Responds to Suppl 1 to Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. No Commitments Provided
ML20070E587
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/08/1994
From: Powers K
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-90-001, IEB-90-1, TAC-M85442, TAC-M85443, NUDOCS 9407150203
Download: ML20070E587 (2)


Text

3 k

1,m.a.* vaw, Aumny. rcst o%h Em S<m Da sy.1viresse 3OM2r;G r

Ken Powers we rww. snr,yan taxw, plan.

July 8, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - NRC BULLETIN 90-01, SUPPLEMENT 1 - LOSS OF FILL-0IL IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT, VERBAL REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. 85442 AND 85443)

References:

1.

TVA letter to NRC dated March 15, 1994, "Sequoyah Nuclear Plant (SQN) - NRC Bulletin 90-01, Supplement 1 - Loss of Fill-011 in Transmitters Manufactured by Rosemount, Verbal Request for Additional Information (TAC Nos. 85442 And 85443)"

2.

'IVA letter to NRC dated July 13, 1990, "Sequoyah Nuclear Plant (SQN) - NRC Bulletin 90 Loss of Fill-011 in Transmitters Manufactured by Rosemount" Reference 1 provided additional information in regard to TVA's trending program, which is being used to meet the enhanced surveillance program required in NRC Bulletin 90-01.

Reference 1 also stated that TVA will delete six Rosemount transmitters from the trending program in accordance with guidance provided in Supplement 1 of NRC Bulletin 90-01.

NRC has requested confirmation that, for the deleted transmitters, TVA has a high degree of confidence that failures from loss of fill-oil will be detected and a high degree of reliability is maintained for the function consistent with its safety significance.

It 1 n

sJ U G G s 94071502g

$77 i

PDR ADO FDR 7

0

'O

e b

U.S. Nuclear Regulatory Commission Page 2 July 8, 1994 L

In Reference 2, SQN committed to " Revise procedures by adding steps and/or precautions to ensure appropriate personnel are aware of the loss of fill-oil issue and the need for additional management review if a Rosemount transmitter is discovered outside the normal drift tolerance."

l The appropriate procedures presently contain the information discussed in this commitment for the Rosemount transmitters listed in Reference 2.

TVA believes that maintenance of this commitment will maintain a high degree of confidence for detecting failure of these transmitters caused by a loss of fill-oil.

In addition, in accordance with TVA's maintenance practice, j

a high degree of reliability will be maintained for the transmitter's function consistent with its safety significance.

There are no new commitments as a result of this letter.

Please direct questions concerning this issue to W. C. Ludwig at (615) 843-7460.

Sincerel,

/

[--

en Psowers cc:

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector i

Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 t