Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059E741 + (ML20059E741)
- ML20059E742 + (ML20059E742)
- ML20059E743 + (ML20059E743)
- ML20059E746 + (ML20059E746)
- ML20059E749 + (ML20059E749)
- ML20059E750 + (ML20059E750)
- IR 05000498/1989047 + (ML20059E752)
- ML20059E753 + (ML20059E753)
- ML20059E754 + (ML20059E754)
- IR 05000334/1990014 + (ML20059E756)
- 05000285/LER-1993-018, :on 931206,reactor Trip Occurred Due to Turbine Trip on Low Hydraulic Fluid Pressure.Caused by Inadequate Design of ECN 93-162.Configuration of EHC Sys Tubing Corrected + (ML20059E758)
- ML20059E759 + (ML20059E759)
- ML20059E763 + (ML20059E763)
- ML20059E764 + (ML20059E764)
- ML20059E765 + (ML20059E765)
- ML20059E766 + (ML20059E766)
- ML20059E768 + (ML20059E768)
- 05000317/LER-1993-008, :on 931203,determined Removal of EDG Room Shield Door Could Render Other EDGs Inoperable.Caused by Lack of Procedural Controls.Maint Procedure Will Be Generated W/Appropriate Precautions + (ML20059E769)
- ML20059E771 + (ML20059E771)
- 05000344/LER-1990-032, :on 900803,discovered That Channel Check for High Range Effluent Iodine Samplers Not Conducted Per Tech Spec 3/4.3.3.11.Caused by Personnel Error.Periodic Operating Test Revised to Require Verification of Flow + (ML20059E776)
- ML20059E777 + (ML20059E777)
- ML20059E780 + (ML20059E780)
- JPN-90-060, Forwards Info to Satisfy 900716 Commitment Re Switchgear Deficiency,Per SSFI Insp Rept 50-333/89-80.Waiver Requested Re Design Requirements for Three Phase Bolted Fault Criteria for Switchgear Configuration for Diesel Generator Testing + (ML20059E781)
- ML20059E784 + (ML20059E784)
- ML20059E789 + (ML20059E789)
- ML20059E790 + (ML20059E790)
- ML20059E795 + (ML20059E795)
- PNO-I-90-071, on 900829,resident Inspectors Informed That Concentration Value of 29,000 Pci/Liter of Tritium Found in Aug Sample of Groundwater Monitoring Station MS-2.No Tech Spec Release Limits Exceeded + (ML20059E797)
- ML20059E798 + (ML20059E798)
- ML20059E799 + (ML20059E799)
- ML20059E800 + (ML20059E800)
- ML20059E801 + (ML20059E801)
- BVY-93-149, Submits Response to Request for Addl Info Re Atmospheric Release Advisory Capability + (ML20059E802)
- 05000259/LER-1990-012-01, :on 900801,high Pressure Fire Protection Sys Fire Pump Start Logic Not Functionally Tested to Verify That Fire Protection Sys Pumps Maintain 120 Psig.Cause Unknown. Corrective Actions Will Be Determined + (ML20059E803)
- ML20059E804 + (ML20059E804)
- ML20059E805 + (ML20059E805)
- ML20059E806 + (ML20059E806)
- ML20059E808 + (ML20059E808)
- ML20059E809 + (ML20059E809)
- ML20059E811 + (ML20059E811)
- IR 05000373/1990020 + (ML20059E813)
- B14712, Informs of Certain Developments Germane to 930603 Commitment to Conduct Addl Training for Individuals Noted in NOV & Demand for Info Re Suitability of Certain Supervisors in Nuclear Organization Due to Role in Stated Matter + (ML20059E814)
- NRC-93-0148, Requests Registration as User of Chem-Nuclear Sys,Inc Model CNS 14-170,series III Package + (ML20059E815)
- 05000382/LER-1993-007-01, :on 931207,discovered That Chemistry Samples Were Not Analyzed Due to Procedural non-compliance.Trained & Counseled Responsible Technician + (ML20059E817)
- ML20059E818 + (ML20059E818)
- ML20059E819 + (ML20059E819)
- ML20059E820 + (ML20059E820)
- ST-HL-AE-4664, Provides Status of Commitment Made in Response to Notice of Violation from Insp Repts 50-498/92-24 & 50-499/92-24 + (ML20059E821)
- ML20059E822 + (ML20059E822)
- ML20059E823 + (ML20059E823)
- HL-1191, Monthly Operating Repts for Aug 1990 for Hatch Units 1 & 2 + (ML20059E825)