ML20070E555

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Nov 1982
ML20070E555
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/13/1982
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20070E557 List:
References
NUDOCS 8212170297
Download: ML20070E555 (1)


Text

I Malling Address

. e Alab ma Power Company 600 North 10th Street Post Offica Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

%";;'ds'TaA"l"' AlabamaPbwer the Soutix.Yn ekttrC SYStern December 13, 1982 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the November,1982 i

Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F.

Stolz to Mr. Alan R. Barton, dated October 21, 1977, a "Narra-tive Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very tr ly, N /V L%

F. L. Cl ayton , Jr.

FLCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies) 7 (1 copy)

Director, RII

{

i 8212170297 821213 PDR ADOCK 05000364 R PDR

_