ML20058M401
| ML20058M401 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 09/27/1993 |
| From: | Axelson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Delgeorge L COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20058M403 | List: |
| References | |
| NUDOCS 9310050203 | |
| Download: ML20058M401 (3) | |
See also: IR 05000374/1993025
Text
Oco
l
...
-
,
.. .
SEP 2 71993
'
Docket No. 50-374
License No. NPF-18
EA 93-235
.
Commonwealth Edison Company
-
,
ATTN: Mr. L. O. DelGeorge, Vice President
Nuclear Oversight and Regulatory
Services
Executive Towers West III
1400 Opus Place, Suite 300
Downers Grove, IL 60515
Dear Mr. DelGeorge:
<
s
SUBJECT:
SPECIAL RADIATION PROTECTION INSPECTION AT LASALLE COUNTY STATION
This refers to the special safety inspection conducted by Mr. P. L. Louden,
'
Mr. R. A. Paul, and others of this office on September 8 through 14, 1993.
The inspection included a review of activities authorized for your LaSalle
facility. At the conclusion of the inspection, the findings were discussed
with those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report.
The
purpose of the inspection was to review an incident which occurred during
'
reactor vessel disassembly as part of your refueling outage activities for
R
LaSalle's Unit 2 reactor. The inspection consisted of a selective examination
of procedures and representative records, interviews with personnel, and
observation of activities in progress.
A significant spread of contamination occurred while performing reactor vessel
disassembly work. The incident resulted in the contamination of twenty-two
workers, seventeen of which were internally contaminated.
In addition,
several areas of the Unit 2 reactor building were also contaminated as a
-
result of this event. Although no exposures in excess of regulatory limits
<
occurred, significant rianning, procedural adherence, and job performance
problems were noted during the inspection.
Based on the results of this inspection, three apparent violations were
'
identified in the radiological controls area and are being considered for
escalated enforcement action in accordance with the " General Statement of
i
Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy), 10 CFR Part 2 Appendix C.
Accordingly, no Notice of Violation is currently being
'
issued for these inspection findings.
In addition, please be advised that the
number and characterization of the' apparent violations described in the
enclosed report may change as a result of further NRC review.
An enforcement conference to discuss these apparent violations has been
scheduled for October 5, 1993.
The decision to hold an enforcement conference
does not mean that the NRC has determined that a violation has occurred or
7
i
go050203930927
B
1
l
ADOCK 05000374
Ed
G
y
i
.
-
-
.--
- -
-,
...
-
-
- _
-
.
-
.
.
.
. .
SEP 2 71993
Commonwealth Edison Company
2
j
.
.
that enforcement action will be taken. The purpose of this conference is to.
discuss the . apparent violations, their cause and safety significance; to
provide you the opportunity to point.out any errors in our inspection report;
and to provide an opportunity for you to present your proposed corrective
action.
In addition, this is an opportunity for you to provide any
information concerning your perspectives on 1) the severity of the violations,
2) the application of the factors that the NRC considers when it determines
'
the amount of a civil penalty that may be assessed in accordance with Section
VI.B.2 of the Enforcement Policy, and 3) any other application of the-
Enforcement Policy to this case, including the exercise of discretion in
i
accordance with Section VII.
You will be advised by separate correspondence
of the results of our deliberations on this matter. No response regarding
these apparent violations is required at this time.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of
.
this letter and its enclosures will be placed in the NRC Public Document Room.
!
Sincerely,
Original Signed by Roy i Caniano
.
W. L. Axelson, Director
l
Division of Radiation Safety and
Safeguards
,
Enclosure:
Inspection Report
f
No. 50-374/93025(DRSS)
!
cc w/ enclosure.
W. Murphy, Site Vice President
,
J. Schmeltz, Acting Station Manager
J. Lcckwood, Regulatory Assurance
Supervisor
,
D. Farrar, Nuclear Regulatory
l
Services Manager
>
OC/LFDCB
Resident Inspectors LaSalle
i
Dresden, Quad Cities
i
Richard Hubbard
i
J. W. McCaffrey, Chief, Public
'
Utilities Division
!
Licensing Project Manager, NRR
l
J. Lieberman, OE
l
J. Goldberg, 0GC
J. Partlow, NRR
Robert Newmann. Office of Public
Counsel
i
1
State Liaison Officer
Chairman, Illinois Commerce
Commission
i
. .
-
. _ _
.
. .
.
..
._
. . _ . .
_ . . _
_
. . _ . _ .
-
.
_
.
.
. .
SEP 2 71993
bec w/ enclosure:
-
PUBLIC
!
!
~i
f
!
i
.
'>
i
,
t
i
!
!
j
R II$.p%
1
RIII
RIII
RIII
RII
RII
, , . . ;[
konh@
to en7jp
Pau
Ko T
e
e1
)e e
Ax
f!r D
J/p/p
q'
"Q
09/1'/93