Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20057A209 + (ML20057A209)
- ML20057A210 + (ML20057A210)
- ML20057A214 + (ML20057A214)
- ML20057A215 + (ML20057A215)
- ML20057A216 + (ML20057A216)
- U-602182, Informs That in Accordance w/10CFR171 & Invoice AT-0435-93,util Submitting $942,500 for Fourth Installment of Annual Fee for FY93 by Means of Electronic Transfer Scheduled for 930920 + (ML20057A217)
- ML20057A218 + (ML20057A218)
- 05000395/LER-1993-004, :on 930629,missed Surveillance Occurred,Per TS 4.3.2.1,Table 4.3-2.2.b.Caused by Personnel Error in Documenting Test Discrepancy.Operations Personnel Took Part in Discussion of Importance of post-test + (ML20057A220)
- ML20057A221 + (ML20057A221)
- ML20057A222 + (ML20057A222)
- ML20057A223 + (ML20057A223)
- 05000278/LER-1993-005-02, :on 930809,HPCI Sys Declared Inoperable Due to Defective Flow Controller.Flow Controller Removed,All Potentiometers & Boards Cleaned,Flow Controller Reinstalled & Necessary Testing & Tuning Performed + (ML20057A228)
- ML20057A229 + (ML20057A229)
- ML20057A230 + (ML20057A230)
- ML20057A231 + (ML20057A231)
- ML20057A232 + (ML20057A232)
- 05000361/LER-1993-005, :on 930810,identified Improper Configuration of Units 2 & 3 MSIV Enclosure Blowout Panels Due to Inadequate MP for Installation.Restored Blowout Panels to Operability on 920930 + (ML20057A233)
- ML20057A234 + (ML20057A234)
- ML20057A235 + (ML20057A235)
- ML20057A236 + (ML20057A236)
- ML20057A237 + (ML20057A237)
- ML20057A238 + (ML20057A238)
- PNO-II-93-042, on 930830,NRC Entered Monitoring Mode, Responding to Hurricane Emily,Located SE of Brunswick Plant. Inspectors Observing Licensee Preparations.Region II Informed States of Nc & VA of Activity + (ML20057A240)
- ML20057A241 + (ML20057A241)
- ML20057A242 + (ML20057A242)
- ML20057A243 + (ML20057A243)
- ML20057A245 + (ML20057A245)
- ML20057A247 + (ML20057A247)
- ML20057A249 + (ML20057A249)
- ML20057A250 + (ML20057A250)
- ML20057A251 + (ML20057A251)
- ML20057A253 + (ML20057A253)
- ML20057A254 + (ML20057A254)
- ML20057A255 + (ML20057A255)
- ML20057A257 + (ML20057A257)
- ML20057A258 + (ML20057A258)
- ML20057A259 + (ML20057A259)
- ML20057A260 + (ML20057A260)
- ML20057A263 + (ML20057A263)
- ML20057A264 + (ML20057A264)
- ML20057A265 + (ML20057A265)
- ML20057A266 + (ML20057A266)
- ML20057A267 + (ML20057A267)
- ML20057A268 + (ML20057A268)
- ML20057A269 + (ML20057A269)
- ML20057A271 + (ML20057A271)
- ST-HL-AE-4556, Forwards South Texas Project Operational Readiness Plan Describing Actions Prior to Resumption of Power Operation & Method Used During Start Up + (ML20057A272)
- ML20057A276 + (ML20057A276)
- ML20057A279 + (ML20057A279)
- ML20057A280 + (ML20057A280)
- ML20057A281 + (ML20057A281)