Forwards Insp Rept 50-461/93-17 on 930810-0913.No Violations Noted
ML20058M330
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/28/1993
From: Hague R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20058M333 List:
References
NUDOCS 9310050110
Download: ML20058M330 (2)


See also: IR 05000461/1993017

Text

_ _ ___ _ __ _ ___,__---.-_____________

_ _ _ _ _ _

_

_ - - - - - - .

_ - - - - - . _ ,

-

-

tp

.

d()k

SEP 2 81993

Docket No. 50-461

l

Illinois Power Company

ATTN: Mr. J. S. Perry

Senior Vice President

Clinton Power Station

Mail Code V-275

Post Office Box 678

Clinton, IL 61727

SUBJECT:

NRC INSPECTION REPORT NO. 50-461/93017(DRP)

Dear Mr. Perry:

This refers to the inspection conducted by Messrs. P. G. Broch nan, F. L. Brush,

and C. J. Phillips of this office on August 10 through September 13, 1993. The

inspection included a review of authorized activities for your Clinton Power

Station facility.

At the conclusion of the inspection, the findings were

l

discussed with those members of your staff identified in the enclosed report.

'

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of a selective examination of procedures and

l

representative records, observations of activities in progress, and-interviews-

I

with personnel.

Na violations of HRC requirements were identified during the course of this

inspection.

However, we do note two areas for your continued attention. First, the depth of

the engineering department's recent evaluations of the plant fire zone loadings

and the pressure transients in the shutdown service water system was good.

However, the initial evaluation of the pressure transient issue in 1991 and 1992

was weak. Second, information obtained by quality assurance inspectors was not

always included in final audit reports.

While the responsible supervisor _ was

aware of the concerns, senior management was not and missed opportunities to gain

a better understanding of the facility and its personnel.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC Public

Document Room.

-)

0400?;

9310050110 930928

7

1

PDR

ADOCK 05000461

I6

V

O

PDR

0

'

.

..

.

Illinois Power Company

2

SEP 2 81993

I

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" original sic:nce by r, t,

g,g.,.,

Richard L. Hague, Chief

Reactor Projects Section 1C

Enclosures:

Inspection Report

'

No. 50-461/93017(DRP)

cc w/ enclosure:

J. Cook, Vice President and Manager,

Clinton Power Station

R. Phares, Director, Licensing

OC/LFDCB

,

Resident Inspectors, Clinton,

Dresden, LaSalle, Quad Cities

Licensing Project Manager, NRR

J. W. McCaffrey, Chief, Public

Utilities Division

R. Newmann, Office of Public

Counsel, State of Illinois Center

!

S. Zabel, Esquire, Schiff, Hardin &

Waite

K. Berry, Licensing Services Manager,

l

General Electric Company

Chairman, DeWitt County Board

State Liaison Officer

Chairman, Illinois Commerce Commission

R. Rosano, NRR

!

bec~ PU SL lC - 1E0 )

,

!

.

t

RIII

RIII

III

+

ptA.

pp

-

7

McMurtray

Hausman

r

c-

ague

'

9 11-93

0,\\2aVO

9/>fM

e