Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058N764 + (ML20058N764)
- ML20058N765 + (ML20058N765)
- 05000293/LER-1990-012, :on 900712,discovered Two Radioactive Sources Not Leak Checked within Tech Spec Required Interval.Caused by Procedural Weakness.Sources Inventoried & Leak Checked & Procedure 6.6-010 Will Be Revised + (ML20058N766)
- ML20058N767 + (ML20058N767)
- ML20058N769 + (ML20058N769)
- B13079, Proposed Tech Specs Changes Per Generic Ltr 87-09 + (ML20058N772)
- ML20058N773 + (ML20058N773)
- ML20058N774 + (ML20058N774)
- ST-HL-AE-4603, Forwards STP 1994-98 Business Plan & Matrix Correlating NRC Det 930610 Rept Findings & Observations W/Actions & Tasks in Business Plan & Operational Readiness Plan + (ML20058N776)
- ML20058N777 + (ML20058N777)
- BECO-90-095, Informs That Kn Taylor Permanently Reassigned to Nuclear Training Dept as of 900717.Taylor Will Remain in Position Which Does Not Require License Certification + (ML20058N778)
- ML20058N779 + (ML20058N779)
- ML20058N782 + (ML20058N782)
- ML20058N783 + (ML20058N783)
- ML20058N784 + (ML20058N784)
- ML20058N787 + (ML20058N787)
- RC-93-0256, Forwards Newly Issued NPDES Permit SC0030856.Permit Ensures That All Discharges from Plant to Monticello Reservoir Meets Federal & State Guidelines + (ML20058N789)
- ML20058N790 + (ML20058N790)
- ML20058N791 + (ML20058N791)
- ML20058N792 + (ML20058N792)
- ML20058N795 + (ML20058N795)
- ML20058N796 + (ML20058N796)
- ML20058N797 + (ML20058N797)
- NRC-93-0108, Forwards Rev 6a to App 9A.6, UFSAR, Being Made in Accordance W/Fire Protection Program Requirements Established by Operating License Amend 62 + (ML20058N798)
- ML20058N800 + (ML20058N800)
- ML20058N802 + (ML20058N802)
- ML20058N803 + (ML20058N803)
- ML20058N805 + (ML20058N805)
- ML20058N806 + (ML20058N806)
- ML20058N807 + (ML20058N807)
- ML20058N808 + (ML20058N808)
- ML20058N809 + (ML20058N809)
- ML20058N811 + (ML20058N811)
- ML20058N812 + (ML20058N812)
- ML20058N813 + (ML20058N813)
- ML20058N814 + (ML20058N814)
- ML20058N815 + (ML20058N815)
- 05000373/LER-1993-015-06, :on 930914,unit 1 Scram Occurred & off-site Power Lossed Due to Bus Duct Water Intrusion.Onsite Review 93-048 Initiated + (ML20058N816)
- ML20058N818 + (ML20058N818)
- ML20058N820 + (ML20058N820)
- 05000331/LER-1993-007, :on 930921,unexpected Shutdown Cooling Isolation Occurred Due to Procedural Inadequacies.Reopened Valve & Revised Procedure + (ML20058N821)
- ML20058N822 + (ML20058N822)
- ML20058N823 + (ML20058N823)
- ML20058N824 + (ML20058N824)
- ML20058N825 + (ML20058N825)
- ML20058N826 + (ML20058N826)
- NUREG-1339, Summarizes Resolution of GI 29 Bolting Degradation or Failure in Nuclear Power Plants + (ML20058N828)
- 05000353/LER-1993-010-02, :on 930909,notified That Stroke Time SR May Not Have Been Performed Prior to Declaring Containment Isolation Valve Operable on 930721 Due to Personnel Error.Valve Satisfactorily Tested on 930909 + (ML20058N829)
- ML20058N831 + (ML20058N831)
- HNP-93-869, Advises of Plans to Remove Administration Bldg from Protected Area & to Reconfigure That Portion of Protected Area Perimeter Affected by Activity + (ML20058N836)
- ML20058N838 + (ML20058N838)