ML20058N777
| ML20058N777 | |
| Person / Time | |
|---|---|
| Site: | 07000036 |
| Issue date: | 12/07/1993 |
| From: | Pierson R NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Rode J ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| Shared Package | |
| ML20058N781 | List: |
| References | |
| TAC-L21644, NUDOCS 9312220259 | |
| Download: ML20058N777 (2) | |
Text
.
ga arc %
t UNITED STATES
' [g.kT j
NUCLEAR REGULATORY COMMISSION l
j WASHINGTON, D.C. 20555-0001
%. *)* * #
DEC 7 1993 1
Docket 70-36 License SNM-33 Amendment 25 Mr. J. A. Rode, Plant Manager Hematite Nuclear Fuel Manufacturing
{
Combustion Engineering, Inc.
P.O. Box 107 Hematite, MO 63047
Dear Mr. Rode:
SUBJECT:
EMERGENCY PLAN (TAC NO. L21644) in accordance with your amendment application dated October 28, 1993, and pursuant to Part 70 to Title 10 of the Code of Federal Regulations, Materials License SNM-33 is hereby amended to incorporate CE's Emergency Plan.
The Plan should be implemented 180 days from the date of this amendment. At that time, the Plan will replace your current NRC approved Radiological Contingency Plan which is required by License Condition S-9.
Due to a reorganization at the Nuclear Regulatory Commission, we have i
reformatted your license by combining into one document the safety and i
safeguards license conditions. Although this licensing action only addresses 1
changes to your Safety Conditions, for convenience, we are reissuing the complete license.
In addition, those license conditions that have been complied with have been deleted (formerly Conditions 16.18, and 24a).
Accordingly, Safety Condition S-1 of Materials License No. SNM-33 is revised to include the date of October 28, 1993.
To reflect our Division's reorganization, License Conditions S-3 and S-3 have been revised as follows to update attachment descriptions:
1 S-3 Sealed byproduct material sources shall be subject to the leak testing and actions specified in the attached
" License Condition For Leak Testing Sealed Byproduct Material Sources," dated April 1993.
S-4 Release of equipment, facilities, or packages to the unrestricted area or to uncontrolled areas onsite shall be in accordance with the attached " Guidelines for l
Decontamination of Facilities and Equipment Prior to Release for Unrestricted Use or Termination of Licenses for Byproduct, Source, or Special Nuclear Material," dated April 1993.
2003?2 9312220259 931207 i
\\
PDR ADOCK 07000036 c
C PDR u
l Combustion Engineering 2
If you have questions about this document, please contact Sean Soong, Project
{
Manager, on (301) 504-2604.
Enclosed is a copy of the complete License SNM-33, in the new format, which incorporates changes to the Safety Conditions. Also enclosed is the Safety Evaluation Report, which includes the Categorical Exclusion determination.
Sincerely, ORIGINALSIGNEDBY l
RobertC.Pierson Robert C. Pierson, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS
Enclosures:
1.
License SNM-33 2.
Safety Evaluation Report I
cc w/encls:
Mr. J. F. Conant, Manager Nuclear Materials Licensing Distribution w/encls. (Control No. 2805)
Docket No. 70-36 PDR/LPDR NRC File Center NMSS R/F FCSS R/F Region III SHO GFrance, RIII Madams FCLB R/F FCLS2 R/F LTenEyck MMessier, LFDCB JRoth,FCOB FG(#
2 b FCLB Jh FCLB IC-OFC FCLB 2 E SSoong;((
Of[T)arge Madams 7/h MTok h l
NAME
/93 12/b/93 12/ 4/93
_DATE 1216 /93 12/ b 0FC
- FCLB, E
RPibhpon NAME
\\'
DATE 12(1 /93 C = COVER E = COVER & ENCLOSURE N = NO COPY