to Document Remedial Training + (ML20076J803)
- 05000311/LER-1983-039-03, /03L-0:on 830723,control Rod 2C4 Inserted Fully & Could Not Be Withdrawn.Unit Placed in Hot Standby.Caused by Control Rod Drive Mechanism Cable Connector Pins Pushed Into Insulator,Resulting in Intermittent Connection + (ML20076J814)
- PY-CEI-NRR-1650, Application for Amend to License NPF-58,requesting Proposed Changes to TS to Clarify Limiting Conditions for Operation & Action Statement for Specifications 3.6.1.2 + (ML20076J815)
- ML20076J820 + (ML20076J820)
- 05000272/LER-1983-032-03, /03L-0:on 830725,during Routine Power Operation, Boric Acid Transfer Pump 11 Tripped Shortly After Being Started,Following Completion of Batch Transfer Evolution. Cause Assumed to Be Solid Boron Obstruction + (ML20076J821)
- B10830, Forwards Overpressure Protection Rept & Rev 1 to Preservice Insp Plan,Per 830331 Commitment to Provide Addl Info,In Response to NRC Acceptance Review of OL Application + (ML20076J822)
- ML20076J826 + (ML20076J826)
- ML20076J829 + (ML20076J829)
- ML20076J834 + (ML20076J834)
- JPN-94-054, Forwards Operator Licensing Exam Data for Indian Point 3 + (ML20076J836)
- ML20076J844 + (ML20076J844)
- ML20076J846 + (ML20076J846)
- NRC-94-0103, Provides Response to NRC Administrative Ltr 94-12, Operator Licensing Natl Exam Schedule + (ML20076J849)
- ML20076J853 + (ML20076J853)
- ML20076J857 + (ML20076J857)
- ML20076J858 + (ML20076J858)
- ML20076J859 + (ML20076J859)
- ML20076J860 + (ML20076J860)
- ML20076J861 + (ML20076J861)
- ML20076J862 + (ML20076J862)
- ML20076J863 + (ML20076J863)
- ML20076J865 + (ML20076J865)
- ML20076J866 + (ML20076J866)
- ML20076J870 + (ML20076J870)
- ML20076J872 + (ML20076J872)
- ML20076J873 + (ML20076J873)
- 05000389/LER-1983-043-03, /03L-0:on 830730,during Power Ascension Testing, While at 80% Power & W/Charging Pump 2C Out of Svc for Maint,Pump 2B Declared Out of Svc.Caused by Pump Accumulator Dampener in Low Nitrogen Pressure Condition + (ML20076J893)
- 05000366/LER-1983-070-03, /03L-0:on 830801,during Monthly HPCI Steam Line Delta P Instrument Ft & C Procedure,High Differential Pressure Indicating Switch 2E41-N004 Found Out of Calibr. Caused by Setpoint Drift.Switch Recalibr + (ML20076J896)
- ML20076J898 + (ML20076J898)
- 05000311/LER-1983-044-01, /01T-0:on 830811,following Reactor Trip,Vital Bus Sustained Degraded Undervoltage Relays Found Slightly Below Min Value.Caused by Setpoint Drift.Relays Recalibr + (ML20076J902)
- ML20076J905 + (ML20076J905)
- ML20076J907 + (ML20076J907)
- 0CAN088318, Requests 30-day Extension for Responding to Generic Ltr 83-28, Generic Implications of Salem ATWS Event, Scheduled for 830906 to Allow for Addl Meetings of B&W Owners Group Committees + (ML20076J908)
- ML20076J911 + (ML20076J911)
- ML20076J916 + (ML20076J916)
- ML20076J918 + (ML20076J918)
- ML20076J919 + (ML20076J919)
- ML20076J920 + (ML20076J920)
- ML20076J925 + (ML20076J925)
- ML20076J927 + (ML20076J927)
- ML20076J929 + (ML20076J929)
- ML20076J931 + (ML20076J931)
- ML20076J932 + (ML20076J932)
- ML20076J935 + (ML20076J935)
- ML20076J936 + (ML20076J936)