JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued thrcugh the month of November.
The following safety-related maintenance was performed in the month of November:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Cleaned, inspected and repaired miscellaneous valves in containment.
3.
Performed hydraulic snubber functional test and repaired snubbers as necessary.
4.
Repacked #2, #4, #6, #7 and #10 River Water pumps.
i I
l 82121703ca 821213
~
I PDR ADOCK 05000364 R
4.-..,
,,...m..
.....,,. -. 3
. ~,.. s, m., c m m
-.m DOC)1T No. 50-364 UNIT 2
12/04/82 DATT.
(
t COSIPLETED BY W. G. Hairston, III
~
TELEPl!ONE (205) 899-5156 510fGli November DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE-Net )
(SIWE Net) 0 0
I.
37 2
0 13 0
0 0
g9 3
4 0
20 0
0 0
5 21 s-O 0
4 y
7 0
23 0
0 g
0 24 0
0-9 25 10 0
26 0
0 0
Ig 27 0
0 12 73 13 0
0
- 9 0
0 14 30 0
r*
IS 3g 16 0
l INSTR 11CITONS On this form:. list the avenge daily umt power !cvelin AlWe Net for esch d:y in the reporting inunth. Compute io
, the nearc.t whole nr;2 wait.
(997) l O
~.
aw
~
~.
/
N (V
I OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12/04/82 COMPLETED BY W.G.Hairston,III TELEPHONE (205)899-5156 OPERATING STATUS
- 1. Unit Name: J Seph M. Farley - Unit 2 Notes
- 2. Reporting Period: November, 1982
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2652 7/30/81, date of commer-860 cial operation.
- 4. Nameplate Rating (Gross MWe):
829 S. Design Electrical Rating (Net MWe):
854.7
- 6. Maximum Dependable Capacity (Gross MWe):
813.7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A N/A
- 9. Ib,er Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
N/A (O'J This Month Yr..to.Date
' Cumulatise l
- 11. Hours in Reporting Period 720 8.016 11,737 f
!2. Number Of flours Reactor Was Critical 12.4 6,358.6 10,044.8 l
- 13. Reactor Resene Shutdown llours 0
97.6 138.4 0
6,254.2 9,920.7 l
- 14. Hours Generator On.Line
- 15. Unit Resene Shutdown Hours 0
0 0
0 15,955,657 64,400,880 a
- 16. Gross Thermal Energy Generated (MWH) 28
.___,,, 5,102,548 8,173,926
- 17. Gross Electrical Energy Generated (MWH)
-7,464 4,825,150 7,745,870
- 18. Net Electrical Energy Generated (MWH) 0.0 78.0 84.5 l
- 19. Unit Senice Factor
- 20. Unit Availability Factor 0.0 78.0 84.5
- 1.3 74.0 81.1
- 21. Unit Capacity Factor iUsing MDC Net)
- 1.3 72.6 79.6
- 22. Unit Capacity Factor (Using DER Net) 0.0 11.6 8.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date and Duration of Each1:
___ N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 12/03/82
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIAL CRITICALITY 5/06/81 5/08/81 fp
\\
INITI AL ELECTRICITY 5/24/81 5/25/81 l
COMMERCI A L OPERATION 8/01/81 7/30/81 (4/77 :
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNITNAME J.M.Farlev - Unit 2 DATE 1?/nu/a7 COMPLETED BY W.G.Hairston, III REPORT MONTig November TELEPilONE (205)899-5156
{
_h*
.! E
'h I
Licensec 6%
Cause & Corrective E'.E Action o No.
Date c.
3g g
jg5 Event r?
50 V
f
$ 2.,
5 j g5 g Repost
- Prevent Recurrence 6
j 013 821101 S
720 C
1
-NA NA NA Unit outage was continued from 10/31/82 for refueling.
1 fi i
1 2
3 4
F: Furi.ed Reason:
Method:
Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data ti. Maintenance or Test 2-Manual Scram.
Entry Sheets for I.icensee C Refuehng 3 Automatic Scram.
Event Repor (LER) File (NUREG-D Regulatosy Restriction 4-Other (Explain) 0161)
E Operator Training & Ucense Examination F-Administ rative 5
G Opciational l.nor tlimplam) lisinhit I. Same Siance (9/17) 11 Oshes (lixplain) 1
l o.
9 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1982 The Cycle I - Cycle II Refueling Outage continued through the month of November.
The following safety-related maintenance was performed in the month of November:
1.
Performed miscellaneous maintenance on diesel generators.
2.
Cleaned, inspected and repaired miscellaneous valves in containment.
3.
Performed hydraulic snubber functional test and repaired snubbers as necessary.
4.
Repacked #2, #4, #6, #7 and #10 River Water pumps.
l
. s.-
-. :. :a, -
..~.~m a.
DOCKET NO. 50-364 UNIT 2
12/04/82
/
DA'II
(
COMPLETED BY W. C. Hairston, III TELEPl!ONE (205) 899-5156
)!OfG11 November DAY AVERACE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER I.EVEL (alwe-Ner)
(51we. Net) 0 0
I.
37 2
0 is 0
0 0
g9 3
^
4 0
20 0
0 0
5 21 0
0 g
6 7
0 3
0 0
g 0
24 0
0 9
25 10 0
26 0
O 0
II 27 0
0 12 73 0
13 0
- 9 0
0 14 30 0
e IS 3g I6 0
L INSTRUCIIONS On this form:. list the svenge daily umt power levelin MWe Net for each d:y in the reporting month. Compute to
, the nearest whole nc;2 wait.
(9(77) y
.
- c -sum-
e I
OPERATING DATA REPORT DOCKET NO. 50-364 DATt 12/04/82 COMPLETED BY W.G.Hairston.III 2
TELEPHONE (205)899 5156 OPERATING STATUS Notes J seph M. Farley - Unit 2
- 1. Unit Name:
November, 1982
- 1) Cum 'ative data since
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2652 7/30/81, date of commer-860 cial operation.
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
854.7
- 6. Maximum Dependable Capacity (Gross MWe):
813.7
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
~
N/A
- 9. Power Level To Which Restricted lf Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
N/A I
This Month Yr..to.Date Cuniulatise 720 8,016 11,737
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical.
12.4 6,358.6 10,044.8
~
- 13. Reactor Reserve Shutdown Hours 0
97.6 138.4 0
6,254.2 9,920.7
- 14. Hours Generator On.Line 0
0 0
- 15. Unit Rewrve Shutdown Hours 0
15,955,657 64,400,880
- 16. Gross Thermal Energy Generated (MWH) 28
- 17. Gross Electrical Energy Generated (MWH)
.,, 5,102,548 8,173,926
-7,464
-4,825,150 7,745,870
- 18. Net Electrical Energy Generated (MWH) 0.0 78.0 84.5
- 19. Unit Senice Factor 0.0 78.0 84.5
- 20. Unit Availability Factor
- 1.3 74.0 81.1
- 21. Unit Capacity Factor (Using MDC Net)
- 1.3 72.6 79.6
- 22. Unit Capacity Factor (Using DER Net) 0.0 11.6 8.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Erch):
N/A 12/03/82
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY 5/06/81 5/08/81 INITI AL ELECTRICITY 5/24/81 5/25/81 COMMERCI AL OPER ATION 8/01/81 7/30/81 (9/77i
e DOCKET NO. 50-364 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAhlE J.M.Farlev - Unit 2 DATE 17/na/g7
~
COMPLETED BY W.G.Hairston, lII REPORT af0NTil November TELEPilONE (205)899-5156 i
.! p
}
E Licensec
,Eg h.
Cause & Currective No.
Daic g
3g jg5 Event g?
Q Action to mO
$0 Pacvent Recurrence fE 5
U gg =!
Report a u
8-2 6
013 821101 S
720 C
1 NA NA NA Unit outage was continued from 10/31/82 for refueling.'
t 4
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A-Fquipment Failure (Explain) 1 -Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets for I.icensee i
C.Rcfuchng 3 Autunutic Scram.
Event ReporI (i.ER) File INUREG-D-Regulatosy Restriction 4-Other (Explain) 0161)
E-Operator Training & Ucense Examination F-Administ rative 5
G Opciational I.nor (linplain)
INhibii ! Same Sousee 19/11) 11 Othe II mplain) l