JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued thrcugh the month of November.

The following safety-related maintenance was performed in the month of November:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Cleaned, inspected and repaired miscellaneous valves in containment.

3.

Performed hydraulic snubber functional test and repaired snubbers as necessary.

4.

Repacked #2, #4, #6, #7 and #10 River Water pumps.

i I

l 82121703ca 821213

~

I PDR ADOCK 05000364 R

PDR

4.-..,

,,...m..

.....,,. -. 3

. ~,.. s, m., c m m

-.m DOC)1T No. 50-364 UNIT 2

12/04/82 DATT.

(

t COSIPLETED BY W. G. Hairston, III

~

TELEPl!ONE (205) 899-5156 510fGli November DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE-Net )

(SIWE Net) 0 0

I.

37 2

0 13 0

0 0

g9 3

4 0

20 0

0 0

5 21 s-O 0

4 y

7 0

23 0

0 g

0 24 0

0-9 25 10 0

26 0

0 0

Ig 27 0

0 12 73 13 0

0

9 0

0 14 30 0

r*

IS 3g 16 0

l INSTR 11CITONS On this form:. list the avenge daily umt power !cvelin AlWe Net for esch d:y in the reporting inunth. Compute io

, the nearc.t whole nr;2 wait.

(997) l O

~.

aw

~

~.

/

N (V

I OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12/04/82 COMPLETED BY W.G.Hairston,III TELEPHONE (205)899-5156 OPERATING STATUS

1. Unit Name: J Seph M. Farley - Unit 2 Notes
2. Reporting Period: November, 1982
1) Cumulative data since
3. Licensed Thermal Power (MWt):

2652 7/30/81, date of commer-860 cial operation.

4. Nameplate Rating (Gross MWe):

829 S. Design Electrical Rating (Net MWe):

854.7

6. Maximum Dependable Capacity (Gross MWe):

813.7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

9. Ib,er Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,if Any:

N/A (O'J This Month Yr..to.Date

' Cumulatise l

11. Hours in Reporting Period 720 8.016 11,737 f

!2. Number Of flours Reactor Was Critical 12.4 6,358.6 10,044.8 l

13. Reactor Resene Shutdown llours 0

97.6 138.4 0

6,254.2 9,920.7 l

14. Hours Generator On.Line
15. Unit Resene Shutdown Hours 0

0 0

0 15,955,657 64,400,880 a

16. Gross Thermal Energy Generated (MWH) 28

.___,,, 5,102,548 8,173,926

17. Gross Electrical Energy Generated (MWH)

-7,464 4,825,150 7,745,870

18. Net Electrical Energy Generated (MWH) 0.0 78.0 84.5 l
19. Unit Senice Factor
20. Unit Availability Factor 0.0 78.0 84.5

- 1.3 74.0 81.1

21. Unit Capacity Factor iUsing MDC Net)

- 1.3 72.6 79.6

22. Unit Capacity Factor (Using DER Net) 0.0 11.6 8.1
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date and Duration of Each1:

___ N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 12/03/82
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIAL CRITICALITY 5/06/81 5/08/81 fp

\\

INITI AL ELECTRICITY 5/24/81 5/25/81 l

COMMERCI A L OPERATION 8/01/81 7/30/81 (4/77 :

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNITNAME J.M.Farlev - Unit 2 DATE 1?/nu/a7 COMPLETED BY W.G.Hairston, III REPORT MONTig November TELEPilONE (205)899-5156

{

_h*

.! E

'h I

Licensec 6%

Cause & Corrective E'.E Action o No.

Date c.

3g g

jg5 Event r?

50 V

f

$ 2.,

5 j g5 g Repost

  • Prevent Recurrence 6

j 013 821101 S

720 C

1

-NA NA NA Unit outage was continued from 10/31/82 for refueling.

1 fi i

1 2

3 4

F: Furi.ed Reason:

Method:

Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data ti. Maintenance or Test 2-Manual Scram.

Entry Sheets for I.icensee C Refuehng 3 Automatic Scram.

Event Repor (LER) File (NUREG-D Regulatosy Restriction 4-Other (Explain) 0161)

E Operator Training & Ucense Examination F-Administ rative 5

G Opciational l.nor tlimplam) lisinhit I. Same Siance (9/17) 11 Oshes (lixplain) 1

l o.

9 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued through the month of November.

The following safety-related maintenance was performed in the month of November:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Cleaned, inspected and repaired miscellaneous valves in containment.

3.

Performed hydraulic snubber functional test and repaired snubbers as necessary.

4.

Repacked #2, #4, #6, #7 and #10 River Water pumps.

l

. s.-

-. :. :a, -

..~.~m a.

DOCKET NO. 50-364 UNIT 2

12/04/82

/

DA'II

(

COMPLETED BY W. C. Hairston, III TELEPl!ONE (205) 899-5156

)!OfG11 November DAY AVERACE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER I.EVEL (alwe-Ner)

(51we. Net) 0 0

I.

37 2

0 is 0

0 0

g9 3

^

4 0

20 0

0 0

5 21 0

0 g

6 7

0 3

0 0

g 0

24 0

0 9

25 10 0

26 0

O 0

II 27 0

0 12 73 0

13 0

9 0

0 14 30 0

e IS 3g I6 0

L INSTRUCIIONS On this form:. list the svenge daily umt power levelin MWe Net for each d:y in the reporting month. Compute to

, the nearest whole nc;2 wait.

(9(77) y

.

  • c -sum-

e I

OPERATING DATA REPORT DOCKET NO. 50-364 DATt 12/04/82 COMPLETED BY W.G.Hairston.III 2

TELEPHONE (205)899 5156 OPERATING STATUS Notes J seph M. Farley - Unit 2

1. Unit Name:

November, 1982

1) Cum 'ative data since
2. Reporting Period:
3. Licensed Thermal Power (MWt):

2652 7/30/81, date of commer-860 cial operation.

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):

854.7

6. Maximum Dependable Capacity (Gross MWe):

813.7

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

~

N/A

9. Power Level To Which Restricted lf Any (Net MWe):
10. Reasons For Restrictions,If Any:

N/A I

This Month Yr..to.Date Cuniulatise 720 8,016 11,737

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical.

12.4 6,358.6 10,044.8

~

13. Reactor Reserve Shutdown Hours 0

97.6 138.4 0

6,254.2 9,920.7

14. Hours Generator On.Line 0

0 0

15. Unit Rewrve Shutdown Hours 0

15,955,657 64,400,880

16. Gross Thermal Energy Generated (MWH) 28
17. Gross Electrical Energy Generated (MWH)

.,, 5,102,548 8,173,926

-7,464

-4,825,150 7,745,870

18. Net Electrical Energy Generated (MWH) 0.0 78.0 84.5
19. Unit Senice Factor 0.0 78.0 84.5
20. Unit Availability Factor

- 1.3 74.0 81.1

21. Unit Capacity Factor (Using MDC Net)

- 1.3 72.6 79.6

22. Unit Capacity Factor (Using DER Net) 0.0 11.6 8.1
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Erch):

N/A 12/03/82

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/08/81 INITI AL ELECTRICITY 5/24/81 5/25/81 COMMERCI AL OPER ATION 8/01/81 7/30/81 (9/77i

e DOCKET NO. 50-364 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAhlE J.M.Farlev - Unit 2 DATE 17/na/g7

~

COMPLETED BY W.G.Hairston, lII REPORT af0NTil November TELEPilONE (205)899-5156 i

.! p

}

E Licensec

,Eg h.

Cause & Currective No.

Daic g

3g jg5 Event g?

Q Action to mO

$0 Pacvent Recurrence fE 5

U gg =!

Report a u

8-2 6

013 821101 S

720 C

1 NA NA NA Unit outage was continued from 10/31/82 for refueling.'

t 4

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A-Fquipment Failure (Explain) 1 -Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.

Entry Sheets for I.icensee i

C.Rcfuchng 3 Autunutic Scram.

Event ReporI (i.ER) File INUREG-D-Regulatosy Restriction 4-Other (Explain) 0161)

E-Operator Training & Ucense Examination F-Administ rative 5

G Opciational I.nor (linplain)

INhibii ! Same Sousee 19/11) 11 Othe II mplain) l