Third Interim Deficiency Rept Re Failure of Seismic Category I Pressure Gauges Supplied by Dresser Industries.Initially Reported on 810923.Gauges Placed on QA Hold Pending Test Results.Also Reportable Per 10CFR21
ML20070E640
Person / Time
Site: Harris 
Issue date: 12/09/1982
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-28, REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8212170328
Download: ML20070E640 (4)


Text

e.

p Cp&L Carolina Power & Light Company P. O. Box 101, New Hill, N. C.

27562 December 9, 1982

,, f.

4

?,

bb Mr. James P. O'Reilly NRC-28',.

i $j United States Nuclear Regulatory Commission P

Region II W

101 Marietta Street, Northwest (Suite 3100) 6-Atlanta, Georgia 30303

^

C.

CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1985 900,000 KW - UNITS 1 & 2 DRESSER-SUPPLIED PRESSURE GAUGES, PURCHASE ORDER NY-435104, ITEM 62

Dear Mr. O'Reilly:

Attached is our third interim report on the subject item which was deemed potentially reportable per the provisions of 10CFR50.55(e) and 10CFR, Part'21, on September 23, 1981. As stated in the attached report, it is currently projected that submission of the final report will be accomplished by September 15, 1983.

Thank you for your consideration in this matter.

Yours very truly, g

!:^^'

R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh Attachment cc:

Mr. G. Maxwell (NRC-SHNPP)

Mr. V. Stello (NRC) l 8212170328 82 9

ggb @e gDRADOCK050 i

C 00 PDR

, ~ '

~.

4 i

4 i

1 i

CAROLINA POWER & LIGHT COMPANY l

SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DRESSER-SUPPLIED PRESSURE GAUGES i

Third Interim Report December 9, 1982 1

j Potentially Reportable Under 10CFR50.55(e) and 10CFR21 l

i i

i i

a J

J a

I

_. - _ _ _ - - ~ ~, _. ~. - - - -,.

.... - - =

_ _ _,, -..,... - ~. _.... -...

i

SUBJECT:

Shearon Harris Nuclear Power Plant

. Unit No. 1 10CFR50.55(e) and 10CFR, Part 21, Potentially Reportable i

Deficiency Seismic Testing of Pressure Gauges purchased under Ebasco Purchase Order NY-435104 I

ITEM:

Bourdon Type Pressure Gauges j

SUPPLIED BY:

Dresser Industries

]

Industrial Valve and Instrument Division Stratford, Connecticut 06497 t

1 j

NATURE OF 2

DEFICIENCY:

The deficiency involves Seismic Category 1 pressure gauges. The gauges were delivered to the Shearon Harris site prior to completion and documentation of seismic testing.

DATE PROBLEM 4

OCCURRED:

September 23, 1981 - Shearon Harris site personnel discovered that documentation was not available for Seismic 1 pressure gauges.

DATE PROBLEM REPORTED:

September 23, 1981 - L. E. Jones (CP&L) reported the item as potentially reportable to Mr. R. Butcher, Region II, Nuclear Regulatory Commission.

SCOPE OF I

PROBLEM:

The problem is confined to seismic pressure gauges having either steel or bronze Bourdon tube mechanisms. Thirty-eight (38) purchase order items consisting of a total of 38 pressure gauges are involved.

SAFETY IMPLICATIONS: The pressure gauges are classified as Seismic Category 1 and will be installed in safety-related piping systems.

The gauges will be installed directly on pipes or on instrument panels.

In the latter case, small diameter piping or tubing connects the gauge to the pressure boundary.

Failure of the pressure gauges to retain pressure boundary l

integrity during or after an earthquake could adversely affect the safe operation of the plant.

l

l REASONS PROBLEM IS POTENTIALLY REPORTABLE:

During a routine inspection by Ebasco at Dresser's plant on October 1 and 2, 1979, the Ebasco inspector rejected t

a shipment of pressure gauges because documentation was not complete.

Some time thereafter, Dresser Industries inadvertently shipped some of the Seismic 1 pressure gauges that were previously rejected without obtaining

~

the proper Ebasco release and before completion of seismic testing.

The Seismic I pressure gauges apparently were delivered to the Shearon Harris site as part of a shipment consisting primarily of nonnuclear safety pressure gauges.

A seismic test procedure for pressure gauges has been submitted to Ebasco for review by Dresser / Dayton T. Brown Company.

Preliminary approval has been given to this procedure.

The question of reportability is addressed in this report as a potential breakdown of Dresser's quality assurance program, which permitted safety-related items to be shipped without the required Ebasco inspection and prior to the completion of seismic testing.

To determine whether this deviation, if left uncorrected, j

could create a substantial safety hazard, seismic tests will have to be conducted.

Seismic test results for both steel-type and bronze-type pressure gauges are not yet available.

Evaluations by Ebasco cannot be completed at this time.

Therefore, a final determination of reportability cannot be made until tests are completed and evaluated.

CORRECTIVE ACTION:

1.

Seismic 1 pressure gauges from Dresser delivered to the Shenron Harris site have been placed on "QA hold" as of September 23, 1981.

2.

Seismic testing will be conducted by Dresser / Dayton T. Brown Company. The results will be reviewed by Ebasco. A total of four tests will be conducted - two tests on panel-mounted instruments and two tests on pipe-mounted instruments - one test each for bronze Bourdon tubes and steel Bourdon tubes. Results of these tests will be presented in the final report, which is scheduled for September 15, 1983.

.-