ML20058M330
| ML20058M330 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 09/28/1993 |
| From: | Hague R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jamila Perry ILLINOIS POWER CO. |
| Shared Package | |
| ML20058M333 | List: |
| References | |
| NUDOCS 9310050110 | |
| Download: ML20058M330 (2) | |
See also: IR 05000461/1993017
Text
_ _ ___ _ __ _ ___,__---.-_____________
_ _ _ _ _ _
_
_ - - - - - - .
_ - - - - - . _ ,
-
-
tp
.
d()k
SEP 2 81993
Docket No. 50-461
l
Illinois Power Company
ATTN: Mr. J. S. Perry
Senior Vice President
Clinton Power Station
Mail Code V-275
Post Office Box 678
Clinton, IL 61727
SUBJECT:
NRC INSPECTION REPORT NO. 50-461/93017(DRP)
Dear Mr. Perry:
This refers to the inspection conducted by Messrs. P. G. Broch nan, F. L. Brush,
and C. J. Phillips of this office on August 10 through September 13, 1993. The
inspection included a review of authorized activities for your Clinton Power
Station facility.
At the conclusion of the inspection, the findings were
l
discussed with those members of your staff identified in the enclosed report.
'
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of a selective examination of procedures and
l
representative records, observations of activities in progress, and-interviews-
I
with personnel.
Na violations of HRC requirements were identified during the course of this
inspection.
However, we do note two areas for your continued attention. First, the depth of
the engineering department's recent evaluations of the plant fire zone loadings
and the pressure transients in the shutdown service water system was good.
However, the initial evaluation of the pressure transient issue in 1991 and 1992
was weak. Second, information obtained by quality assurance inspectors was not
always included in final audit reports.
While the responsible supervisor _ was
aware of the concerns, senior management was not and missed opportunities to gain
a better understanding of the facility and its personnel.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC Public
Document Room.
-)
0400?;
9310050110 930928
7
1
ADOCK 05000461
I6
V
O
0
'
.
..
.
Illinois Power Company
2
SEP 2 81993
I
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" original sic:nce by r, t,
g,g.,.,
Richard L. Hague, Chief
Reactor Projects Section 1C
Enclosures:
Inspection Report
'
No. 50-461/93017(DRP)
cc w/ enclosure:
J. Cook, Vice President and Manager,
Clinton Power Station
R. Phares, Director, Licensing
OC/LFDCB
,
Resident Inspectors, Clinton,
Dresden, LaSalle, Quad Cities
Licensing Project Manager, NRR
J. W. McCaffrey, Chief, Public
Utilities Division
R. Newmann, Office of Public
Counsel, State of Illinois Center
!
S. Zabel, Esquire, Schiff, Hardin &
Waite
K. Berry, Licensing Services Manager,
l
General Electric Company
Chairman, DeWitt County Board
State Liaison Officer
Chairman, Illinois Commerce Commission
R. Rosano, NRR
!
bec~ PU SL lC - 1E0 )
,
!
.
t
RIII
RIII
III
+
ptA.
pp
-
7
McMurtray
Hausman
r
c-
ague
'
9 11-93
0,\\2aVO
9/>fM
e