Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000254/LER-1993-018-03, :on 930831,APRM 4 Bypassed While Companion IRM 16 Also Bypassed Due to Work Practices.Submitted TS Upgrade Program + (ML20058M319)
- 05000482/LER-1993-008, :on 930416,flux Doubling Circuit Blocked Due to Personnel Error Re Misunderstanding of Applicability of Ts. Issued Memo & Initiated Change to TS Bases + (ML20058M322)
- ML20058M326 + (ML20058M326)
- ML20058M328 + (ML20058M328)
- ML20058M330 + (ML20058M330)
- ML20058M331 + (ML20058M331)
- IR 05000352/1990019 + (ML20058M337)
- IR 05000461/1993017 + (ML20058M338)
- ML20058M341 + (ML20058M341)
- ML20058M343 + (ML20058M343)
- ML20058M344 + (ML20058M344)
- ML20058M345 + (ML20058M345)
- PY-CEI-NRR-1707, Provides Response to Suppl 5 to GL 89-10, Inaccuracy of Motor-Operated Valve Diagnostic Equipment + (ML20058M346)
- ML20058M347 + (ML20058M347)
- ML20058M349 + (ML20058M349)
- ML20058M350 + (ML20058M350)
- ML20058M354 + (ML20058M354)
- ML20058M356 + (ML20058M356)
- ML20058M358 + (ML20058M358)
- IR 05000156/1993002 + (ML20058M361)
- PNO-I-90-061, on 900806,plant Operators Manually Scrammed Reactor Due to High Vibration on Main Turbine Bearing.Caused by Blank Flange Left in Oil Supply Line to Bearing.Resident Inspectors Following Licensee Actions + (ML20058M364)
- ML20058M367 + (ML20058M367)
- ML20058M369 + (ML20058M369)
- JPN-93-070, Proposed Tech Specs,Revising TS Re Esws Pump Surveillance Requirement 4.11.D.1 + (ML20058M371)
- PNO-I-90-062, on 900806,containment Unidentified Leak Rate Exceeded Tech Spec Limit.Caused by Water Introduction Into Drywell.Licensee Began Plant Shutdown,Vented Drywell & Evaluated Plant Conditions + (ML20058M372)
- ML20058M374 + (ML20058M374)
- ML20058M375 + (ML20058M375)
- ML20058M377 + (ML20058M377)
- ML20058M379 + (ML20058M379)
- PNO-II-90-041, on 900726,medical Technician Noticed Prime Alert Light on & Blinking Indicating Source Not Completely in Sheilded Position.Wholebody Dose Estimates for Physicist & Technician Is 30 Mrem & 190 Mrem,Respectively + (ML20058M384)
- B14697, Provides Update to Staff W/Respect to Completion Schedule of MOV Testing Program at Hnpp & Mnps Units 1-3 Being Implemented Per GL-89-10 + (ML20058M385)
- IR 05000289/1989099 + (ML20058M388)
- IR 05000331/1993011 + (ML20058M390)
- ML20058M393 + (ML20058M393)
- 05000254/LER-1993-002-01, :on 930302,determined Average .25 Inches of Water Cannot Be Maintained in Secondary Containment Per Ts. Caused by Testing Deficiency.Procedure Qts 160-5 Will Be Changed to Adjust for Test Deficiency + (ML20058M395)
- ML20058M398 + (ML20058M398)
- 3F0993-10, Responds to GL 89-10,suppl 5, Inaccuracy of MOV Diagnostic Equipment, Re Confirmation of Proper Size or to Establish Settings for MOV + (ML20058M399)
- ML20058M401 + (ML20058M401)
- ML20058M402 + (ML20058M402)
- ML20058M404 + (ML20058M404)
- ML20058M405 + (ML20058M405)
- ML20058M406 + (ML20058M406)
- ML20058M407 + (ML20058M407)
- ML20058M408 + (ML20058M408)
- IR 05000374/1993025 + (ML20058M409)
- ML20058M410 + (ML20058M410)
- ML20058M411 + (ML20058M411)
- ML20058M412 + (ML20058M412)
- LD-93-174, Responds to Request of NRC Staff & Forwards Five Copies of Selected CESSAR-DC Parameters & Assumptions Addressed in Certified Design Matl for System 80+ Standard Plant Design + (ML20058M413)
- ML20058M415 + (ML20058M415)
- ML20058M418 + (ML20058M418)