JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued thrcugh the month of November.

The following safety-related maintenance was performed in the month of November:

1. Performed miscellaneous maintenance on diesel generators.
2. Cleaned, inspected and repaired miscellaneous valves in containment.
3. Performed hydraulic snubber functional test and repaired snubbers as necessary.
4. Repacked #2, #4, #6, #7 and #10 River Water pumps.

i I

~

l 82121703ca 821213 I PDR ADOCK 05000364 R PDR

- 4 .- . . , ,,...m.. .- . .. . ., , . - . 3 . ~ ,. . s , m ., c m m -.m ., .

DOC)1T No. 50-364 UNIT 2 DATT. 12/04/82

(

t~

COSIPLETED BY W. G. Hairston, III TELEPl!ONE (205) 899-5156 510fGli November DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE-Net ) (SIWE Net) 0 0 I. 37 2 0 13 0 0 g9 0 3

4 0 20 0 0 0 5 21 s- O y 0 4

7 0 23 0 g 0 24 0 0 0-9 25 10 0 26 0 Ig 0 0 27 0 0 12 73 0 ;9 0 .

13 0 0 14 30 r* IS 0 3g 16 0 l INSTR 11CITONS On this form: . list the avenge daily umt power !cvelin AlWe Net for esch d:y in the reporting inunth. Compute io

, the nearc.t whole nr;2 wait.

, (997) l O

, ~. aw ~

~. .

/ N (V I OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12/04/82 COMPLETED BY W.G.Hairston,III TELEPHONE (205)899-5156 OPERATING STATUS Notes

1. Unit Name: J Seph M. Farley - Unit 2
2. Reporting Period: November, 1982 1) Cumulative data since 2652 7/30/81, date of commer-
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 860 cial operation. .

S. Design Electrical Rating (Net MWe): 829

6. Maximum Dependable Capacity (Gross MWe): 854.7 _ _ _
7. Maximum Dependable Capacity (Net MWe): 813.7
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Ib,er Level To Which Restricted,If Any (Net MWe): N/A
10. Reasons For Restrictions,if Any: N/A (O'J This Month Yr..to.Date ' Cumulatise l 11. Hours in Reporting Period 720 8.016 11,737

!2. Number Of flours Reactor Was Critical 12.4 6,358.6 10,044.8 f 138.4

13. Reactor Resene Shutdown llours 0 97.6 l

0 6,254.2 9,920.7 l 14. Hours Generator On.Line

15. Unit Resene Shutdown Hours 0 0 0 0 15,955,657 64,400,880 a
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 28 .___,,, 5,102,548 8,173,926

-7,464 4,825,150 7,745,870

18. Net Electrical Energy Generated (MWH)
19. Unit Senice Factor 0.0 78.0 84.5 l
20. Unit Availability Factor 0.0 78.0 84.5
21. Unit Capacity Factor iUsing MDC Net) - 1.3 74.0 81.1
22. Unit Capacity Factor (Using DER Net) - 1.3 72.6 79.6
23. Unit Forced Outage Rate 0.0 11.6 8.1
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date and Duration of Each1:

___ N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 12/03/82
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY 5/06/81 5/08/81 fp\

INITI AL ELECTRICITY 5/24/81 5/25/81 l COMMERCI A L OPERATION 8/01/81 7/30/81 (4/77 :

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNITNAME J.M.Farlev - Unit 2 DATE 1?/nu/a7

COMPLETED BY W.G.Hairston, III

' REPORT MONTig November '

TELEPilONE (205)899-5156

{ -

-. .! E 'h I Licensec 6% _h* Cause & Corrective No. Date c. 3g g jg5 Event r? E'.E Action o f

  • $ 2., 5 j g5 g Repost * ,

50 V Prevent Recurrence

! 6 -

j .

013 821101 S 720 C 1 -NA NA NA Unit outage was continued from 10/31/82 -

for refueling.

1 fi i

1 2 3 4 '

F: Furi.ed Reason: Method: Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data ti. Maintenance or Test 2-Manual Scram. Entry Sheets for I.icensee C Refuehng 3 Automatic Scram. Event Repor (LER) File (NUREG-D Regulatosy Restriction  ;

4-Other (Explain) 0161)

E Operator Training & Ucense Examination F-Administ rative 5 G Opciational l.nor tlimplam) lisinhit I . Same Siance (9/17) 11 Oshes (lixplain) 1

, l '

o . .

9 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued through the month of November.

The following safety-related maintenance was performed in the month of November:

1. Performed miscellaneous maintenance on diesel generators.
2. Cleaned, inspected and repaired miscellaneous valves in containment.
3. Performed hydraulic snubber functional test and repaired snubbers as necessary.
4. Repacked #2, #4, #6, #7 and #10 River Water pumps.

l

. s .- , , . . - . :. :a , - ..~.~m . . . - -. a.

DOCKET NO. 50-364 UNIT 2

/ .

DA'II 12/04/82 W. C. Hairston, III

( ,

COMPLETED BY TELEPl!ONE (205) 899-5156

)!OfG11 November DAY AVERACE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER I.EVEL (alwe-Ner) (51we. Net) 0 0 I. 37 2 0 is 0 0 .

g9 0

. 3 0

^

4 0 20 0 0 5 21

  • - 0 g 0 6

0 3 0 7

g 0 24 0 0 0 9 25 10 0 26 0 O 0 II 27 0 0 12 73 0 ;9 0 .

13

' 0 0 14 30 e IS 0 3g I6 0 L

INSTRUCIIONS On this form: . list the svenge daily umt power levelin MWe Net for each d:y in the reporting month. Compute to

, the nearest whole nc;2 wait.

, (9(77)

% .

  • c -sum- .

- '- * - * . y ,, ., ,

e I OPERATING DATA REPORT DOCKET NO. 50-364 DATt 12/04/82 COMPLETED BY W.G.Hairston.III TELEPHONE (205)89925156 OPERATING STATUS Notes

1. Unit Name:

J seph M. Farley - Unit 2

2. Reporting Period:

November, 1982 1) Cum 'ative data since 2652 7/30/81, date of commer-

3. Licensed Thermal Power (MWt):

860 cial operation. .

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

829

6. Maximum Dependable Capacity (Gross MWe): 854.7
7. Maximum Dependable Capacity (Net MWe):

813.7

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

~

9. Power Level To Which Restricted lf Any (Net MWe): N/A
10. Reasons For Restrictions,If Any: N/A I

This Month Yr..to.Date Cuniulatise 720 8,016 11,737

11. Hours in Reporting Period 12.4 6,358.6 10,044.8
12. Number Of Hours Reactor Was Critical .

0 97.6 138.4

~

13. Reactor Reserve Shutdown Hours 0 6,254.2 9,920.7
14. Hours Generator On.Line 0 0 0
15. Unit Rewrve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 0 15,955,657 64,400,880 '

28 .,, 5,102,548 8,173,926

17. Gross Electrical Energy Generated (MWH)

-7,464 -4,825,150 7,745,870

18. Net Electrical Energy Generated (MWH) 0.0 78.0 84.5
19. Unit Senice Factor
20. Unit Availability Factor 0.0 78.0 84.5
21. Unit Capacity Factor (Using MDC Net) - 1.3 74.0 81.1

- 1.3 72.6 79.6

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0 11.6 8.1
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Erch):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 12/03/82
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/08/81 INITI AL ELECTRICITY 5/24/81 5/25/81 COMMERCI AL OPER ATION 8/01/81 7/30/81 (9/77i

e DOCKET NO. 50-364 ,

UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAhlE J.M.Farlev - Unit 2 DATE 17/na/g7 ~

COMPLETED BY W.G.Hairston, lII '

REPORT af0NTil November TELEPilONE (205)899-5156 i ":.

No. Daic g

.! p 3g

}:; jg5 E Licensec Event

,Eg g?

h.

Q Cause & Currective Action to 8-fE 5 2U gg =!

Report a -

mO u

$0 Pacvent Recurrence .

6 013 821101 S 720 C 1 NA NA NA Unit outage was continued from 10/31/82 for refueling.'

t 4

I 2 3 4 F: Forced Reason: Method: Exhibit G Instructions S: Scheduled A-Fquipment Failure (Explain) 1 -Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram. Entry Sheets for I.icensee i

C.Rcfuchng 3 Autunutic Scram. Event ReporI (i.ER) File INUREG-D-Regulatosy Restriction 4-Other (Explain) 0161)

! E-Operator Training & Ucense Examination F-Administ rative 5 G Opciational I.nor (linplain) INhibii ! Same Sousee 19/11) 11 Othe II mplain) l