Forwards Insp Rept 50-331/93-11 on 930726-29,0817-20,24-26 & 0914-15.No Violations Noted
ML20058M377
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/30/1993
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20058M380 List:
References
NUDOCS 9310050141
Download: ML20058M377 (2)


See also: IR 05000331/1993011

Text

..

. . . ,

-

---

.

<

.

['p*"4 k

NUCLEAR REGULATORY COMMISSION

UNITED STATES

9

o

REGION lil

1

b

j3

<E

799 ROOSEVELT ROAD

i

%

3

o ;

[

'

GLEN ELLYN ILUNOIS 6o137-5927

j

  • ***

SEP 3 01993

1

Docket No. 50-331

Iowa Electric Light and Power

Company

ATTN:

Mr. Lee Liu, President

and Chief Executive Officer

IE Towers

P. O. Box 351

'

Cedar Rapids, IA 52406

Dear Mr. Liu:

This refers to the inspection conducted by Mr. J. F. Schapker of this office

on July 26 through September 15, 1993. The inspection included a review of

activities authorized for your Duane Arnold Energy Center. The focus of this

inspection was your inservice inspection efforts. At the conclusion of the

,

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The purpose of the inspection was to determine

whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

No violations of NRC requirements were identified during the course of this

inspection.

i

in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

G. C. Wright, Chief

,

Engineering Branch

'

Enclosure:

Inspection

Report No. 50-331/930ll(DRS)

See Attached Distribution

9310050141 930930

i

"

PDR

ADOCK 05000331

l l

0

PDR

p

'0 1

(

. _ .

-

_ _ .

_ .

_

._

._

m ..

.

'

-,

.

..

.!

I

lowa E'lectric Light and

2

SEP 3 01993

,

Power Company

.

i

i

!

Distribution

- !

,

!

cc w/ enclosure:

i

D. Wilson, Plant

i

Superintendent-Nuclear

j

K. Young, Manager,

'

Nuclear Licensing

l

-OC/LFDCB

Resident Inspector, RIII

Stephen Brown, Iowa Utilities

l

Board

!

Licensing Project Manager, NRR.

,

t

I

,

B

l

!

!

.

h

t

6

I

i

!

4

- 1

!

I

1

. . . . .

_

--

-. ,

. _ _ , - - ,

. . , _ , , , . . - , , .