ML20057A247

From kanterella
Jump to navigation Jump to search
Forwards Topical Rept Evaluation of CEN-387-P, Pressurizer Surge Line Flow Stratification. C-E Owners Group Analysis Adequately Demonstrates That Bounding Surge Line & Nozzles Meet ASME Code Stress,Per NRC Bulletin 88-011
ML20057A247
Person / Time
Issue date: 07/14/1993
From: James Shea
Office of Nuclear Reactor Regulation
To: Burski R
C-E OPERATING PLANTS OWNERS GROUP, ENTERGY OPERATIONS, INC.
Shared Package
ML20057A248 List:
References
IEB-88-011, IEB-88-11, NUDOCS 9309130276
Download: ML20057A247 (2)


Text

_.

I' O

O July 14, 1993 1

Mr. R. F. Burski, Chairman DISTRIBUTION:

I Combustion Engineering Owners Group F Docket':FileM JShea j

Entergy Operations, Inc.

NRC & Local PDRs-JNorberg Post Office Box B PDI-2 Reading OGC 1

Killona, Louisiana 70066 SVarga ACRS(10)

JCalvo

Dear Mr. Burski:

M0'Brien(2)

HShaw

SUBJECT:

SAFETY EVALUATION FOR COMBUSTION ENGINEERING OWNERS GROUP REPORT l

CEN-387-P, REVISION 1, " PRESSURIZER SURGE.LINE THERMAL j

STRATIFICATION EVALUATION" (BULLETIN 88-11)

J

\\

The NRC staff and its consultant, Brookhaven National Laboratory, have j

completed their review of the Combustion Engineering Owners Group (CE0G)

Report CEN-387-P, " Pressurizer Surge Line Flow Stratification," including l

Revision I dated December 1991. The staff concludes that the CEOG analysis adequately demonstrates that the bounding surge line and nozzles meet ASME i

Code stress and fatigue requirements. for the 40-year design life ~ of CE0G t

l facilities considering the phenomenon of thermal stratification and thermal striping. The staff's safety evaluation (SE).of CEN-387-P, Revision 1, is l

l enclosed.

i j

Action 1.d of Bulletin 88-11 required licensees to update their stress and fatigue analyses to ensure compliance with applicable Code requirements. The CEOG Report CEN-387-P can be used by individual licensees to update plant-l specific Code stress reports as required by Item 1.d.

A copy of the SE has f

been forwarded to the respective CEOG licensees along with guidance for

[

completing Item 1.d.

l Sincerely,

/S/

Joseph W. Shea, Lead Project Manager NRC Bulletin 88-11 l

Project Directorate I-2 l

Division of Reactor Projects - 1/11 l

Office of Nuclear Reactor Regulation Iluation f

Bl.E CENTE COPY OFC PDhk PD[2)/fM PDI-2/D (b NAME N'Nh h ht MBoyle DATE I f/} b/93 1 _ /i//93 i/ l'}/93 f

OfflCIAL RECORD COPY I

8 FILENAME: G:\\ BULL 8811.SE

'h I

s-A*

/

(jfdAhzp A, H f-O

/D ? m'((Cnuwdn /

y 9309130276 930714 g

i g a g a / u g i u & /d.w :Egc g PDR TOPRP EMVC-E C

PDR

4 o

o p nauq

  1. 1

+

UNITED STATES

[

j NUCLEAR REGULATORY COMMISSION

  • /

I g

WASHINGTON, D.C. 206EilW1001 l

\\

/

July 14,1993 Mr. R. F. Burski, Chairman Combustion Engineering Owners Group Entergy Operations, Inc.

Post Office Box B Killona, Louisiana 70066

Dear Mr. Burski:

SUBJECT:

SAFETY EVALUATION FOR COMBUSTION ENGINEERING OWNERS GROUP REPORT I

CEN-387-P, REVISION 1, " PRESSURIZER SURGE LINE THERMAL l

STRATIFICATION EVALUATION" (BULLETIN 88-11)

The NRC staff and its consultant, Brookhaven National Laboratory, have completed their review of the Combustion Engineering Owners Group (CE0G) i Report CEN-387-P, " Pressurizer Surge Line Flow Stratification," including

e. --

Revision 1 dated December 1991. The staff concludes that the CE0G analysis i

adequately demonstrates that the bounding surge line and nozzles meet ASME Code stress and fatigue requirements for the 40-year design Tife of CEOG facilities considering the phenomenon of thermal stratification and thenmal striping. The staff's safety evaluation (SE) of CEN-387-P, Revision 1, is

+

enclosed.

Action 1.d of Bulletin 88-11 required licensees to update their stress and fatigue analyses to ensure compliance with applicable Code requirements.

The 1

CE0G Report CEN-387-P can be used by individual licensees to update plant-specific Code stress reports as required by Item 1.d.

A copy of the SE has been forwarded to the respective CEOG licensees along with guidance for completing Item 1.d.

Si re)y, f

Jos ph W. Shea, Lead Project Manager NRC Bulletin 88-11 Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation

--