Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059D936 + (ML20059D936)
- ML20059D937 + (ML20059D937)
- ML20059D941 + (ML20059D941)
- ML20059D944 + (ML20059D944)
- ML20059D947 + (ML20059D947)
- ML20059D948 + (ML20059D948)
- ML20059D951 + (ML20059D951)
- 05000352/LER-1993-010-04, :on 930820,actuation of PCRVICS & ESF Occurred After Reactor Enclosure Exhaust Plenum Radiation Monitor Spuriously Tripped.Cause Not Determined.Sensor Converter for Radiation Monitor Replaced During Testing + (ML20059D956)
- ML20059D958 + (ML20059D958)
- ML20059D959 + (ML20059D959)
- ML20059D960 + (ML20059D960)
- ML20059D961 + (ML20059D961)
- ML20059D962 + (ML20059D962)
- ML20059D964 + (ML20059D964)
- 05000317/LER-1993-007-01, :on 931229,performance Test Indicated Possibility of SRW Heat Exchanger Inoperability.Caused by Original Design Calculations Assuming Min SRW Flow Was Not Limiting Case.Hxs Determined Operable + (ML20059D966)
- ML20059D968 + (ML20059D968)
- ML20059D970 + (ML20059D970)
- ML20059D971 + (ML20059D971)
- ML20059D975 + (ML20059D975)
- ML20059D976 + (ML20059D976)
- LD-90-065, Application for Amend to License SNM-33,removing Condition 38 & Authorizing Performance of Activities in Bldg 253 + (ML20059D977)
- ST-HL-AE-3550, Forwards Semiannual fitness-for-duty Program Performance Rept for Jan-June 1990,per 10CFR26.71(d) + (ML20059D979)
- IR 05000373/1993028 + (ML20059D981)
- PY-CEI-NRR-1201, Forwards First Semiannual fitness-for-duty Rept for Plant for 900103-0630,per 10CFR26.71(d) Requirements + (ML20059D982)
- ML20059D983 + (ML20059D983)
- ML20059D984 + (ML20059D984)
- ML20059D985 + (ML20059D985)
- IR 05000327/1993047 + (ML20059D986)
- ML20059D989 + (ML20059D989)
- ST-HL-AE-3540, Provides Schedule Under Which Facility Turbine Components Inspected for Functional Integrity.Required Insp Intervals Calculated to Maintain Probability of Missile Generation for Each Low Pressure Rotor + (ML20059D990)
- ML20059D993 + (ML20059D993)
- ML20059D995 + (ML20059D995)
- 05000278/LER-1990-009-03, :on 900727,discovered That Recirculation Loop Temp Increased in Excess of Allowable Heat Up Rate & Temp Reading Not Recorded at Required Intervals.Caused by Personnel Error & Procedural Deficiency + (ML20059D998)
- ML20059E000 + (ML20059E000)
- ML20059E001 + (ML20059E001)
- ML20059E003 + (ML20059E003)
- ML20059E007 + (ML20059E007)
- ML20059E009 + (ML20059E009)
- ML20059E011 + (ML20059E011)
- ML20059E012 + (ML20059E012)
- 05000373/LER-1993-019-03, :on 931204,TS Surveillance Missed Due to Inoperability of SRVs 1B21-F013B & 1B21-F013J.Caused by Misinterpretation of TS Requirements.Correct ASME XI Section Determined & Procedures Revised + (ML20059E013)
- ML20059E014 + (ML20059E014)
- ML20059E015 + (ML20059E015)
- ML20059E019 + (ML20059E019)
- ML20059E021 + (ML20059E021)
- ML20059E024 + (ML20059E024)
- ML20059E025 + (ML20059E025)
- ML20059E026 + (ML20059E026)
- ML20059E028 + (ML20059E028)
- ML20059E029 + (ML20059E029)
- ML20059E031 + (ML20059E031)