Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070E496 + (ML20070E496)
- ML20070E497 + (ML20070E497)
- 05000346/LER-1982-059-03, /03L-0:on 821108,containment post-accident Radiation Monitor,Channel 2 Read Low.On 821116 & 22 Equipment Fail Alarm Received.Caused by Failed High Voltage Power Supply Board.Board Replaced & Declared Operable + (ML20070E502)
- ML20070E510 + (ML20070E510)
- 05000395/LER-1982-042, Forwards LER 82-042/03L-0.Detailed Event Analysis Encl + (ML20070E514)
- NRC-94-0056, Requests That Portion of Ltr Re License Amend Request,Affecting TS 6.2.2.g,be Withdrawn + (ML20070E519)
- ML20070E520 + (ML20070E520)
- ML20070E531 + (ML20070E531)
- ML20070E533 + (ML20070E533)
- 05000395/LER-1982-042-03, /03L-0:on 821110,RCS Temp Average Decreased When Control Rods Inserted.Caused by Simultaneous Rod Insertion & Main Steam Dumping.Control Rods Withdrawn & Steam Dump Isolated to Recover Temp Average + (ML20070E534)
- 05000315/LER-1982-102-03, /03L-0:on 821118,Pryralarm Fire Detector in Auxiliary Bldg Zone 2 Alarmed.Caused by Low Setpoint. Detector Assembly Cleaned,Verified & Returned to Svc. Setpoint Adjusted + (ML20070E538)
- ML20070E539 + (ML20070E539)
- ML20070E541 + (ML20070E541)
- ML20070E546 + (ML20070E546)
- 05000315/LER-1982-103-03, /03L-0:on 821127,fire Door 387 at Entrance to Quadrant 2 of Auxiliary Bldg Around Containment Found in Nonconservative Configuration.Caused by Active Leaf of Double Doors Closing Before Inactive Leaf + (ML20070E548)
- ML20070E555 + (ML20070E555)
- ML20070E565 + (ML20070E565)
- ML20070E567 + (ML20070E567)
- ML20070E569 + (ML20070E569)
- ML20070E573 + (ML20070E573)
- ML20070E574 + (ML20070E574)
- ML20070E577 + (ML20070E577)
- ML20070E587 + (ML20070E587)
- ML20070E589 + (ML20070E589)
- ML20070E596 + (ML20070E596)
- 05000416/LER-1982-129, Forwards LER 82-129/03L-0 + (ML20070E598)
- ML20070E601 + (ML20070E601)
- ML20070E602 + (ML20070E602)
- ML20070E603 + (ML20070E603)
- ML20070E605 + (ML20070E605)
- ML20070E622 + (ML20070E622)
- ML20070E629 + (ML20070E629)
- ML20070E630 + (ML20070E630)
- ML20070E633 + (ML20070E633)
- 05000416/LER-1982-129-03, /03L-0:on 821113,14 & 15,smoke Detectors in Auxiliary Bldg New & Spent Fuel Pool,East Corridor,Northeast Corridor Equipment & Steam Tunnel Root Areas Annunciated & Would Not Reset.Caused by Dust in Detectors + (ML20070E636)
- ML20070E640 + (ML20070E640)
- ML20070E643 + (ML20070E643)
- ML20070E646 + (ML20070E646)
- ML20070E647 + (ML20070E647)
- ML20070E663 + (ML20070E663)
- TXX-3588, Forwards Human Factors Control Room Design Review of Comanche Peak Steam Electric Station, to Resolve SER (NUREG-0797) Open Issue + (ML20070E667)
- ML20070E673 + (ML20070E673)
- ML20070E677 + (ML20070E677)
- ML20070E687 + (ML20070E687)
- 05000289/LER-1994-005-01, :on 940609,noted Irregularity in Overlap Between Average Positions of Control Rod Groups 6 & 7 Due to Intermitent Failure of CRD Sys Programmer Motor.Group 7 Programmer Assembly Will Be Replaced + (ML20070E690)
- ML20070E692 + (ML20070E692)
- 05000424/LER-1991-001-03, :on 910201,last Analog Channel Operational Tests for Four Triaxial time-history Accelerograph Seismic Monitoring Instruments in Error.Caused by Inadequate Surveillance Procedure.Procedure Revised + (ML20070E695)
- ML20070E697 + (ML20070E697)
- PM-82-128, Forwards Monthly Operating Repts for Nov 1982 + (ML20070E705)
- 05000369/LER-1990-023, :on 900821,both Trains of Control Room Ventilation Sys Inoperable During Mod & Functional Testing. Caused by Sheared Off Detensioning Bolts on Air Handling Unit Motor Base.Train a Redesigned + (ML20070E707)
- ML20070E716 + (ML20070E716)